The Fort Worth Press - CORRECTION FROM SOURCE: SLAM Reports 1.60% Copper Equivalent Over 14.45 Meters in Hole GW26-33; Trenching Gold-Antimony Targets on Moose Lake Project

USD -
AED 3.672497
AFN 65.000299
ALL 79.569641
AMD 363.409858
ANG 1.790365
AOA 918.000006
ARS 1507.786404
AUD 1.402003
AWG 1.80125
AZN 1.700088
BAM 1.695609
BBD 2.01466
BDT 123.160418
BGN 1.683441
BHD 0.377118
BIF 2991.820156
BMD 1
BND 1.273738
BOB 10.998357
BRL 5.144898
BSD 1.000308
BTN 95.98391
BWP 13.567066
BYN 3.037656
BYR 19600
BZD 2.011747
CAD 1.39366
CDF 2312.503214
CHF 0.818501
CLF 0.024154
CLP 953.749848
CNY 6.71145
CNH 6.70591
COP 3127.62
CRC 447.438348
CUC 1
CUP 26.5
CVE 95.595821
CZK 21.07295
DJF 178.127262
DKK 6.47764
DOP 59.048684
DZD 133.877982
EGP 52.198901
ERN 15
ETB 163.385076
EUR 0.86655
FJD 2.21295
FKP 0.741937
GBP 0.743145
GEL 2.597171
GGP 0.741937
GHS 11.488194
GIP 0.741937
GMD 73.503157
GNF 8795.314945
GTQ 7.636255
GYD 209.277425
HKD 7.844699
HNL 26.847168
HRK 6.5298
HTG 130.738787
HUF 315.586989
IDR 17687
ILS 3.027498
IMP 0.741937
INR 95.907349
IQD 1310.410896
IRR 1374599.999914
ISK 121.140073
JEP 0.741937
JMD 157.856864
JOD 0.709008
JPY 155.045019
KES 129.501832
KGS 87.449895
KHR 4050.422208
KMF 427.000011
KPW 900.000318
KRW 1367.304993
KWD 0.30854
KYD 0.833583
KZT 444.773881
LAK 22392.336201
LBP 89575.662472
LKR 331.544497
LRD 173.548166
LSL 16.285389
LTL 2.95274
LVL 0.60489
LYD 6.353115
MAD 9.432659
MDL 17.439779
MGA 4325.19127
MKD 53.344315
MMK 2099.62457
MNT 3595.075141
MOP 8.082447
MRU 40.051151
MUR 47.290362
MVR 15.389513
MWK 1734.543043
MXN 17.13729
MYR 4.044802
MZN 63.909789
NAD 16.285247
NGN 1326.92021
NIO 36.811146
NOK 9.352695
NPR 153.579928
NZD 1.735345
OMR 0.384499
PAB 1.000282
PEN 3.355918
PGK 4.522953
PHP 62.718023
PKR 277.25311
PLN 3.775165
PYG 5918.765443
QAR 3.636395
RON 4.561303
RSD 101.694019
RUB 84.330137
RWF 1475.913668
SAR 3.753075
SBD 8.03625
SCR 13.676962
SDG 601.498266
SEK 9.76976
SGD 1.27315
SHP 0.742225
SLE 24.639846
SLL 20969.491881
SOS 571.673797
SRD 37.752501
STD 20697.981008
STN 21.240534
SVC 8.752834
SYP 13002.000254
SZL 16.283395
THB 33.229499
TJS 9.226022
TMT 3.51
TND 2.928519
TOP 2.40776
TRY 48.657935
TTD 6.782056
TWD 31.7655
TZS 2645.002972
UAH 44.609389
UGX 3916.077853
UYU 40.244484
UZS 11793.315705
VES 841.184029
VND 25998.5
VUV 118.157011
WST 2.736734
XAF 568.419469
XAG 0.01544
XAU 0.00023
XCD 2.70255
XCG 1.802758
XDR 0.707052
XOF 568.419469
XPF 103.393717
YER 236.497564
ZAR 16.25115
ZMK 9001.19823
ZMW 19.630588
ZWL 321.999592
SSP 5655.283496
MXV 1.943135
  • RYCEF

    0.2600

    19.3

    +1.35%

  • CMSC

    0.1500

    20.47

    +0.73%

  • BTI

    -0.1350

    56.385

    -0.24%

  • NGG

    1.5000

    76.43

    +1.96%

  • RBGPF

    0.0000

    69.99

    0%

  • GSK

    0.1950

    50.205

    +0.39%

  • VOD

    -0.1050

    17.575

    -0.6%

  • BP

    -1.1200

    45.84

    -2.44%

  • RIO

    -0.0950

    97.165

    -0.1%

  • BCE

    -0.2950

    22.605

    -1.31%

  • CMSD

    0.1800

    20.25

    +0.89%

  • RELX

    0.1750

    34.395

    +0.51%

  • JRI

    0.0300

    11.65

    +0.26%

  • BCC

    0.1950

    76.125

    +0.26%

  • AZN

    1.5500

    163.4

    +0.95%

CORRECTION FROM SOURCE: SLAM Reports 1.60% Copper Equivalent Over 14.45 Meters in Hole GW26-33; Trenching Gold-Antimony Targets on Moose Lake Project
CORRECTION FROM SOURCE: SLAM Reports 1.60% Copper Equivalent Over 14.45 Meters in Hole GW26-33; Trenching Gold-Antimony Targets on Moose Lake Project

CORRECTION FROM SOURCE: SLAM Reports 1.60% Copper Equivalent Over 14.45 Meters in Hole GW26-33; Trenching Gold-Antimony Targets on Moose Lake Project

Original contained incorrect numerical values for silver ppm in table

14.45 meter intercept includes 3.48% CuEq over 1.9 meters and 2.61% CuEq over 4.9 meters. Trenching underway on Company's Moose Lake Gold-Antimony Project.

Text size:

MIRAMICHI, NB / ACCESS Newswire / September 16, 2026 / SLAM Exploration Ltd. (TSXV:SXL)(OTCQB:SXLXF) ("SLAM" or the "Company") is pleased to report a 14.45 meter ("m") core interval grading 1.60% copper equivalent ("Cu-Eq") from a semi-massive zone in hole GW26-33. This is in addition to the Company's new discoveries that resulted from testing VTEM plate models including the new discovery of massive sulphides 2,000 meters northwest of the Logan Zone in drillhole-GW26-36 reported in the August 14, 2026 news release.

Analytical results from Diamond Drill Hole GW26-33 include the following:

Cu Eq% values for GW26-33 are recovered grades calculated using a 95% recovery rate and metal prices for copper, nickel, and cobalt published September 14, 2026 on Daily Metal Price. Core was collected from the drill in trays and delivered to a secure logging facility in Bathurst, New Brunswick. After logging, samples were sawn using a diamond blade. Sawn half-core samples were numbered, collected in bags, tagged, and delivered to ALS in Moncton, NB for multi-element analysis. Samples that were over-limit for the ICP method were re-analyzed using method OG46.A series of blanks and standards samples are included at specific intervals for quality assurance. A total of 18 samples were collected from hole GW26-33.

Hole GW26-33 encountered the mineralized zone beginning at 33.15 core-meters from surface with initial 1.9 core-meter interval of mineralized zone grading 3.48% CuEq between 33.15-35.05 core-meters from surface. An additional sub-zone between 42.7-47.6 core-meters from surface returned 2.61% CuEq over 4.9 core meters. These intercepts are below the Granges zone.

The Company is pleased with the results and is awaiting assay results from hole GW26-36 that intersected a broad mineralized zone from 124.4 to 191.8m hosted in a coarse-grained gabbro. The mineralized zone contains several massive sulphide intervals including 126.5-128.6m, 140.7-142.0m, 142.35-142.4m, 144.5-144.7m, 151.0-151.7m along with semi-massive zones at 157.0-158.0m, 165.4-166.3m. This new sulphide discovery is located 2,000 meters northwest of the Logan zone.

MOOSE LAKE GOLD-ANTIMONY PROJECT

The Company has begun trenching on the Moose Lake gold-antimony project with a series of trenches on the Skull gold antimony occurrence. The Company uncovered the Skull zone with 8 trenches over a strike length of 250 meters. After the Skull was uncovered, the excavator moved southeast to the Moose Lake gold-antimony occurrence. The Company has traced the Moose Lake gold antimony zone over a strike length of 500 meters. According to preliminary field observations, the Skull and Moose Lake zones are epithermal quartz breccia deposits with visible stibnite (antimony) and arsenopyrite mineralization. Assays are pending on the first batch of 14 samples collected from Skull and submitted to ALS in Moncton for Multi-Element-ICP and Gold Fire-Assay-AA. The Moose Lake zone is open in all directions and trenching continues.

SLAM RESUMES DRILLING AFTER SCHEDULED MAINTENANCE

SLAM has recently resumed drilling on the Goodwin Project after a scheduled two-week break for maintenance on the contractor's drill rig and associated equipment. The Company utilized this time to assess the current drilling results, and field reconnaissance of future drilling locations, accessibility, and drill pads.

The Company is currently testing an anomaly 200-meters north of GW26-33. To date, the 2026 drilling program has drilled 2,754 meters on the Goodwin Copper-Nickel-Cobalt Project along with an additional 554 meters on the Company's wholly owned Jake Lee Gold Project. A total of 1,014 samples has been collected from the Goodwin Project to date. In a May 27, 2026, news release, SLAM announced a 7,000-meter diamond drill contract for the 2026 Exploration season. The aim of the Company's Goodwin drilling program is to target anomalies identified from the 2026 VTEM Airborne Survey results. Each hole to date has successfully intercepted sulphide mineralization within the modelled plate anomalies save for hole GW26-35 that was abandoned due to poor ground conditions at 44-core-meters below ground surface. The Company is pleased with the results from the VTEM survey to date and have been able to identify numerous anomalous trends within the Project.

Figure 3 VTEM Aeromagnetic CVD - Copper-Nickel Occurrences

NBJMAP Grant Of $60,000

SLAM Exploration Ltd. has been awarded a grant of $60,000 by the Province of New Brunswick in support of the 2026 diamond drilling campaign on the Goodwin copper-nickel-cobalt project. The Company wishes to thank the Province for its continued support and recognition of the strategic mineral potential at Goodwin.

Sampling and QA/QC Procedures

A total of 992 core samples has been collected from the 12 completed holes (GW26-26 through GW26-38, excluding the abandoned GW26-35) and submitted to ALS Chemex laboratory in Moncton for multi-element analysis using ME-ICP41. Quality control samples, comprising certified reference standards and blanks, were inserted at regular intervals in accordance with industry-standard protocols. All samples were collected, labelled and sealed by SLAM field personnel. Core is stored securely at the Company's core logging facility in Bathurst. Assay results will be reported in subsequent news releases as they are received.

About the Goodwin Project

The Goodwin copper-nickel-cobalt project covers 14,000 hectares (35,000 acres) in the mineral-rich Bathurst Mining Camp ("BMC") of New Brunswick, Canada. Background on the VTEM survey, target generation and the design of the current 7,000 meter program is set out in the Company's news releases dated June 1 and June 17, 2026. Significant historical intercepts on the property include a 64.90 meter core interval grading 2.19% Cu-Eq, including 3.84% Cu-Eq over a 31.20 meter core interval, from hole GW24-02, as reported in a news release dated August 7, 2024.

About SLAM Exploration Ltd.

SLAM Exploration Ltd. is a publicly listed resource company with a 40,000-hectare portfolio of mineral claim holdings in the mineral-rich province of New Brunswick. The portfolio is built around the Goodwin Copper Nickel Cobalt project in the Bathurst Mining Camp ("BMC") of New Brunswick. The Company also holds the Jake Lee gold project where a new gold vein discovered in 2025 has returned up to 40.5 g/t gold and 63.30 g/t silver from channel samples, and the Menneval gold project, where a soil anomaly measuring approximately 3,000 by 2,500 meters has returned gold-bearing samples up to 0.683 g/t gold.

SLAM is a project generator and expects to receive further cash and share payments in 2026. In 2025, the Company received 1,200,000 shares plus cash from Nine Mile Metals Inc. (NINE) pursuant to the Wedge project agreement, and a cash payment of $60,000 plus 180,000 shares of a private company pursuant to the Ramsay gold agreement. The Company holds NSR royalties and expects additional cash and share payments on both the Wedge copper-zinc project and the Ramsay gold project.

To view SLAM's corporate presentation, click here. Additional information is available on SLAM's website and on SEDAR+ at www.sedarplus.ca. Follow SLAM on X @SLAMGold, and join the Company newsletter here to receive timely company updates and news releases.

Qualifying Statement
Mike Taylor, P.Geo., President and CEO of SLAM Exploration Ltd., is a qualified person as defined by National Instrument 43-101 and has approved the contents of this news release.

Contact Information
Mike Taylor, President & CEO506-623-8960 · [email protected]
Jimmy Gravel, Vice-President902-273-2387 · [email protected]
SEDAR+: 00012459

Forward-Looking Statements

This news release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable Canadian securities laws. Forward-looking statements are not historical facts but instead represent management's expectations, estimates and projections regarding future events or circumstances, and are often identified by words such as "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential," "may," "could," "would," "might," or "will," and similar expressions.

Forward-looking statements in this news release include, but are not limited to, statements regarding: the exploration potential of the Goodwin copper-nickel-cobalt project; the interpretation of geological, geochemical and geophysical data; the identification and prioritization of exploration targets; the anticipated receipt and significance of pending assay results; the continuity and extent of mineralized structures; the timing and scope of future exploration programs; the Company's ability to advance its mineral projects; and the potential for future exploration success.

Forward-looking statements are based on reasonable assumptions made by the Company as of the date of this news release, including that historical exploration results and publicly reported third-party mineral resources are relevant for regional and exploration context; that geological interpretations and targeting models are reasonable; that pending assay results will be received within anticipated timeframes; that planned exploration activities can be executed as expected; that contractors, equipment, personnel and supplies will be available on acceptable terms; that commodity prices and market conditions will remain generally supportive; and that required permits, approvals and access rights will be obtained in a timely manner.

Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to differ materially from those expressed or implied, including the speculative nature of mineral exploration; the risk that exploration results, including pending assay results, may not confirm historical data or current interpretations; uncertainty regarding the continuity, grade and extent of mineralization; delays or changes to exploration programs; availability and cost of labour, equipment and contractors; fluctuations in commodity prices; availability of financing on acceptable terms; regulatory, environmental and permitting risks; operating hazards; and general economic, market and business conditions. Additional risk factors are described in the Company's most recently filed Management's Discussion and Analysis and other continuous disclosure documents available under the Company's profile on SEDAR+.

Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not undertake to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: SLAM Exploration Ltd.



View the original press release on ACCESS Newswire

P.Navarro--TFWP