The Fort Worth Press - NASA's Tuesday Moon launch threatened by storm

USD -
AED 3.672962
AFN 65.000396
ALL 79.569641
AMD 363.410009
ANG 1.790365
AOA 918.000118
ARS 1512.732505
AUD 1.403509
AWG 1.8
AZN 1.684438
BAM 1.695609
BBD 2.01466
BDT 123.160418
BGN 1.683441
BHD 0.377012
BIF 2995
BMD 1
BND 1.273738
BOB 10.998357
BRL 5.144046
BSD 1.000308
BTN 95.98391
BWP 13.567066
BYN 3.037656
BYR 19600
BZD 2.011747
CAD 1.39515
CDF 2309.999597
CHF 0.819885
CLF 0.024143
CLP 953.330119
CNY 6.706399
CNH 6.706796
COP 3133.79
CRC 447.438348
CUC 1
CUP 26.5
CVE 95.999895
CZK 21.106303
DJF 177.71991
DKK 6.489345
DOP 58.850154
DZD 133.63037
EGP 52.199498
ERN 15
ETB 160.949926
EUR 0.86806
FJD 2.21295
FKP 0.741937
GBP 0.744595
GEL 2.603264
GGP 0.741937
GHS 11.505024
GIP 0.741937
GMD 73.99969
GNF 8795.314945
GTQ 7.636255
GYD 209.277425
HKD 7.844805
HNL 26.847168
HRK 6.531703
HTG 130.738787
HUF 316.004029
IDR 17690
ILS 3.027501
IMP 0.741937
INR 95.90965
IQD 1310.5
IRR 1374600.000237
ISK 121.320336
JEP 0.741937
JMD 157.856864
JOD 0.708988
JPY 155.228505
KES 129.498728
KGS 87.449898
KHR 4050.422208
KMF 427.000462
KPW 900.000318
KRW 1367.705023
KWD 0.30856
KYD 0.833583
KZT 444.773881
LAK 22392.336201
LBP 89575.662472
LKR 331.544497
LRD 173.548166
LSL 16.285389
LTL 2.95274
LVL 0.60489
LYD 6.345021
MAD 9.466964
MDL 17.439779
MGA 4325.19127
MKD 53.344315
MMK 2099.62457
MNT 3595.075141
MOP 8.082447
MRU 40.060447
MUR 47.290412
MVR 15.410502
MWK 1736.502094
MXN 17.15007
MYR 4.068397
MZN 63.892219
NAD 16.285247
NGN 1326.720329
NIO 36.811146
NOK 9.361295
NPR 153.579928
NZD 1.739085
OMR 0.384497
PAB 1.000282
PEN 3.355918
PGK 4.522953
PHP 62.724028
PKR 277.25311
PLN 3.781535
PYG 5918.765443
QAR 3.636395
RON 4.568901
RSD 101.865037
RUB 84.244494
RWF 1475.913668
SAR 3.753075
SBD 8.03625
SCR 14.650196
SDG 601.50092
SEK 9.78923
SGD 1.274225
SHP 0.742225
SLE 24.640299
SLL 20969.491881
SOS 571.673797
SRD 37.752497
STD 20697.981008
STN 21.240534
SVC 8.752834
SYP 13002.000254
SZL 16.283395
THB 33.282013
TJS 9.226022
TMT 3.5
TND 2.928519
TOP 2.40776
TRY 48.657898
TTD 6.782056
TWD 31.792499
TZS 2645.002985
UAH 44.609389
UGX 3916.077853
UYU 40.244484
UZS 11793.315705
VES 841.183975
VND 25998.5
VUV 118.157011
WST 2.736734
XAF 569.409897
XAG 0.01559
XAU 0.000231
XCD 2.70255
XCG 1.802758
XDR 0.707052
XOF 569.409897
XPF 103.393717
YER 236.499459
ZAR 16.289965
ZMK 9001.251421
ZMW 19.630588
ZWL 321.999592
SSP 5655.283496
MXV 1.944584
  • CMSC

    0.1600

    20.48

    +0.78%

  • JRI

    -0.1200

    11.5

    -1.04%

  • BCC

    -0.6200

    75.31

    -0.82%

  • BTI

    -0.4300

    56.09

    -0.77%

  • BCE

    -0.4000

    22.5

    -1.78%

  • GSK

    0.2800

    50.29

    +0.56%

  • RIO

    -1.4700

    95.79

    -1.53%

  • NGG

    1.1000

    76.03

    +1.45%

  • RBGPF

    0.0000

    69.99

    0%

  • BP

    -1.5800

    45.38

    -3.48%

  • RYCEF

    0.2600

    19.3

    +1.35%

  • CMSD

    0.2200

    20.29

    +1.08%

  • RELX

    0.0500

    34.27

    +0.15%

  • AZN

    1.0400

    162.89

    +0.64%

  • VOD

    -0.2200

    17.46

    -1.26%

NASA's Tuesday Moon launch threatened by storm
NASA's Tuesday Moon launch threatened by storm / Photo: © AFP/File

NASA's Tuesday Moon launch threatened by storm

NASA's historic uncrewed mission to the Moon is facing fresh difficulties.

Text size:

After technical problems derailed two launch attempts several weeks ago, a new liftoff of the Artemis 1 mission scheduled for Tuesday is now threatened by a storm gathering in the Caribbean.

The storm, which has not yet been assigned a name, is currently located south of the Dominican Republic.

But it is expected to grow into a hurricane in the coming days and could move north to Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

"Our plan A is to stay to course and to get the launch off on September 27," Mike Bolger, NASA's exploration ground systems manager, told reporters on Friday. "But we realized we also need to be really paying attention and thinking about a plan B."

That would entail wheeling the giant Space Launch System rocket back to the Vehicle Assembly Building, known as VAB.

"If we were to go down to Plan B we need a couple days to pivot from our current tanking test or launch configuration to execute rollback and get back into the protection of the VAB," Bolger said, adding that a decision should be made by early afternoon on Saturday.

On the launch pad the orange and white SLS rocket can withstand wind gusts of up to 137 kilometers per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

The next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns. But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The launch dates depend on NASA receiving a special waiver to avoid having to retest batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range to a populated area.

On Tuesday the launch window will open at 11:37 local time and will last 70 minutes.

If the rocket takes off that day, the mission will last 39 days before it lands in the Pacific Ocean on November 5.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

W.Lane--TFWP