The Fort Worth Press - Ameriwest Reports First Modern Assay Results from Historical Bornite Core, Including 170 Feet (52 Meters) at 6.17% CuEq(1)

USD -
AED 3.6725
AFN 65.000392
ALL 81.560537
AMD 360.775985
ANG 1.789785
AOA 917.000038
ARS 1513.259304
AUD 1.426757
AWG 1.8025
AZN 1.69852
BAM 1.745253
BBD 2.010361
BDT 122.920831
BGN 1.747831
BHD 0.376943
BIF 2992.879196
BMD 1
BND 1.277729
BOB 11.742397
BRL 5.026904
BSD 0.99809
BTN 95.053074
BWP 13.711808
BYN 3.005903
BYR 19600
BZD 2.007505
CAD 1.421535
CDF 2312.500085
CHF 0.833695
CLF 0.024908
CLP 980.310333
CNY 6.69215
CNH 6.693095
COP 3188.87
CRC 454.401456
CUC 1
CUP 23.954527
CVE 98.394667
CZK 21.766799
DJF 177.744859
DKK 6.67725
DOP 61.199631
DZD 134.533035
EGP 53.110599
ERN 15
ETB 163.034338
EUR 0.89323
FJD 2.244702
FKP 0.754659
GBP 0.75405
GEL 2.59497
GGP 0.754659
GHS 11.653162
GIP 0.754659
GMD 73.99995
GNF 8780.344165
GTQ 7.630461
GYD 208.818175
HKD 7.84804
HNL 26.791833
HRK 6.730802
HTG 130.556993
HUF 324.828003
IDR 17896.7
ILS 3.070525
IMP 0.754659
INR 94.93315
IQD 1512.171616
IRR 1779859.999974
ISK 121.67048
JEP 0.754659
JMD 158.507638
JOD 0.708975
JPY 158.464501
KES 129.709756
KGS 87.449776
KHR 4061.892099
KMF 439.999911
KPW 899.999961
KRW 1335.810052
KWD 0.31171
KYD 0.831738
KZT 447.662772
LAK 22447.38615
LBP 89384.56802
LKR 330.214649
LRD 170.186374
LSL 16.458174
LTL 2.95274
LVL 0.60489
LYD 6.420696
MAD 9.759245
MDL 17.935779
MGA 4506.353512
MKD 54.946281
MMK 2100.02843
MNT 3599.679138
MOP 8.068514
MRU 40.035874
MUR 47.609682
MVR 15.460224
MWK 1730.796688
MXN 18.36106
MYR 4.083097
MZN 63.904996
NAD 16.458174
NGN 1330.39558
NIO 36.729176
NOK 9.49681
NPR 152.085276
NZD 1.77988
OMR 0.38447
PAB 0.99809
PEN 3.443122
PGK 4.527952
PHP 62.869025
PKR 276.352441
PLN 3.90425
PYG 5706.789697
QAR 3.638278
RON 4.772694
RSD 104.865987
RUB 83.925021
RWF 1474.693033
SAR 3.75547
SBD 8.078071
SCR 13.80872
SDG 601.470907
SEK 9.962585
SGD 1.2819
SHP 0.754518
SLE 24.669955
SLL 20969.504398
SOS 570.38835
SRD 37.647505
STD 20697.981008
STN 21.863385
SVC 8.733208
SYP 13001.999685
SZL 16.461129
THB 33.582023
TJS 9.212593
TMT 3.5
TND 2.988292
TOP 2.40776
TRY 49.391298
TTD 6.787934
TWD 32.153499
TZS 2630.002982
UAH 45.026146
UGX 4132.460023
UYU 40.119931
UZS 11876.249286
VES 875.701602
VND 25890
VUV 119.372685
WST 2.788609
XAF 585.920422
XAG 0.017078
XAU 0.00024143713
XCD 2.70255
XCG 1.798883
XDR 0.707052
XOF 585.920422
XPF 106.421331
YER 236.198615
ZAR 16.48656
ZMK 9001.198006
ZMW 19.871586
ZWL 321.999592
SSP 5748.524006
MXV 2.073391
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Ameriwest Reports First Modern Assay Results from Historical Bornite Core, Including 170 Feet (52 Meters) at 6.17% CuEq(1)
Ameriwest Reports First Modern Assay Results from Historical Bornite Core, Including 170 Feet (52 Meters) at 6.17% CuEq(1)

Ameriwest Reports First Modern Assay Results from Historical Bornite Core, Including 170 Feet (52 Meters) at 6.17% CuEq(1)

Initial modern assay results include 190 ft grading 5.59% CuEq; 190 ft grading 3.25% CuEq, and 270 ft grading 1.27% CuEq from two historical drill holes, with results from five additional holes to follow

Text size:

VANCOUVER, BC / ACCESS Newswire / October 14, 2026 / Ameriwest Critical Metals Inc. (CSE:AWCM)(OTCQB:AWLIF)(FSE:5HV) ("Ameriwest" or the "Company") is pleased to announce initial analytical results from its program of re-sampling and assaying of preserved historical drill core at the Company's 100%-owned Bornite Cu-Au-Ag project in Oregon ("Bornite" or "Project").

Highlights

  • Hole CC24: 190.0 feet (ft) grading 5.59% Copper Equivalent (CuEq)from a depth of 230.0 ft to 420.0 ft, including 170.0 ft of 6.17% CuEq from a depth of 250.0 ft to 420.0 ft
  • Hole CC26: 190.0 ft of 3.26% CuEq from a depth of 270.0 ft to 460.0 ft, including 160.0 ft of 3.74% CuEq from 290.0 ft to 450.0 ft; 270 ft of 1.27% CuEq from 520.0 ft to 790.0 ft, including 20 ft of 1.71% CuEq from 530.0 ft to 550.0 ft, 20.0 ft of 1.89% CuEq from 600.0 ft to 620.0 ft, and 30 ft of 4.73% CuEq from 750.0 to 780.0 ft
  • Modern verification program underway: The results provide new analytical information for comparison with the historical assay database and will contribute to the Company's ongoing geological and resource evaluation work.
  • Additional results expected: CC24 and CC26 are the first two holes reported from a seven-hole historical core sampling and assaying program. Results from the remaining five holes are expected to provide further information for evaluation of the historical dataset.
  • Initial modern geochemical results show on average, higher numbers for copper (Cu), gold (Au) and silver (Ag), with CuEq values of up to 28% higher within certain intervals versus the historical database; however, the sample size remains too small to determine if this trend is statistically significant.

Initial Results

The initial results from two historical drill holes, CC24 and CC26, include substantial intervals of Cu mineralization with associated Au and Ag values. They represent an important step in the Company's ongoing evaluation of the historical drilling database and its objective of determining the technical work required to support the preparation of an initial current mineral resource estimate at Bornite. The program involves collecting new samples from preserved portions of historical drill core, originally drilled between 1976 and 1990, and analyzing those samples using modern laboratory methods.

David Watkinson, President and CEO of Ameriwest, commented:

"These initial results are extremely encouraging. Reporting 190 feet grading 2.88% Cu, 0.045 ounce per ton (opt) Au, and 0.822 opt Ag (5.59% CuEq), including 170 feet at 3.16% Cu, 0.050 opt Au, and 0.909 opt Ag (6.17% CuEq), represents a strong start to our re-sampling program. These are significant CuEq grades over substantial mineralized intervals, and the results reinforce our confidence in the potential of Bornite. The timing of these results is particularly compelling. Cu prices are trading near historic highs, while global demand is forecast to grow substantially. With this outlook, I believe this is an exceptional time to be advancing Cu projects like Bornite in the United States."

Modern Assay Results

The current program is designed to evaluate the reliability and consistency of historical Cu, Au, and Ag assay information through comparison with modern analyses at Bornite.

Selected intervals of preserved historical core are being re-sampled by cutting the remaining half-core into quarter-core samples and submitting them for laboratory analysis. The program also includes expanded multi-element analysis to evaluate the presence and distribution of other metals that may be associated with the Bornite mineralized system.

Table 1 below shows assay intercepts from drill holes CC24 and CC26 for Cu, Au, and Ag, and includes historical intercepts for comparison. The intercepts are based on CuEq grades greater than or equal to 0.5% CuEq, with additional "including" intercepts within the larger intervals of greater than or equal to 1.5% CuEq. Historical drill holes CC24 and CC26 have total recorded lengths of 601.0 ft and 838.0 ft, respectively. The current program involved re-sampling and assaying selected intervals of preserved core from these holes.

Table 1

Bornite Project: Modern Assaying Results Compared with Historical Assay Results

Significant Intercepts ≥ 0.5% CuEq (Including Subintervals ≥ 1.5% CuEq)

HOLE #

From (ft)

To (ft)

Length (ft)

Cu (%)

Ag opt

Au opt

CuEq (%)

CC24 Historical

230.0

420.0

190.0

2.53

0.729

0.027

4.36

including

250.0

420.0

170.0

2.79

0.808

0.030

4.82

CC24 Modern Assay

230.0

420.0

190.0

2.88

0.822

0.045

5.59

including

250.0

420.0

170.0

3.16

0.909

0.050

6.17

CC26 Historical

270.0

740.0

470.0

1.18

0.216

0.005

1.56

including

470.0

480.0

10.0

1.24

0.200

0.003

1.54

including

500.0

520.0

20.0

1.49

0.205

0.007

1.95

including

690.0

727.0

37.0

2.23

0.372

0.001

2.56

CC26 Modern Assay

270.0

460.0

190.0

2.40

0.591

0.009

3.26

including

290.0

450.0

160.0

2.76

0.668

0.010

3.74

CC26 Modern Assay

520.0

790.0

270.0

0.99

0.188

0.003

1.27

including

530.0

550.0

20.0

1.09

0.392

0.007

1.71

including

600.0

620.0

20.0

1.41

0.202

0.007

1.89

including

750.0

780.0

30.0

3.79

0.787

0.007

4.73

(1) Note: In this news release, all intervals are downhole lengths; true widths are currently unknown. CuEq grades were calculated using a Cu price of US$6.40 per pound, an Au price of US$4,500 per ounce, and an Ag price of US$75 per ounce. CuEq grades are calculated according to the formula: CuEq grade = (Cu grade) + (45.67641 x Au grade) + (0.80357 x Ag grade). Cu recovery of 95%, Au recovery of 90%, and Ag recovery of 95% were used, based on metallurgical test work completed by Plexus Resources and outlined in the Bornite Project Prefeasibility Analysis dated December 1992 which included metallurgical work by Dawson Metallurgical Laboratories. This data is historical in nature, predating the implementation of National Instrument 43-101 ("NI 43-101") and CIM standards. The same methodology was used to calculate CuEq grades in Ameriwest's June 3, 2026 press release.

Historical assays from hole CC26 included an interval from 270.0 ft to 740.0 ft that had a significant intercept greater than or equal to 0.5% CuEq. Re-sampled hole CC26 had two assay intervals with significant intercepts greater than or equal to 0.5% CuEq - from 270.0 ft to 460.0 ft and from 520.0 ft to 790.0 ft. In other words, when comparing the two re-sampled significant assay intervals to the single historic significant assay interval, there is a 60.0 ft gap from 460.0 ft to 520.0 ft in the re-sampling assays for CC26 that did not meet the cut-off grade. However, there is also an additional interval from 740.0 ft to 790.0 ft (50.0 ft) that met the 0.5% CuEq cut-off grade in the re-sample assays for hole CC26. Note that historic hole CC26 was never assayed from 750.0 ft to 838.0 ft, and the re-sampling program assayed this interval and found a significant assay interval greater than equal to 0.5% CuEq from 750.0 ft to 790.0 ft. (40.0 ft). For a direct comparison of historical and modern assays from CC26 over the same interval, historical significant assays greater than or equal to 0.5% CuEq from 270.0 ft to 740.0 ft were 1.18% Cu, 0.005 opt Au, and 0.216 opt Ag (1.56% CuEq) versus modern assays over the same interval of 1.29% Cu, 0.005 opt Au, and 0.300 opt Ag (1.75% CuEq).

Historical Drilling

The historical drilling database reviewed by Ameriwest includes information for 48 drill holes completed by Amoco, Cypress Minerals, and Plexus Resources between 1976 and 1990. This current database consists of 38,914.5 feet of historical drilling; however, historical records reviewed by the Company indicate that approximately 41,702.0 feet of drilling were completed at Bornite. The difference between the current database total and the historical reported total footage may relate to the lack of currently available information for holes CC07 and CC21 and/or to other historical holes drilled by those companies in the regional area that were not part of the Bornite target. Significant historical drill intercepts were released by Ameriwest in a June 3, 2026, press release, including Quality Assurance and Quality Control (QA/QC) information from that time.

Advancing the Bornite Mineralized System

Bornite hosts Cu-Au-Ag mineralization principally associated with bornite and chalcopyrite within a steeply oriented breccia pipe.

Historical exploration and the Company's preliminary geological modelling have identified three principal mineralized domains:

  • A historically identified higher-grade Cu-bearing shell near the perimeter of the breccia pipe;
  • A lower-grade mineralized interior within the pipe; and
  • Sheeted vein mineralization associated with the surrounding rock.

Ameriwest previously announced the completion of a preliminary 3D geological model by APEX Geoscience Ltd. (APEX), developed from the historical drill hole database. The model is intended to support further exploration planning and geological interpretation.

The modern quarter core samples were collected by APEX personnel and the initial modern assay results provide additional information for evaluating the mineralization within the Bornite system. A suite of certified reference materials (CRMs) were inserted with the quarter core samples. The extent, continuity and economic significance of the mineralized domains require further work.

No current mineral resource or mineral reserve has been established at Bornite, and no economic viability has been demonstrated.

Next Steps

Ameriwest is advancing a staged technical evaluation program at Bornite, with the following priorities:

  1. Complete historical core assaying: Obtain and review results from the remaining five historical drill holes included in the current program.
  2. Evaluate historical versus modern data: Conduct statistical comparisons and assess analytical reliability, potential biases and data limitations.
  3. Advance geological modelling: Integrate the additional assay information with existing geological interpretations, core logging and historical drilling records.
  4. Assess broader multi-element results: Evaluate analytical results for additional elements, where available, to better understand the geochemical characteristics of the Bornite system.
  5. Plan subsequent exploration: Continue technical planning and permitting activities for potential drilling designed to provide additional geological, metallurgical and resource evaluation information.

The Company intends to use the results of this work to assess the requirements for preparing an initial current mineral resource estimate for Bornite in accordance with NI 43-101 and CIM Definition Standards. Additional drilling and other technical work may be necessary.

Sampling, Analytical Procedures and QA/QC

Selected intervals of preserved historical drill core were reviewed, photographed and sampled under the supervision of APEX personnel and independent Qualified Person (QP) Mr. Michael Dufresne, M.Sc., P.Geol., P.Geo. Quarter-core samples were obtained by sawing the remaining half-core and were submitted under chain of custody to ALS Global Geochemistry (ALS) in Reno, Nevada, an independent analytical laboratory accredited to ISO/IEC 17025.

Sample preparation consisted of ALS CRU-31. Cu, Ag, and multi-element analyses were completed using ME-MS61 which includes four acid digestion of a 0.25 g aliquot and Inductively Coupled Plasma Mass Spectrometry (ICP-MS) analysis, with over-limit analyses completed using four acid digestion of a 0.4 g aliquot and Atomic Absorption analysis (AAS). Au was analyzed using ALS Au-ICP21, which includes fire assay with a 30 g aliquot followed by ICP finish for analysis.

The Company's QA/QC program for the assay work included a series of Au and Cu CRMs inserted at a frequency of approximately 1 in every 10 samples. Laboratory internal QA/QC procedures included the analysis of a number of CRMs, blanks and duplicates. The QP reviewed the analytical and QA/QC results and determined the results to be acceptable for the purposes of this disclosure.

Qualified Person Statement

David Watkinson, P.Eng., a non-independent qualified person under NI 43-101, has reviewed and approved the scientific and technical information contained in this news release. Mr. Watkinson is the CEO and a director of Ameriwest.

The modern sampling, assaying and the scientific and technical content of this news release has been reviewed and approved by Mr. Michael Dufresne, M.Sc., P.Geol., P.Geo., an independent qualified person as defined by NI 43-101.

About Ameriwest Critical Metals Inc.

Ameriwest is an exploration company focused on identifying and advancing strategic critical mineral projects in North America. The Company is currently advancing its Bornite Cu-Au-Ag project in Oregon and its Thompson Valley lithium clay property in Arizona. Ameriwest also owns a lithium clay property in Clayton Valley, Nevada, and has entered into a non-binding letter of intent with Pure Energy Minerals Limited concerning the proposed sale of its Railroad Valley lithium brine property in Nevada.

For more information on the Company, investors should review the Company's filings available at www.sedarplus.ca.

On Behalf of the Board of Directors

David Watkinson
Chief Executive Officer and Director

For further information, please contact:

Ameriwest Critical Metals Inc.
Tel: (416) 918-6785
Email: [email protected]

The Canadian Securities Exchange has not in any way passed upon the merits of the matters referenced herein and has neither approved nor disapproved the contents of this news release.

Caution Regarding Forward-Looking Information

Certain statements contained in this news release constitute forward-looking information within the meaning of applicable Canadian securities legislation. Such statements include, but are not limited to, statements concerning the completion and results of the Company's historical drill core sampling and assaying program, evaluation and verification of historical exploration information, geological modelling, multi-element analysis, exploration permitting, potential future drilling, metallurgical work and the possible preparation of a current mineral resource estimate.

Forward-looking information is based on assumptions and expectations considered reasonable by the Company as of the date of this release but is subject to known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those expressed or implied. These factors include, without limitation, uncertainties relating to mineral exploration, historical information and sample integrity, analytical results, geological interpretations, mineral resource estimation, metal prices, metallurgical recoveries, permitting, financing, environmental and regulatory requirements and other risks inherent in mineral exploration and development.

There is no assurance that the ongoing historical data verification program will establish the suitability of the historical drilling database for a current mineral resource estimate, that additional mineralization will be identified or that the Bornite Project will be determined to be economically viable.

Readers are cautioned not to place undue reliance on forward-looking information. The Company undertakes no obligation to update or revise such information except as required by applicable securities laws.

SOURCE: Ameriwest Critical Metals



View the original press release on ACCESS Newswire

H.Carroll--TFWP