The Fort Worth Press - Chennai Sets ₹100 Crore Flood-Readiness Plan for Vulnerable Areas

USD -
AED 3.673042
AFN 65.000368
ALL 79.715041
AMD 364.320403
ANG 1.789783
AOA 917.000367
ARS 1499.143585
AUD 1.395504
AWG 1.8
AZN 1.70397
BAM 1.679281
BBD 2.014502
BDT 123.298316
BGN 1.696366
BHD 0.37703
BIF 2992
BMD 1
BND 1.271197
BOB 11.727937
BRL 5.193604
BSD 1.00021
BTN 95.349267
BWP 13.402252
BYN 3.016542
BYR 19600
BZD 2.011669
CAD 1.39105
CDF 2273.000362
CHF 0.809457
CLF 0.023655
CLP 931.010396
CNY 6.72675
CNH 6.731305
COP 3211.02
CRC 451.378305
CUC 1
CUP 26.5
CVE 95.503894
CZK 20.838504
DJF 177.720393
DKK 6.453404
DOP 58.750393
DZD 133.39204
EGP 49.798455
ERN 15
ETB 160.503874
EUR 0.863104
FJD 2.198804
FKP 0.737808
GBP 0.738825
GEL 2.603861
GGP 0.737808
GHS 11.19504
GIP 0.737808
GMD 74.000355
GNF 8780.000355
GTQ 7.634879
GYD 209.263688
HKD 7.84235
HNL 26.870388
HRK 6.505404
HTG 130.854201
HUF 315.250388
IDR 17757.4
ILS 2.976204
IMP 0.737808
INR 95.43455
IQD 1310.5
IRR 1374575.000352
ISK 121.390386
JEP 0.737808
JMD 158.543444
JOD 0.70904
JPY 160.07504
KES 129.440385
KGS 87.450384
KHR 4045.503796
KMF 425.00035
KPW 900.000294
KRW 1377.570383
KWD 0.30892
KYD 0.833552
KZT 463.527826
LAK 22425.000349
LBP 89550.000349
LKR 328.019886
LRD 180.250382
LSL 15.990381
LTL 2.95274
LVL 0.60489
LYD 6.340381
MAD 9.289039
MDL 17.293533
MGA 4329.000347
MKD 52.82251
MMK 2099.727459
MNT 3597.739732
MOP 8.07707
MRU 40.110379
MUR 46.840378
MVR 15.460378
MWK 1736.000345
MXN 17.034504
MYR 4.025904
MZN 63.910377
NAD 15.990377
NGN 1341.580377
NIO 36.720377
NOK 9.375804
NPR 152.558483
NZD 1.691475
OMR 0.381078
PAB 1.00021
PEN 3.351504
PGK 4.42225
PHP 62.270375
PKR 277.550374
PLN 3.74735
PYG 5927.077117
QAR 3.645038
RON 4.539504
RSD 101.324183
RUB 86.149411
RWF 1469
SAR 3.789762
SBD 8.000184
SCR 13.880372
SDG 601.503676
SEK 9.57835
SGD 1.274504
SHP 0.740866
SLE 24.625038
SLL 20969.499227
SOS 571.503662
SRD 37.74037
STD 20697.981008
STN 21.375
SVC 8.75176
SYP 13001.999906
SZL 15.990369
THB 33.150369
TJS 9.25201
TMT 3.51
TND 2.913038
TOP 2.40776
TRY 48.240368
TTD 6.788276
TWD 31.638704
TZS 2644.998038
UAH 44.565558
UGX 3771.073837
UYU 40.278022
UZS 11825.000334
VES 790.677104
VND 26085
VUV 118.250696
WST 2.707834
XAF 563.222427
XAG 0.015062
XAU 0.000224
XCD 2.70255
XCG 1.80268
XDR 0.707052
XOF 563.000332
XPF 103.503591
YER 236.525037
ZAR 16.17251
ZMK 9001.203584
ZMW 18.929211
ZWL 321.999592
  • CMSD

    0.0000

    21.18

    0%

  • CMSC

    -0.0200

    21.29

    -0.09%

  • RELX

    0.2400

    36.54

    +0.66%

  • AZN

    -1.8200

    162.7

    -1.12%

  • BTI

    -0.1500

    56.13

    -0.27%

  • RBGPF

    0.0800

    70.77

    +0.11%

  • JRI

    -0.0500

    12.35

    -0.4%

  • RYCEF

    -0.2500

    20.5

    -1.22%

  • VOD

    0.1600

    16.04

    +1%

  • BCE

    0.0600

    23.46

    +0.26%

  • BP

    -0.1900

    42.15

    -0.45%

  • BCC

    -0.0200

    78.75

    -0.03%

  • NGG

    -0.0800

    79.35

    -0.1%

  • GSK

    0.5500

    50.82

    +1.08%

  • RIO

    -1.4800

    103.3

    -1.43%

Chennai Sets ₹100 Crore Flood-Readiness Plan for Vulnerable Areas
Chennai Sets ₹100 Crore Flood-Readiness Plan for Vulnerable Areas

Chennai Sets ₹100 Crore Flood-Readiness Plan for Vulnerable Areas

Chennai civic agencies are coordinating drainage, pumping, rescue and relief measures at locations made vulnerable by major infrastructure work ahead of the northeast monsoon.

Text size:

Civic agencies in Chennai have begun identifying sites at risk of flooding because of major projects involving Chennai Metro Rail, Tangedco and Metrowater, as the city prepares for the northeast monsoon.

With El Niño intensifying, Chief Minister C. Joseph Vijay ordered ₹100 crore for comprehensive precautionary measures. Agencies were directed to develop action plans and alternate engineering solutions for vulnerable locations.

Municipal Administration and Water Supply Secretary Gagandeep Singh Bedi reviewed the preparations at Ripon Buildings on Saturday. Chennai Metro Rail Managing Director Ashish Chatterjee, Greater Chennai Corporation Commissioner G.S. Sameeran and senior representatives of the Water Resources Department, Highways, the National Highways Authority of India, Tangedco, Metrowater and Southern Railway attended.

The GCC has identified 207 vulnerable locations. Storm-water drains have been constructed at 117, modular storage tanks with high-capacity discharge pumps have been installed at 20, and dedicated motor pumps have been stationed at 48. Officials said alternate solutions would cover the remaining sites.

The ₹100 crore allocation includes desilting storm-water drains, ward-level relief preparation, road restoration and repairs, the purchase and upkeep of heavy-duty pumps and deployment of 1,000 seasonal monsoon workers.

Authorities plan to keep 36 GCC boats and 275 fishing boats on standby with trained operators. The Fisheries Department is arranging the fishing vessels. The city will also prepare 215 flood-relief centers and 111 community kitchens.

Desilting is under way along 1,671 kilometers of storm-water drains and at 110,082 silt catch pits. Heavy equipment, motor pumps and mechanized tree cutters are being readied for emergency deployment.

More than 1,000 general volunteers and 721 residents’ welfare association members have been mobilized. The GCC plans to launch a Volunteer Registration App in the first week of September so residents can enroll directly for relief and rescue work.

The Integrated Command and Control Centre, the 1913 helpline and social-media monitoring teams have been told to address complaints immediately. Of 115 missing links in the drainage network, 42 have been reconnected; officials said the rest would be finished before the monsoon begins.

Southern Railway has completed desilting at three of 28 railway culverts and aims to complete the rest before the rains. Dedicated railway nodal officers have been appointed to coordinate the work.

Workers have pruned 50,625 tree branches to reduce the risk of limbs breaking or trees falling during strong winds.

The Water Resources and Highways departments were instructed to speed up desilting in major rivers and canals and accelerate drainage work along State and National Highways.

Tangedco was asked to raise electrical pillar boxes above ground level, ensure cables are safely underground with no exposed sections and enforce zero-leakage procedures intended to prevent electrocution during floods.

P.Navarro--TFWP