The Fort Worth Press - NASA scraps Tuesday Moon launch due to storm

USD -
AED 3.672503
AFN 62.999722
ALL 83.250299
AMD 377.459541
ANG 1.790083
AOA 917.000269
ARS 1396.262205
AUD 1.406153
AWG 1.8
AZN 1.702594
BAM 1.694705
BBD 2.008318
BDT 122.350128
BGN 1.709309
BHD 0.377507
BIF 2960.600993
BMD 1
BND 1.274164
BOB 6.904306
BRL 5.193199
BSD 0.997141
BTN 92.081275
BWP 13.550819
BYN 2.990815
BYR 19600
BZD 2.005372
CAD 1.369037
CDF 2264.999974
CHF 0.784705
CLF 0.022981
CLP 907.409805
CNY 6.88685
CNH 6.88185
COP 3701.14
CRC 467.377177
CUC 1
CUP 26.5
CVE 97.149527
CZK 21.16085
DJF 177.558271
DKK 6.474425
DOP 60.861277
DZD 132.077565
EGP 52.251214
ERN 15
ETB 157.000068
EUR 0.86642
FJD 2.20805
FKP 0.751829
GBP 0.748435
GEL 2.710033
GGP 0.751829
GHS 10.884974
GIP 0.751829
GMD 73.499785
GNF 8738.4866
GTQ 7.653371
GYD 209.039327
HKD 7.83725
HNL 26.570299
HRK 6.527104
HTG 130.795692
HUF 336.835504
IDR 16964.25
ILS 3.09945
IMP 0.751829
INR 92.39125
IQD 1310
IRR 1314000.000159
ISK 124.420233
JEP 0.751829
JMD 156.858158
JOD 0.709038
JPY 158.865014
KES 129.550256
KGS 87.450153
KHR 4001.403697
KMF 426.999748
KPW 900.043905
KRW 1486.090231
KWD 0.30667
KYD 0.830947
KZT 480.450219
LAK 21397.625856
LBP 89443.965349
LKR 310.510354
LRD 182.47119
LSL 16.689777
LTL 2.95274
LVL 0.60489
LYD 6.395004
MAD 9.36375
MDL 17.394507
MGA 4165.000213
MKD 53.423868
MMK 2100.153228
MNT 3574.497589
MOP 8.048436
MRU 40.105027
MUR 46.619679
MVR 15.44942
MWK 1736.99969
MXN 17.651635
MYR 3.917005
MZN 63.909805
NAD 16.689599
NGN 1352.87964
NIO 36.719505
NOK 9.578495
NPR 147.330387
NZD 1.706095
OMR 0.384496
PAB 0.99918
PEN 3.417501
PGK 4.30075
PHP 59.809751
PKR 279.250341
PLN 3.69215
PYG 6463.911273
QAR 3.643502
RON 4.413503
RSD 101.777007
RUB 82.373582
RWF 1459
SAR 3.754447
SBD 8.045182
SCR 14.272963
SDG 601.000071
SEK 9.275299
SGD 1.27605
SHP 0.750259
SLE 24.575981
SLL 20969.510825
SOS 568.841522
SRD 37.625007
STD 20697.981008
STN 21.225904
SVC 8.724509
SYP 110.875895
SZL 16.690088
THB 32.320032
TJS 9.557442
TMT 3.51
TND 2.932498
TOP 2.40776
TRY 44.217599
TTD 6.765416
TWD 31.896843
TZS 2608.729779
UAH 43.810415
UGX 3771.52085
UYU 40.615395
UZS 12137.498289
VES 447.80816
VND 26300
VUV 119.587146
WST 2.754209
XAF 568.371025
XAG 0.012542
XAU 0.0002
XCD 2.70255
XCG 1.797064
XDR 0.706871
XOF 570.500193
XPF 103.849931
YER 238.550133
ZAR 16.67759
ZMK 9001.196875
ZMW 19.448921
ZWL 321.999592
  • RBGPF

    0.1000

    82.5

    +0.12%

  • CMSC

    -0.0400

    22.95

    -0.17%

  • RYCEF

    0.3800

    16.5

    +2.3%

  • BCE

    0.1100

    26.01

    +0.42%

  • NGG

    -0.4700

    90.42

    -0.52%

  • JRI

    -0.0800

    12.46

    -0.64%

  • CMSD

    -0.0700

    22.88

    -0.31%

  • GSK

    -0.3600

    53.41

    -0.67%

  • RIO

    -0.0600

    89.8

    -0.07%

  • BCC

    1.2000

    72.92

    +1.65%

  • RELX

    -0.1800

    34.29

    -0.52%

  • VOD

    0.1500

    14.75

    +1.02%

  • BP

    0.9500

    43.85

    +2.17%

  • AZN

    -0.7200

    191.29

    -0.38%

  • BTI

    -0.3900

    60.55

    -0.64%

NASA scraps Tuesday Moon launch due to storm
NASA scraps Tuesday Moon launch due to storm / Photo: © AFP/File

NASA scraps Tuesday Moon launch due to storm

NASA has called off the scheduled Tuesday launch of its historic uncrewed mission to the Moon due to a tropical storm that is forecast to strengthen as it approaches Florida.

Text size:

After two previously canceled launch attempts, NASA is weighing returning the Artemis 1 mission rocket to its assembly site under the threat of extreme weather.

"NASA is forgoing a launch opportunity... and preparing for rollback (from the launchpad), while continuing to watch the weather forecast associated with Tropical Storm Ian," it said on Saturday.

The US National Hurricane Center (NHC) said Ian is due to "rapidly intensify" over the weekend as it moves toward Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

Currently south of Jamaica, the storm is expected to approach Florida's west coast "at or near major hurricane strength" early next week, threatening storm surge, flooding and hurricane-force winds across much of the state, the NHC said.

On the launchpad, the giant orange and white Space Launch System (SLS) rocket can withstand wind gusts of up to 137 kilometers (85 miles) per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

A decision on whether to roll back the rocket to the Vehicle Assembly Building is due to be taken by the Artemis 1 team on Sunday, "to allow for additional data gathering and analysis," with the operation, if necessary, starting late Sunday or Monday morning, NASA said.

Jim Free, associate administrator for the agency's exploration systems development directorate, said on Twitter that a "step-wise approach" to the decision to roll back preserves "a launch opportunity if conditions improve," indicating a launch date before October 5 was still on the table.

If not, the next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop it, in preparation for future Moon-bound journeys with humans aboard.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

A successful Artemis 1 mission would come as a huge relief to the US space agency, after years of delays and cost overruns.

But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The cost of the Artemis program is estimated to reach $93 billion by 2025, with its first four missions clocking in at a whopping $4.1 billion each, according to a government audit.

J.M.Ellis--TFWP