The Fort Worth Press - TGI Solar Power Group Publishes Research on Global Gas Turbine Shortage and Launches TGI Gas Turbine Exchange

USD -
AED 3.672501
AFN 64.500226
ALL 80.947117
AMD 360.430222
ANG 1.789785
AOA 918.000275
ARS 1545.574198
AUD 1.458825
AWG 1.8025
AZN 1.699807
BAM 1.743549
BBD 2.014201
BDT 124.684633
BGN 1.747831
BHD 0.377278
BIF 2991.682342
BMD 1
BND 1.278494
BOB 11.860357
BRL 5.592205
BSD 1.00008
BTN 93.98513
BWP 13.720001
BYN 2.994357
BYR 19600
BZD 2.011304
CAD 1.41887
CDF 2290.999769
CHF 0.825905
CLF 0.025055
CLP 986.079754
CNY 6.672802
CNH 6.677795
COP 3297.4
CRC 452.34508
CUC 1
CUP 24.001212
CVE 98.299494
CZK 21.83755
DJF 177.719603
DKK 6.70083
DOP 60.656578
DZD 136.575307
EGP 53.271033
ERN 15
ETB 162.77021
EUR 0.89636
FJD 2.25945
FKP 0.745155
GBP 0.749995
GEL 2.59025
GGP 0.745155
GHS 11.710587
GIP 0.745155
GMD 73.999826
GNF 8859.687441
GTQ 7.641802
GYD 209.550384
HKD 7.845395
HNL 26.881572
HRK 6.76901
HTG 131.085575
HUF 326.97605
IDR 18129.15
ILS 3.18295
IMP 0.745155
INR 93.7426
IQD 1516.057857
IRR 1902285.508254
ISK 122.640291
JEP 0.745155
JMD 158.721951
JOD 0.709007
JPY 158.810498
KES 129.939726
KGS 87.449804
KHR 4078.557929
KMF 438.99994
KPW 899.999961
KRW 1343.559824
KWD 0.31112
KYD 0.833363
KZT 446.483971
LAK 22510.073815
LBP 89553.682465
LKR 332.358631
LRD 169.999198
LSL 16.395017
LTL 2.95274
LVL 0.60489
LYD 6.410662
MAD 9.755417
MDL 17.970617
MGA 4537.674286
MKD 55.188895
MMK 2099.696522
MNT 3601.450067
MOP 8.080107
MRU 40.34233
MUR 46.920127
MVR 15.409971
MWK 1734.122597
MXN 18.67014
MYR 4.056397
MZN 63.910234
NAD 16.39487
NGN 1348.149865
NIO 36.800956
NOK 9.517835
NPR 150.377549
NZD 1.78778
OMR 0.384531
PAB 1.000071
PEN 3.408278
PGK 4.491377
PHP 63.170501
PKR 276.58297
PLN 3.94114
PYG 6173.609935
QAR 3.645457
RON 4.791302
RSD 105.411993
RUB 83.174666
RWF 1479.602753
SAR 3.760416
SBD 8.097299
SCR 13.933706
SDG 601.502977
SEK 9.891925
SGD 1.28244
SHP 0.744075
SLE 22.950245
SLL 20969.504398
SOS 571.530455
SRD 37.546021
STD 20697.981008
STN 21.841652
SVC 8.750925
SYP 13001.999685
SZL 16.399741
THB 33.640379
TJS 9.190242
TMT 3.51
TND 2.980472
TOP 2.40776
TRY 50.2329
TTD 6.782502
TWD 33.036984
TZS 2643.179371
UAH 45.486291
UGX 4080.286342
UYU 40.464463
UZS 11975.30589
VES 897.180251
VND 25600
VUV 120.001108
WST 2.780103
XAF 587.973516
XAG 0.019511
XAU 0.000248816257
XCD 2.70255
XCG 1.802321
XDR 0.707052
XOF 587.973516
XPF 106.319815
YER 236.507292
ZAR 16.563735
ZMK 9001.176996
ZMW 20.375579
ZWL 321.999592
SSP 5745.814556
MXV 2.098318
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

TGI Solar Power Group Publishes Research on Global Gas Turbine Shortage and Launches TGI Gas Turbine Exchange
TGI Solar Power Group Publishes Research on Global Gas Turbine Shortage and Launches TGI Gas Turbine Exchange

TGI Solar Power Group Publishes Research on Global Gas Turbine Shortage and Launches TGI Gas Turbine Exchange

Research finds refurbished and aviation-derived turbines are the fastest route to firm power for data centers, and that gas plants designed for conversion can become sites for small modular reactors. TGI AMIRON's Aktau, Kazakhstan campus serves as the case study.

Text size:

MIAMI, FL / ACCESS Newswire / November 10, 2026 / TGI Solar Power Group Inc. (OTCID:TSPG) ("TSPG" or the "Company") today released research finding that the global shortage of gas turbines has become one of the main constraints on new power for data centers and industry. The Company also announced the launch of the TGI Gas Turbine Exchange, a registry that matches buyers who need turbines with owners and mandated brokers who hold available units.

According to industry disclosures cited in the research, a heavy-duty gas turbine ordered from US ENERGY Company today is not expected to be delivered until around 2031. Major research forecasts that prices for new turbines will reach $600 per kilowatt by the end of 2027, nearly three times 2019 levels.

Key findings of the research include:

  • Orders far exceed factory output. Analysts estimated the global turbine backlog at about 110 GW at the end of 2025, against annual manufacturing capacity of 60-70 GW.
  • The largest manufacturers are sold out. Major US manufacturer reported 116 GW of gas turbine capacity under contract in the second quarter of 2026. European Energy reported a 69 GW backlog and Japanese Industries a 35 GW large-frame backlog.
  • Lead times run about five years for large units and 18-36 months for small ones.
  • Data centers are a major driver of demand. The International Energy Agency projects that data center electricity use will more than double to about 945 TWh by 2030, with gas-fired supply rising by about 175 TWh.
  • The turbine is less than half the cost of a plant. Based on published industry data, the turbine package typically accounts for 35-45% of total plant cost. The research estimates a 50 MW plant built on refurbished units at about $1,070-1,720 per kilowatt installed, before long-distance logistics and financing. Warranty terms vary widely, and used units sold as-is usually carry limited or no warranty.

The research identifies refurbished turbines, upgrades to installed fleets, and aviation engines converted for power generation as the fastest sources of firm power. It also finds that the strongest long-term case for gas is as a bridge to small modular reactors (SMRs). A gas plant can secure the land, grid connection, cooling water and permits that a reactor can later reuse. The U.S. Department of Energy has found that reusing existing power-plant assets could reduce new nuclear construction costs by up to 35%.

"Compute is no longer limited by chips alone. It is limited by how fast you can bring firm power to a site. With new heavy-duty turbines booked into the next decade, the megawatts that matter over the next three years have already been built. They sit in operating fleets, warehouses and overhaul shops around the world. The TGI Gas Turbine Exchange puts those units in front of the developers who need them, with the records and owner mandates every serious buyer should insist on," said Daniel Brody, Chief Information Officer of TGI Group.

TGI Gas Turbine Exchange. Developers, data center operators, utilities, equipment owners, brokers and remanufacturers can register a requirement or list available units at tgipower.com/exchange. TSPG introduces qualified counterparties and does not act as buyer, seller or agent unless agreed in writing. Brokers are introduced only with a written mandate from the equipment owner.

Aktau case study. The full report applies the gas-to-SMR pathway to the 51.7-hectare data center and logistics campus that TSPG's subsidiary, TGI AMIRON Corp., is developing in the Aktau Seaport Special Economic Zone in Kazakhstan. The campus is designed for an initial 200 MW, scaling to 500 MW. Aktau previously hosted the BN-350 reactor, which supplied power, heat and seawater desalination until 1999. Kazakhstan is assessing SMR technologies for a future nuclear project. Any nuclear phase at Aktau would be subject to Kazakhstan's national nuclear program, regulatory approval and site licensing.

"Aktau is one of the few places in Central Asia where nuclear power has already worked at scale, producing electricity, heat and fresh water from the Caspian for more than two decades. Gas lets us bring reliable power to the campus quickly and cleanly today. Designing the site so that small modular reactors can follow, as Kazakhstan's nuclear program and regulator allow, is the responsible way to build infrastructure that will outlast the turbines that start it," said Academician Bakhtay Sekerbayev of TGI AMIRON.

The full report, Gas Turbines as the Bridge to Small Modular Reactors, can be requested at tgipower.com/exchange#report.

Request the full report

The full report, Gas Turbines as the Bridge to Small Modular Reactors, covers turbine market data, installed cost, logistics and warranties, emissions and hydrogen readiness, gas-to-SMR site design and the Aktau case study.

Request your copy at https://tgipower.com/tgi-design-review/turbine-exchange/. The short form asks for:

FieldRequired
Full name, company and job titleYes (title optional)
Business email and countryYes
Role (developer, utility, owner, broker, investor, media and others)Yes
Area of interest (sourcing power, selling turbines, SMRs, investment, Central Asia, media)Optional
Power need or portfolio size, in MWOptional
Questions for the research teamOptional
Consent to be contacted about the requestYes

The report is sent by email. Requests may also be made to [email protected].

About TGI Solar Power Group Inc.

TGI Solar Power Group Inc. (OTCID:TSPG) and its affiliates develop energy, digital infrastructure and industrial projects in the United States and Central Asia. Its subsidiary TGI AMIRON Corp., headquartered in Miami, Florida, is a joint venture with AMIRON of Kazakhstan developing a data center and logistics campus in the Aktau Seaport Special Economic Zone. TGI Group Research publishes analysis of power, infrastructure and industrial markets. For more information, contact [email protected].

Forward-looking statements

This press release contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. These include statements about market conditions, equipment prices and lead times, technology timelines, the launch and operation of the TGI Gas Turbine Exchange, and the development of the Aktau campus, including any future power or nuclear phase. Words such as "expects," "plans," "designed," "forecast" and "may" identify such statements. They are based on current expectations and involve risks and uncertainties, including financing, regulatory approvals, equipment availability, counterparty performance and political and economic conditions in the United States and Kazakhstan. Actual results may differ materially. Third-party figures are cited from published sources and have not been independently verified by the Company. Cost figures identified as estimates are the Company's own and are not quotes or offers. The Company undertakes no obligation to update these statements except as required by law.

Contacts

Media and investor relations:
TGI Solar Power Group Inc.,
[email protected]

Sources cited in the research include GE Vernova, Siemens Energy and Mitsubishi Heavy Industries disclosures; Wood Mackenzie; the International Energy Agency; Utility Dive; POWER; Power Engineering; the U.S. Department of Energy; and USP&E. A full source list appears in the report.

SOURCE: TGI Solar Power Group, Inc.



View the original press release on ACCESS Newswire

M.McCoy--TFWP