The Fort Worth Press - Inventus Reports $1.16 Million in Gold Sales and 102% Return on Bulk Sample Cost at Pardo

USD -
AED 3.672504
AFN 65.000368
ALL 81.216919
AMD 362.051328
ANG 1.789785
AOA 917.000367
ARS 1515.25437
AUD 1.435956
AWG 1.80125
AZN 1.70397
BAM 1.739803
BBD 2.01708
BDT 123.195303
BGN 1.747831
BHD 0.378775
BIF 2997.464751
BMD 1
BND 1.281146
BOB 11.69239
BRL 5.065104
BSD 1.001468
BTN 95.050483
BWP 13.720589
BYN 3.015879
BYR 19600
BZD 2.014233
CAD 1.41575
CDF 2313.50392
CHF 0.825932
CLF 0.024881
CLP 979.255437
CNY 6.691204
CNH 6.686704
COP 3173.953654
CRC 455.099408
CUC 1
CUP 24.035938
CVE 98.087444
CZK 21.645304
DJF 178.33919
DKK 6.651204
DOP 61.433083
DZD 133.824668
EGP 53.529689
ERN 15
ETB 163.585998
EUR 0.889904
FJD 2.26765
FKP 0.750253
GBP 0.752078
GEL 2.590391
GGP 0.750253
GHS 11.695058
GIP 0.750253
GMD 73.503851
GNF 8810.21216
GTQ 7.652004
GYD 209.527198
HKD 7.84815
HNL 26.885202
HRK 6.703804
HTG 131.147978
HUF 323.310388
IDR 18053
ILS 3.09465
IMP 0.750253
INR 94.965504
IQD 1518.213762
IRR 1795877.503816
ISK 121.180386
JEP 0.750253
JMD 159.195837
JOD 0.70904
JPY 158.01504
KES 130.098296
KGS 87.450384
KHR 4070.631144
KMF 440.00035
KPW 899.999961
KRW 1334.740383
KWD 0.31082
KYD 0.834586
KZT 453.195748
LAK 22534.359294
LBP 89683.40524
LKR 331.690611
LRD 170.751234
LSL 16.462394
LTL 2.95274
LVL 0.60489
LYD 6.431526
MAD 9.729662
MDL 17.966464
MGA 4507.405595
MKD 54.836988
MMK 2100.071343
MNT 3596.488264
MOP 8.096339
MRU 40.037362
MUR 47.230378
MVR 15.460378
MWK 1736.600987
MXN 18.492904
MYR 4.083204
MZN 63.903729
NAD 16.462394
NGN 1331.210377
NIO 36.854512
NOK 9.427704
NPR 152.081128
NZD 1.767253
OMR 0.382413
PAB 1.001468
PEN 3.444825
PGK 4.547436
PHP 62.986038
PKR 277.237468
PLN 3.88825
PYG 5719.877241
QAR 3.660721
RON 4.730604
RSD 104.461148
RUB 84.13468
RWF 1478.183516
SAR 3.752837
SBD 8.064647
SCR 13.905529
SDG 601.503676
SEK 9.912404
SGD 1.282104
SHP 0.754745
SLE 24.680371
SLL 20969.504398
SOS 572.343548
SRD 37.794504
STD 20697.981008
STN 21.794245
SVC 8.763065
SYP 13001.999685
SZL 16.455989
THB 33.445038
TJS 9.228751
TMT 3.51
TND 2.98768
TOP 2.40776
TRY 49.513804
TTD 6.798915
TWD 32.453604
TZS 2646.44398
UAH 44.920874
UGX 4136.458658
UYU 40.314905
UZS 12073.121914
VES 878.910604
VND 25894.5
VUV 119.385856
WST 2.787824
XAF 583.738825
XAG 0.017551
XAU 0.000240063761
XCD 2.70255
XCG 1.804919
XDR 0.707052
XOF 583.738825
XPF 106.089045
YER 236.150363
ZAR 16.494037
ZMK 9001.203584
ZMW 20.049815
ZWL 321.999592
SSP 5750.775019
MXV 2.088032
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Inventus Reports $1.16 Million in Gold Sales and 102% Return on Bulk Sample Cost at Pardo
Inventus Reports $1.16 Million in Gold Sales and 102% Return on Bulk Sample Cost at Pardo

Inventus Reports $1.16 Million in Gold Sales and 102% Return on Bulk Sample Cost at Pardo

TORONTO, ON / ACCESS Newswire / March 18, 2026 / Inventus Mining Corp. (TSXV:IVS) ("Inventus" or the "Company") is pleased announce results for its Trench 1 bulk sample at its 100%-owned Pardo "River of Gold" Project, located 65 km northeast of Sudbury, Ontario.

Text size:

Highlights

  • 172 ounces of gold were recovered from 2,512 dry tonnes processed

  • Gold sales totalled $1,166,596

  • Gold sales exceeded direct bulk sample costs of $578,626 by 102%

  • Approximately 17,500 tonnes are stockpiled and ready for processing, with a further 20,000 tonnes permitted for extraction

Why These Results Matter for Investors

Wesley Whymark, CEO, comments:

"Pardo continues to demonstrate the combination of repeatable economics and growing geological confidence that investors want to see in an advancing gold project. The value of the recovered gold continues to materially exceed direct mining and processing costs, while each bulk sample campaign generates real operating data that improves confidence in grade predictability, helps refine the Company's upcoming resource estimate and reduces technical risk.

With approximately 17,500 tonnes already stockpiled and ready for processing, and a further 20,000 tonnes permitted for extraction, Inventus has a clear runway to build on these results. We believe continued bulk sampling can generate additional non-dilutive cash flow that can be used to further advance the project."

Near-Term Catalysts

  • Assay results are pending from 96 drill holes completed to date, with drilling ongoing

  • Processing of approximately 17,500 tonnes of stockpiled bulk sample material

  • A further 20,000 tonnes already permitted for extraction to support continued bulk sampling

Processing Results

A total of 2,512 dry tonnes were processed between January 26 and February 5, 2026. Reconciliation of the bulk sample was determined using pre- and post-run in-circuit inventories, and a total of 172 ounces of gold was recovered.

Based on the material processed to date, the Trench 1 bulk sample is estimated to have a head grade of 2.51 g/t gold and a metallurgical recovery of 85%. These figures are estimates because severe winter conditions affected the milling campaign. Material freezing within the milling circuit reduced throughput relative to the planned run and limited the reliability of tailings sampling. As only approximately 25% of the total bulk sample has been processed to date, the Company will provide a more complete metallurgical balance, including final reconciled head grade and recovery, once the remaining material has been processed under more representative operating conditions.

Direct Bulk Sample Costs

Direct bulk sample costs totalled approximately $578,626, equivalent to $230 per dry tonne processed (USD$169/tonne) and $3,364 per ounce recovered (USD$2,453/oz). These costs included grade-control drilling, extraction, crushing, hauling and processing. Corporate G&A and Inventus personnel costs were excluded, as these overlapped with other Company activities.

For further information visit www.inventusmining.com, or contact:

Wesley Whymark
CEO
Inventus Mining Corp.
E-mail: [email protected]
Phone: 705-822-3005

Social Media Accounts

X

LinkedIn

YouTube

Facebook

About Inventus Mining Corp.

Inventus is a mineral exploration and development company focused on the world-class mining district of Sudbury, Ontario. We have a 100% interest in our principal assets, the Pardo Paleoplacer Gold Project and the Sudbury 2.0 Critical Mineral Project, located northeast of Sudbury. The Pardo Gold Project is the first important paleoplacer gold discovery in North America. Inventus has approximately 209 million common shares outstanding.

Qualified Person

The Qualified Person responsible for the technical content of this news release is Wesley Whymark, P.Geo., who has reviewed and approved the technical disclosure in this news release on behalf of the Company.

Technical Information

The Trench 1 bulk sample was processed at McEwen Mining's Stock Mill, a fully permitted facility utilizing a conventional carbon in leach "CIL" flowsheet. The bulk sample material entered directly into the ball mill, where feed samples were collected for grade control. The material was milled to P95 (>95% passing 74 um) through a two-stage cyclone overflow re-grind ball mill circuit and then directed into the CIL tanks, where activated carbon adsorbed gold from solution. Tails were sampled after the final CIL tank discharge to determine metallurgical efficiency. The carbon load and circuit inventories were sampled, weighed and assayed before and after the bulk sample was processed to provide Inventus with an in-circuit inventory for reconciliation of the bulk sample.

Forward-Looking Statements

This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "if", "yet", "potential", "undetermined", "objective", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to the failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR+. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither TSX venture exchange nor its regulation services provider (as that term is defined in the policies of the TSX venture exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Inventus Mining Corp.



View the original press release on ACCESS Newswire

T.Gilbert--TFWP