The Fort Worth Press - Tunkillia Upgrade Drilling – 39,000m Phase 2 Complete Targeting JORC Resource Classification Upgrades; PFS Underway

USD -
AED 3.672504
AFN 65.000368
ALL 81.216919
AMD 362.051328
ANG 1.789785
AOA 917.000367
ARS 1515.25437
AUD 1.435956
AWG 1.80125
AZN 1.70397
BAM 1.739803
BBD 2.01708
BDT 123.195303
BGN 1.747831
BHD 0.378775
BIF 2997.464751
BMD 1
BND 1.281146
BOB 11.69239
BRL 5.065104
BSD 1.001468
BTN 95.050483
BWP 13.720589
BYN 3.015879
BYR 19600
BZD 2.014233
CAD 1.41575
CDF 2313.50392
CHF 0.825932
CLF 0.024881
CLP 979.255437
CNY 6.691204
CNH 6.686704
COP 3173.953654
CRC 455.099408
CUC 1
CUP 24.035938
CVE 98.087444
CZK 21.645304
DJF 178.33919
DKK 6.651204
DOP 61.433083
DZD 133.824668
EGP 53.529689
ERN 15
ETB 163.585998
EUR 0.889904
FJD 2.26765
FKP 0.750199
GBP 0.752078
GEL 2.590391
GGP 0.750199
GHS 11.695058
GIP 0.750199
GMD 73.503851
GNF 8810.21216
GTQ 7.652004
GYD 209.527198
HKD 7.84815
HNL 26.885202
HRK 6.703804
HTG 131.147978
HUF 323.310388
IDR 18053
ILS 3.09465
IMP 0.750199
INR 94.965504
IQD 1518.213762
IRR 1795877.503816
ISK 121.180386
JEP 0.750199
JMD 159.195837
JOD 0.70904
JPY 158.01504
KES 130.098296
KGS 87.450384
KHR 4070.631144
KMF 440.00035
KPW 899.999961
KRW 1334.740383
KWD 0.31082
KYD 0.834586
KZT 453.195748
LAK 22534.359294
LBP 89683.40524
LKR 331.690611
LRD 170.751234
LSL 16.462394
LTL 2.95274
LVL 0.60489
LYD 6.431526
MAD 9.729662
MDL 17.966464
MGA 4507.405595
MKD 54.836988
MMK 2099.858992
MNT 3597.263832
MOP 8.096339
MRU 40.037362
MUR 47.230378
MVR 15.460378
MWK 1736.600987
MXN 18.492904
MYR 4.083204
MZN 63.903729
NAD 16.462394
NGN 1331.210377
NIO 36.854512
NOK 9.427704
NPR 152.081128
NZD 1.767253
OMR 0.382413
PAB 1.001468
PEN 3.444825
PGK 4.547436
PHP 62.986038
PKR 277.237468
PLN 3.88825
PYG 5719.877241
QAR 3.660721
RON 4.730604
RSD 104.461148
RUB 84.13468
RWF 1478.183516
SAR 3.752837
SBD 8.064647
SCR 13.905529
SDG 601.503676
SEK 9.912404
SGD 1.282104
SHP 0.754745
SLE 24.680371
SLL 20969.504398
SOS 572.343548
SRD 37.794504
STD 20697.981008
STN 21.794245
SVC 8.763065
SYP 13001.999685
SZL 16.455989
THB 33.445038
TJS 9.228751
TMT 3.51
TND 2.98768
TOP 2.40776
TRY 49.513804
TTD 6.798915
TWD 32.453604
TZS 2646.44398
UAH 44.920874
UGX 4136.458658
UYU 40.314905
UZS 12073.121914
VES 878.910604
VND 25894.5
VUV 119.757204
WST 2.787783
XAF 583.738825
XAG 0.017551
XAU 0.000240063761
XCD 2.70255
XCG 1.804919
XDR 0.707052
XOF 583.738825
XPF 106.089045
YER 236.150363
ZAR 16.494037
ZMK 9001.203584
ZMW 20.049815
ZWL 321.999592
SSP 5758.113256
MXV 2.088032
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Tunkillia Upgrade Drilling – 39,000m Phase 2 Complete Targeting JORC Resource Classification Upgrades; PFS Underway
Tunkillia Upgrade Drilling – 39,000m Phase 2 Complete Targeting JORC Resource Classification Upgrades; PFS Underway

Tunkillia Upgrade Drilling – 39,000m Phase 2 Complete Targeting JORC Resource Classification Upgrades; PFS Underway

HIGHLIGHTS

  • ‘Phase 2' reverse circulation (RC) and diamond drilling (DD) Resource upgrade drilling complete, totalling 38,760m RC and DD drilling and 311 holes during intensive 5 month, 4 drilling rig campaign

  • Pre-Feasibility Study (PFS) underway for large-scale gold production, targeting Q1 CY27 publication

Text size:

ADELAIDE, AU / ACCESS Newswire / August 5, 2026 / Barton Gold Holdings Limited (ASX:BGD)(OTCID:BGDFF)(FRA:BGD3) (Barton or Company) is pleased to announce that 'Phase 2' Resource upgrade drilling at its South Australian Tunkillia Gold Project (Tunkillia) is complete.

A total of 57,653m has been drilled across 520 RC and DD holes during 'Phase 1' and 'Phase 2'; the objective is to upgrade mineralisation contained within the optimised open pits from Barton's May 2025 Tunkillia OSS to JORC 'Indicated' category, with the highest value of the 'S1' pit materials upgraded to 'Measured' category.

Tunkillia's S1 'Starter Pit' is modelled to yield 206koz Au and 491koz Ag at a cash cost of only A$997 / oz, producing over A$800m operating cash and repaying development more than 2x over in the first year.

Full details can be accessed in the complete announcement on the ASX website or directly by clicking here.

Figure 1 - Long section showing Area 223 'Main' pit and stages, and Tunkillia JORC MRE block model1

Commenting on Tunkillia's Phase 2 upgrade drilling, Barton Managing Director Alex Scanlon said:

"Firstly, I would like to thank our incredible Barton team for their massive efforts. Our drilling programs of the past 5 months have included 4 rigs across 3 different project sites, which all then converged on Tunkillia's 'Phase 2' drillout.

"Results to-date have generally exceeded expectations, with positive surprises in some zones offering material upside potential. We look forward to sharing a significant number of assays, and Resources upgrades, in the coming months."

Authorised by the Managing Director of Barton Gold Holdings Limited.

For further information, please contact:

Alexander Scanlon
Managing Director
[email protected]
+61 425 226 649

Jade Cook
Company Secretary
[email protected]
+61 8 9322 1587

About Barton Gold

Barton Gold is an ASX, OTC and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000ozpa with 2.2Moz Au & 3.1Moz Ag JORC Mineral Resources (79.9Mt @ 0.87g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia.*

Challenger Gold Project

  • 313koz Au + fully permitted Central Gawler Mill (CGM)

Tarcoola Gold Project

  • 20koz Au in fully permitted open pit mine near CGM

  • Tolmer discovery grades up to 84g/t Au & 17,600g/t Ag

Tunkillia Gold Project

  • 1.6Moz Au & 3.1Moz Ag JORC Mineral Resources

  • Competitive 120kozpa gold & 250kozpa silver project

Wudinna Gold Project

  • 279koz Au project located southeast of Tunkillia

  • Significant optionality, adjacent to main highway

Competent Persons Statement & Previously Reported Information

The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 (JORC).

Activity

Competent Person

Membership

Status

Tarcoola Mineral Resource (Stockpiles)

Dr Andrew Fowler (Consultant)

AusIMM

Member

Tarcoola Mineral Resource (Perseverance Mine)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Tarcoola Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tarcoola Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tunkillia Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Mineral Resource

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (above 215mRL)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (below 90mRL)

Mr Dale Sims

AusIMM / AIG

Fellow / Member

Wudinna Mineral Resource (Clarke Deposit)

Ms Justine Tracey

AusIMM

Member

Wudinna Mineral Resource (all other Deposits)

Mrs Christine Standing

AusIMM / AIG

Member / Member

The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. In accordance with ASX Listing Rule 5.19.2, the Company further confirms that the material assumptions underpinning any production targets and the forecast financial information derived therefrom continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.

Cautionary Statement Regarding Forward-Looking Information

This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.

* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 8 September 2025. Total Barton JORC (2012) Mineral Resources include 1,049koz Au (39.7Mt @ 0.82 g/t Au) in Indicated category and 1,186koz Au (40.2Mt @ 0.92 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.

SOURCE: Barton Gold Holdings Limited



View the original press release on ACCESS Newswire

W.Lane--TFWP