The Fort Worth Press - ESGold Receives Exploration Authorization From Québec Government and Continues to Advance Its Permitted Tailings Reprocessing Project

USD -
AED 3.672505
AFN 66.000063
ALL 82.450273
AMD 366.539753
AOA 918.000205
ARS 1499.765701
AUD 1.435039
AWG 1.8025
AZN 1.697658
BAM 1.721359
BBD 2.013906
BDT 123.438318
BHD 0.377046
BIF 2990.670657
BMD 1
BND 1.293522
BOB 11.394171
BRL 5.135402
BSD 0.999912
BTN 95.776272
BWP 13.773983
BYN 2.868333
BYR 19600
BZD 2.01101
CAD 1.409935
CDF 2260.000182
CHF 0.818545
CLF 0.023848
CLP 938.620373
CNY 6.766097
CNH 6.771585
COP 3214.62
CRC 454.937511
CUC 1
CUP 26.5
CVE 97.047602
CZK 21.243703
DJF 178.059224
DKK 6.564685
DOP 58.255845
DZD 133.59203
EGP 50.500803
ERN 15
ETB 161.38823
EUR 0.87825
FJD 2.23175
FKP 0.751676
GBP 0.752275
GEL 2.619958
GGP 0.751676
GHS 11.648529
GIP 0.751676
GMD 73.999922
GNF 8776.662457
GTQ 7.628058
GYD 209.154238
HKD 7.84134
HNL 26.786775
HRK 6.619601
HTG 130.681218
HUF 317.486497
IDR 18101.75
ILS 3.059605
IMP 0.751676
INR 95.66105
IQD 1309.898389
IRR 1375125.000365
ISK 124.89005
JEP 0.751676
JMD 158.344298
JOD 0.709028
JPY 163.831996
KES 129.549714
KGS 87.450122
KHR 4042.422109
KMF 433.000103
KRW 1455.794992
KWD 0.31061
KYD 0.833216
KZT 478.216863
LAK 22662.483112
LBP 89540.527814
LKR 336.007464
LRD 180.980461
LSL 16.802764
LTL 2.95274
LVL 0.60489
LYD 6.415272
MAD 9.380256
MDL 17.698469
MGA 4285.355947
MKD 54.145397
MMK 2100.175193
MNT 3595.831784
MOP 8.076167
MRU 39.997536
MUR 47.489943
MVR 15.459591
MWK 1733.857304
MXN 17.44049
MYR 4.092029
MZN 63.909908
NAD 16.802838
NGN 1365.38007
NIO 36.798099
NOK 9.68874
NPR 153.242387
NZD 1.729995
OMR 0.384512
PAB 0.999916
PEN 3.403626
PGK 4.409454
PHP 61.551013
PKR 277.745633
PLN 3.801098
PYG 6014.812598
QAR 3.645149
RON 4.594599
RSD 103.101012
RUB 78.854132
RWF 1465.851083
SAR 3.749088
SBD 8.064647
SCR 13.519603
SDG 600.490257
SEK 9.71765
SGD 1.292425
SLE 24.25015
SOS 571.466291
SRD 37.851499
STD 20697.981008
STN 21.563105
SVC 8.749378
SZL 16.80514
THB 33.527505
TJS 9.213999
TMT 3.51
TND 2.968844
TRY 47.380225
TTD 6.800739
TWD 32.382497
TZS 2646.502964
UAH 44.966137
UGX 3774.86358
UYU 40.169161
UZS 12048.98807
VES 741.881979
VND 26335
VUV 119.16662
WST 2.751008
XAF 577.325295
XAG 0.017489
XAU 0.000248
XCD 2.70255
XCG 1.802059
XDR 0.717231
XOF 577.327835
XPF 104.964377
YER 238.149986
ZAR 16.74554
ZMK 9001.199041
ZMW 18.698375
ZWL 321.999592
  • RYCEF

    -0.0700

    18.8

    -0.37%

  • RBGPF

    0.0000

    66

    0%

  • NGG

    0.2800

    81.49

    +0.34%

  • AZN

    2.3150

    171.955

    +1.35%

  • RIO

    -0.0300

    91.92

    -0.03%

  • BTI

    1.4700

    62.29

    +2.36%

  • VOD

    0.5700

    16.37

    +3.48%

  • CMSC

    0.1696

    21.89

    +0.77%

  • RELX

    2.0600

    37.71

    +5.46%

  • GSK

    1.7600

    53.74

    +3.28%

  • BP

    -0.4050

    41.905

    -0.97%

  • JRI

    0.0600

    12.97

    +0.46%

  • BCC

    2.5300

    80.75

    +3.13%

  • CMSD

    0.0120

    22.062

    +0.05%

  • BCE

    0.5550

    21.795

    +2.55%

ESGold Receives Exploration Authorization From Québec Government and Continues to Advance Its Permitted Tailings Reprocessing Project
ESGold Receives Exploration Authorization From Québec Government and Continues to Advance Its Permitted Tailings Reprocessing Project

ESGold Receives Exploration Authorization From Québec Government and Continues to Advance Its Permitted Tailings Reprocessing Project

Exploration Authorizations Clear the Way for Systematic Drilling of the Company's Historical Crown Pillar and Priority Exploration Targets

Text size:

VANCOUVER, BC / ACCESS Newswire / July 28, 2026 / ESGold Corp. (CSE:ESAU)(OTCQB:ESAUF)(FSE:Z7D) ("ESGold" or the "Company") is pleased to announce that it has received its Authorization of Impact-Causing Exploration Work ("ATI") from Québec's Ministère des Ressources naturelles et des Forêts for the Company's planned drilling program at its 100%-owned Montauban Gold-Silver Project in Québec ("Montauban Project").

Receipt of the ATI represents a major regulatory milestone for ESGold as the ATI allows the Company to proceed with final field preparations and contractor mobilization for its upcoming exploration program. The exploration program will be carried out concurrently with the continued development of ESGold's fully permitted tailings reprocessing operation, which remains the Company's primary near-term objective.

This initial exploration program will focus on systematically evaluating the historical crown-pillar mineralization and testing priority exploration targets developed through the integration of historical drilling, geological interpretation, Ambient Noise Tomography ("ANT") data and ESGold's evolving three-dimensional geological model.

Exploration Program Highlights

  • Tailings reprocessing remains the cornerstone of ESGold's near-term strategy.

  • Exploration drilling is complementary and supports long-term growth.

  • ESGold has received the ATI required to conduct its planned drilling program at the Montauban Project.

  • Final drill-site preparations, access planning and contractor mobilization are now advancing.

  • Initial drilling will focus on the historical crown-pillar area and selected priority exploration targets.

  • Drill results will be incorporated into ESGold's geological model and used to guide subsequent district-scale exploration.

  • ESGold is committed to transparent communication with local communities.

Planned Montauban Drill Program

The first component of the planned drill program will focus on the historical crown-pillar area, where ESGold intends to better define the geometry, continuity, thickness and grade distribution of the near-surface mineralization located within and surrounding the former mine workings.

The crown pillar represents an important target that has not previously been systematically evaluated using modern drilling, geophysics and three-dimensional geological modelling. Results from the program are expected to support an updated geological interpretation and guide future technical and resource evaluation work.

The Company also intends to test selected step-out and exploration targets identified through its ANT surveys, historical drilling and mine records, structural interpretation and integrated geological model.

ESGold's initial ANT survey and subsequent modelling identified an interpreted mineralized corridor extending approximately 900 metres in depth and over at least two kilometres of strike within the original survey area. The interpreted system widened at depth and remained open where it reached the boundaries of the initial survey coverage.

The Company subsequently expanded its ANT survey coverage to approximately 70 square kilometres to investigate the broader geological architecture of the Montauban district and identify additional priority targets.

The planned drilling program will begin the process of directly testing these geological interpretations.

From Interpretation to Physical Proof

Over the past several years, ESGold has consolidated and digitized extensive historical exploration information, completed modern geophysical surveys and developed an integrated geological model that has materially advanced the Company's understanding of the Montauban system.

Receipt of the ATI moves the exploration program from geological interpretation and target development into direct subsurface testing.

Drill core generated during the program will be logged, sampled and submitted to an accredited laboratory for analysis. Results will be incorporated into the Company's geological model and used to refine the location and sequencing of subsequent drill targets.

"This is a major milestone for ESGold and the Montauban Project," said Gordon Robb, Chief Executive Officer of ESGold Corp. "Receiving the ATI removes the principal regulatory dependency standing between the Company and the commencement of our planned exploration drilling.

"We have spent considerable time compiling historical information, completing modern geophysical work and developing an integrated geological model. We are now in a position to begin testing that work with the drill.

"Our initial focus will be the systematic evaluation of the historical crown pillar, together with priority targets generated through the integration of ANT imaging, historical drilling and structural interpretation. This is where geological interpretation begins to become physical proof.

"Exploration drilling will advance alongside construction of our permitted tailings to reprocessing operation. ESGold is now positioned to move both sides of its strategy forward: advancing the Montauban Project toward near-term operations while systematically evaluating the broader district-scale exploration opportunity."

The exploration program complements, rather than changes, ESGold's development strategy. While the Company continues advancing construction and commissioning of its permitted tailings processing operation, the drilling campaign is intended to strengthen the geological understanding of the Montauban district and support future exploration initiatives for the Company.

Next Steps for the Company

With the ATI now received, ESGold is finalizing drill-site preparation, access planning, contractor mobilization and the sequencing of its initial drill targets.

The program is expected to begin with drilling in the historical crown-pillar area, followed by targeted step-out holes designed to evaluate the potential continuation of mineralization along strike and at depth.

The Company's next key exploration milestones will include:

  • Mobilization of drilling personnel and equipment;

  • Commencement of drilling;

  • Completion of the initial crown-pillar holes;

  • Core logging, sampling and laboratory analysis; and

  • Release and integration of initial assay results.

The location, sequence and scope of individual drill holes may be adjusted based on field conditions, geological observations and results received during the program.

Any potential future extraction of crown-pillar material remains subject to additional drilling, technical evaluation, engineering review, economic analysis and any further regulatory approvals that may be required.

This initial exploration program does not change the Company's development priorities. The objective of this exploration program is to improve geological knowledge while construction and commissioning of the permitted tailings processing project continues.

Advancing Montauban on Two Fronts

This initial exploration program forms a central component of ESGold's dual-track strategy at its Montauban Project.

In parallel with drilling, the Company continues to advance construction, equipment procurement and site development for its permitted tailings reprocessing operation.

The Company's primary objective is to establish a near-term operating platform at Montauban while systematically testing the larger mineralized system surrounding the historical mining camp.

Receipt of the ATI adds a significant new catalyst to that strategy and provides ESGold with the authorization required to begin converting geological targets into drill-tested evidence.

Where feasible, ESGold intends to utilize local contractors, suppliers and service providers during the execution of this initial drill program.

Qualified Person Statement

The scientific and technical information contained in this news release has been reviewed and approved by André Gauthier, P. Eng. and P. Geo., a Director of ESGold Corp. and a Qualified Person within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

The geological interpretations and exploration targets discussed in this news release are conceptual in nature. There has been insufficient exploration to define a mineral resource associated with these targets, and it is uncertain whether further exploration will result in any target being delineated as a mineral resource.

About ESGold Corp.

ESGold Corp. (CSE:ESAU)(OTCQB:ESAUF)(FSE:Z7D) is a fully permitted, fully funded, pre-production mining company advancing a scalable clean mining model across North and South America. The Company's flagship Montauban Gold-Silver Project in Quebec is under construction. With a dual-track strategy of cash flow today and discovery tomorrow, ESGold is building a platform for clean, sustainable growth and long-term shareholder value.

For more information, please contact ESGold Corp. at +1-888-370-1059 or visit esgold.com for additional resources, including a French version of this press release, past news releases, a 3D model of the Montauban processing plant, media interviews, and opinion-editorial pieces.

Stay connected by following us on X (formerly Twitter), LinkedIn, and joining our Telegram channel.

For further information on the Company, please contact:

Email: [email protected] or [email protected] or [email protected]

Phone: 604-885-1348 or 1-888-370-1059 or 250-217-2321

On behalf of the Board of Directors of ESGold Corp.

Gordon Robb

Chief Executive Officer & Director

Forward-Looking Statements

This news release contains "forward-looking information" within the meaning of applicable Canadian securities laws, including statements regarding the metallurgical recoveries, project economics, construction timelines and equipment deliverables, and exploration activities and potential. Forward-looking information is based on reasonable assumptions believed to be current but involves known and unknown risks and uncertainties that may cause actual results to differ materially. Historical data referenced herein is not current, has not been independently verified by ESGold, and should not be relied upon for investment decisions. ESGold disclaims any obligation to update or revise forward-looking information except as required by law.

These forward-looking statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include, among other things: the construction timelines and exploration activities at the Montauban Project, the ANT-based 3D geological model, its results and interpretation of the same, conditions in general economic and financial markets; accuracy of assay results; geological interpretations from drilling results, timing and amount of capital expenditures; performance of available laboratory and other related services; future operating costs; the historical basis for current estimates of potential quantities and grades of target zones; the availability of skilled labour and no labour related disruptions at any of the Company's operations; no unplanned delays or interruptions in scheduled activities; all necessary permits, licenses and regulatory approvals for operations are received in a timely manner; the ability to secure and maintain title and ownership to properties and the surface rights necessary for operations; and the Company's ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

The Company cautions the reader that forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results and developments to differ materially from those expressed or implied by such forward-looking statements contained in this news release and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation and uncertainties of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses; availability of funds; failure to delineate potential quantities and grades of the target zones based on historical data; general market and industry conditions; and those factors identified under the caption "Risks Factors" in the Company's continuous disclosure documents filed on SEDAR+ at www.sedarplus.com

Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

Neither the Canadian Securities Exchange nor its Regulation Services Provider accept responsibility for the adequacy or accuracy of this release.

SOURCE: ESGold Corp.



View the original press release on ACCESS Newswire

T.Dixon--TFWP