The Fort Worth Press - NASA unsure next Moon rocket launch attempt possible this month

USD -
AED 3.672499
AFN 63.49745
ALL 82.633029
AMD 367.81347
ANG 1.790403
AOA 916.999952
ARS 1461.505699
AUD 1.441639
AWG 1.8
AZN 1.715562
BAM 1.715644
BBD 2.014246
BDT 122.861805
BGN 1.69088
BHD 0.3772
BIF 2987.24539
BMD 1
BND 1.295549
BOB 6.92556
BRL 5.173098
BSD 1.000105
BTN 94.687626
BWP 13.599361
BYN 2.808821
BYR 19600
BZD 2.011333
CAD 1.418805
CDF 2264.999622
CHF 0.80976
CLF 0.023111
CLP 909.649786
CNY 6.7748
CNH 6.78915
COP 3441.24
CRC 453.69217
CUC 1
CUP 26.5
CVE 96.725381
CZK 21.24805
DJF 178.090844
DKK 6.561625
DOP 58.536115
DZD 133.598219
EGP 49.725799
ERN 15
ETB 161.234408
EUR 0.87784
FJD 2.24285
FKP 0.754878
GBP 0.75675
GEL 2.645014
GGP 0.754878
GHS 11.225636
GIP 0.754878
GMD 72.999986
GNF 8763.311637
GTQ 7.629858
GYD 209.231741
HKD 7.84001
HNL 26.757135
HRK 6.615901
HTG 130.75668
HUF 311.258997
IDR 17921
ILS 2.996975
IMP 0.754878
INR 94.746197
IQD 1310.110704
IRR 1374999.999746
ISK 126.289781
JEP 0.754878
JMD 157.423814
JOD 0.708981
JPY 161.541504
KES 129.449525
KGS 87.450353
KHR 4014.105511
KMF 430.999706
KPW 900.00035
KRW 1536.210323
KWD 0.30902
KYD 0.833436
KZT 486.473447
LAK 22146.685497
LBP 89557.448376
LKR 334.602361
LRD 182.011965
LSL 16.491476
LTL 2.95274
LVL 0.60489
LYD 6.417656
MAD 9.360252
MDL 17.606449
MGA 4178.106825
MKD 54.12869
MMK 2099.387374
MNT 3579.000015
MOP 8.07637
MRU 39.722981
MUR 47.960227
MVR 15.460471
MWK 1734.153231
MXN 17.485902
MYR 4.140497
MZN 63.899865
NAD 16.491476
NGN 1368.395506
NIO 36.798891
NOK 9.7818
NPR 151.500026
NZD 1.761385
OMR 0.384502
PAB 1.000105
PEN 3.385323
PGK 4.386042
PHP 61.243499
PKR 278.148213
PLN 3.759275
PYG 6096.517967
QAR 3.645646
RON 4.606095
RSD 103.033017
RUB 74.553283
RWF 1466.604677
SAR 3.754291
SBD 8.065041
SCR 14.05647
SDG 600.500902
SEK 9.70755
SGD 1.295885
SHP 0.746601
SLE 24.749695
SLL 20969.503664
SOS 571.588975
SRD 37.4305
STD 20697.981008
STN 21.491605
SVC 8.751031
SYP 110.532098
SZL 16.486254
THB 33.201501
TJS 9.275777
TMT 3.51
TND 2.960315
TOP 2.40776
TRY 46.47955
TTD 6.79047
TWD 31.661499
TZS 2625.232026
UAH 44.892717
UGX 3660.590537
UYU 40.114211
UZS 12015.842175
VES 616.865275
VND 26325
VUV 118.758526
WST 2.756325
XAF 575.410972
XAG 0.016117
XAU 0.000243
XCD 2.70255
XCG 1.8024
XDR 0.713895
XOF 575.410972
XPF 104.61587
YER 238.649784
ZAR 16.483897
ZMK 9001.192558
ZMW 17.940666
ZWL 321.999592
  • RBGPF

    -0.2700

    60.34

    -0.45%

  • JRI

    -0.0200

    12.65

    -0.16%

  • CMSC

    -0.2100

    22.16

    -0.95%

  • BCE

    -0.6300

    22.65

    -2.78%

  • BCC

    -2.1200

    72.54

    -2.92%

  • GSK

    0.0700

    50.74

    +0.14%

  • RIO

    -0.7200

    99.36

    -0.72%

  • CMSD

    -0.2100

    22.08

    -0.95%

  • NGG

    1.5300

    80.97

    +1.89%

  • RYCEF

    0.2300

    18.63

    +1.23%

  • BTI

    -0.0100

    58.9

    -0.02%

  • BP

    0.6800

    39.78

    +1.71%

  • AZN

    1.5000

    176.43

    +0.85%

  • RELX

    -0.3500

    30.83

    -1.14%

  • VOD

    -0.1800

    14.12

    -1.27%

NASA unsure next Moon rocket launch attempt possible this month
NASA unsure next Moon rocket launch attempt possible this month / Photo: © AFP

NASA unsure next Moon rocket launch attempt possible this month

After scrapping a second attempt to get its new 30-story lunar rocket off the ground due to a fuel leak, NASA officials said Saturday it may not be possible to try again this month.

Text size:

The current launch window for NASA's Artemis 1 mission to the Moon ends Tuesday and is "definitely off the table," said Jim Free, associate administrator for Exploration Systems Development, at a press conference Saturday.

The next possible launch window is September 19 to October 4, and failing that, October 17 to 31, NASA said.

The ability to take off during those windows "will really depend on the options that the team comes back with likely on Monday or early Tuesday morning," said Free.

Millions around the globe tuned in to live coverage and crowds gathered on beaches in Florida on Saturday hoping to witness the historic blastoff of the Space Launch System (SLS).

But a leak near the base of the rocket was found as ultra-cold liquid hydrogen was being pumped in, forcing a halt.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

The first launch attempt on Monday had also been halted after engineers detected a fuel leak and a sensor showed that one of the rocket's four main engines was too hot.

"This is a whole new vehicle, a whole new technology, a whole new purpose of going back to the moon and preparation to go to Mars," said NASA administrator Bill Nelson. "Yes, it's hard."

Artemis mission manager Mike Sarafin described the hydrogen leak as "large," and said one of their "leading suspects" was a seal on a fueling tube.

Engineering teams believe they will have to replace the seal, either directly on the launch pad or after taking the rocket back to its assembly building a few miles away.

It was "too early" to entirely rule out a launch before the end of September, said Sarafin, who promised a status update next week.

NASA has previously said that the early October period would be complicated to coordinate because a crew of astronauts will be using the Kennedy Space Center for a rocket launch to the International Space Station.

In addition to the leak, another problem facing the SLS is its emergency self-destruct system.

Designed to explode in case the rocket deviates off course, the system will likely need to be reexamined before the next launch, which can only be done in the assembly building.

Bringing the rocket in and out of the building will take "several weeks," Sarafin said.

- Apollo's twin sister -

Once launched by SLS, the Orion capsule will take several days to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach.

The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

Mannequins equipped with sensors are standing in for astronauts on the Artemis 1 mission and will record acceleration, vibration and radiation levels.

The trip is expected to last around six weeks and one of its main objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth's atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

A successful Artemis 1 mission would come as a huge relief to the US space agency, after years of delays and cost overruns.

The cost of the Artemis program is estimated to reach $93 billion by 2025, with each of its first four missions clocking in at a whopping $4.1 billion per launch, according to a government audit.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with later missions envisaging a lunar space station and a sustainable presence on the lunar surface.

A crewed trip to the red planet aboard Orion, which would last several years, could be attempted by the end of the 2030s.

C.Rojas--TFWP