The Fort Worth Press - Interpretation of High-Resolution Geophysics at Music Valley HREE Project

USD -
AED 3.67295
AFN 66.00018
ALL 80.066009
AMD 365.249926
ANG 1.789783
AOA 917.999667
ARS 1494.994298
AUD 1.411353
AWG 1.8
AZN 1.713532
BAM 1.689844
BBD 2.014455
BDT 122.025082
BGN 1.696366
BHD 0.377025
BIF 2987.5
BMD 1
BND 1.278101
BOB 11.57661
BRL 5.215298
BSD 1.000186
BTN 95.649807
BWP 13.500717
BYN 3.042111
BYR 19600
BZD 2.011569
CAD 1.39041
CDF 2270.000582
CHF 0.812175
CLF 0.023452
CLP 923.070272
CNY 6.743298
CNH 6.74695
COP 3115
CRC 449.280935
CUC 1
CUP 26.5
CVE 95.270804
CZK 20.90175
DJF 177.71974
DKK 6.457785
DOP 58.739626
DZD 132.910036
EGP 50.530501
ERN 15
ETB 161.79626
EUR 0.86381
FJD 2.208964
FKP 0.73738
GBP 0.738805
GEL 2.597447
GGP 0.73738
GHS 11.084996
GIP 0.73738
GMD 73.495518
GNF 8786.186101
GTQ 7.629268
GYD 209.249883
HKD 7.843885
HNL 26.817351
HRK 6.5088
HTG 130.825457
HUF 316.033501
IDR 17879
ILS 2.994501
IMP 0.73738
INR 95.78175
IQD 1310.281367
IRR 1374574.999375
ISK 122.830168
JEP 0.73738
JMD 158.0373
JOD 0.708972
JPY 159.589498
KES 129.440318
KGS 87.450282
KHR 4043.000285
KMF 424.99973
KPW 900.000294
KRW 1412.889818
KWD 0.30877
KYD 0.833492
KZT 461.941214
LAK 22540.942885
LBP 89566.055097
LKR 331.989787
LRD 181.533065
LSL 16.225889
LTL 2.95274
LVL 0.60489
LYD 6.372987
MAD 9.293278
MDL 17.253028
MGA 4307.91296
MKD 53.154037
MMK 2099.801401
MNT 3596.870401
MOP 8.080213
MRU 40.113705
MUR 47.000387
MVR 15.449939
MWK 1734.288331
MXN 17.071398
MYR 4.059898
MZN 63.90505
NAD 16.225889
NGN 1350.07937
NIO 36.807113
NOK 9.41944
NPR 153.044147
NZD 1.702455
OMR 0.384477
PAB 1.000168
PEN 3.368628
PGK 4.494615
PHP 61.854958
PKR 277.579544
PLN 3.73572
PYG 6034.292824
QAR 3.656087
RON 4.530701
RSD 101.410313
RUB 84.900741
RWF 1473.708766
SAR 3.746587
SBD 8.032258
SCR 13.871434
SDG 601.495489
SEK 9.539055
SGD 1.278475
SHP 0.740866
SLE 24.575006
SLL 20969.499227
SOS 571.633467
SRD 37.967015
STD 20697.981008
STN 21.16841
SVC 8.751625
SYP 13001.999906
SZL 16.214138
THB 33.10203
TJS 9.241503
TMT 3.51
TND 2.92919
TOP 2.40776
TRY 47.914301
TTD 6.782414
TWD 31.9439
TZS 2649.998035
UAH 44.804538
UGX 3730.824229
UYU 40.349581
UZS 11822.340881
VES 771.57685
VND 26177
VUV 118.338592
WST 2.726312
XAF 566.740682
XAG 0.015674
XAU 0.00023
XCD 2.70255
XCG 1.802598
XDR 0.707052
XOF 566.75782
XPF 103.042635
YER 237.125047
ZAR 16.266201
ZMK 9001.202368
ZMW 18.677991
ZWL 321.999592
  • CMSD

    -0.0900

    21.09

    -0.43%

  • RBGPF

    -2.6900

    68.65

    -3.92%

  • CMSC

    -0.1200

    21.24

    -0.56%

  • NGG

    0.8600

    82.15

    +1.05%

  • RELX

    0.9500

    34.51

    +2.75%

  • RYCEF

    0.2200

    21.06

    +1.04%

  • GSK

    0.8700

    51.15

    +1.7%

  • BCE

    0.0100

    23.36

    +0.04%

  • BTI

    0.6500

    56.38

    +1.15%

  • RIO

    -0.5200

    96.69

    -0.54%

  • BP

    0.5600

    43.41

    +1.29%

  • AZN

    3.2100

    160.1

    +2%

  • VOD

    -0.0700

    16.13

    -0.43%

  • BCC

    -1.7600

    80.18

    -2.2%

  • JRI

    -0.0400

    12.44

    -0.32%

Interpretation of High-Resolution Geophysics at Music Valley HREE Project
Interpretation of High-Resolution Geophysics at Music Valley HREE Project

Interpretation of High-Resolution Geophysics at Music Valley HREE Project

Ground truthing of three priority prospects underway

Text size:

SAN BERNARDINO, CA / ACCESS Newswire / June 17, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) (Dateline or the Company) is pleased to announce the geophysical interpretation of the Music Valley Heavy Rare Earth Project (Music Valley), located in Riverside and San Bernardino Counties, California, USA.

Highlights

  • Magnetic and Radiometric Processing Completed: Mitre Geophysics has completed processing of the Music Valley HREE Project datasets.

  • Favorable Structural Setting: The interpretation highlights numerous structures across the project area, increasing the likelihood for HREE concentration.

  • Priority Areas of Interest: Three prospect areas identified for follow up are all located on claims unaffected by the current litigation.

  • Mapping Geophysical Targets: Ground truth mapping underway by Dateline's HREE and structural geology consultants to confirm correlation with geophysical anomalies.

The magnetic and radiometric survey undertaken in March 2026 included all the 20,520 acres highlighted in the Music Valley Project announcement (ASX Announcement 11 March 2026).

The geophysical interpretation highlights significant structural detail, corresponding with areas that the USGS has mapped containing the favorable Pinto Gneiss unit. The Thorium rich domains appear to be the best proxy for HREE mineralization, with local faulting and contact with younger diorite intrusions expected to be the most prospective targets for exploration. The coincidence of these three features will be the focus of future mapping, sampling and drilling campaigns.

All three priority prospects are located outside the 252 claims that are the subject of court proceedings.

Dateline's Managing Director, Stephen Baghdadi, commented:

"Music Valley has always had the ingredients of a significant heavy rare earth district. What these surveys have done is show us where those ingredients come together.

"The interpretation has identified a series of structurally complex zones associated with elevated thorium signatures and favorable Pinto Gneiss geology. These are precisely the types of settings where we would expect rare earth mineralization to be concentrated.

"Rather than searching across a large land package, we are now focusing on a small number of highly prospective target areas. Tony Mariano Jr and Russell Mason are currently ground-truthing these prospects, and that work will guide the next phase of sampling and drill targeting."

Survey Interpretation

The most interesting feature was noted with the Th2/U ratio map from the radiometric survey. The high Th is considered a proxy for elevated HREE in the minerals monazite and xenotime. The processed data highlighted a number of structurally complex zones on the western side of the project for further examination. These appear to correlate in some zones where the Pinto Gneiss was mapped at the regional scale.

Figure 1: Th2/U ratio map (Viridis color palette, with 5% standard deviation stretch) developed to show high Thorium concentrations relative to normal granite / granite gneiss (Th/U ~1). The three priority prospects are highlighted.

The interpretation of the magnetic and radiometric surveys highlights two major structural trends, one trending 286o that is related to the Pinto Mountain Fault and a younger set trending more towards 330o. The Pinto Mountain Fault is connected to the San Andreas Fault Zone, which is a right lateral system taking up strain from the interaction of the continental US Plate with the Pacific Plate.

Figure 2: Reduced to Pole (RTP) residual total magnetic intensity data, underlain by the Tilt filtered version of this data, with Mitre structural interpretation overlain. The geology denoted as Xp represents the Pinto Gneiss target unit.

The younger 330o structures are more prevalent and have intensely deformed the older primary fabrics, leading to structural complexity on the ground. This was mapped by the Dateline consultants, who identified a more complex geology than shown in the regional scale mapping.

Commentary

The aerial geophysics surveys confirms that the Music Valley Project area has a number of structures that have the likelihood to concentrate fluids, with near E-W structures connected to and reacting to the San Andreas Fault Zone to the west. Very young transpressional faulting, mostly represented by the more 330o striking structures, are accommodating rotation around vertical axes. With all this very intense recent deformation, the preservation of much older (Paleoproterozoic) primary fabrics that have not been reactivated and transposed into the present day deformation fabric is unlikely.

The radiometric signature, particularly the Th elevation, shows that there is a strong structural overprint, rather than high radiogenic activity simply being controlled by lithology. This implies that whilst the Pinto Gneiss is the target rock unit, enrichment of REEs is likely to occur in areas of structural faulting where it has been concentrated.

There are three main zones identified for detailed ground truth mapping and sampling follow up. The southern area in the acquired Fermi claims has USGS mapped Pinto Gneiss and anomalous Th, the high Th zones in the NW corner of the project warrant attention and a zone in the southern centre of the project also contains anomalous Th values.

The three priority target zones for follow up are either within the claims acquired from Fermi Critical Minerals or within staked claims that are outside of the claims currently under litigation by US1 Critical Minerals.

Tony Mariano Jr and Russell Mason are currently at Music Valley undertaking ground truth mapping of the three priority prospects. A larger scale rock chip sampling program will be undertaken as part of this campaign. We expect to have further information on these priority prospects in the next two weeks.

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California and is located 10km north of Mountain Pass rare earth mine. Drill testing the REE potential at Colosseum has commenced.

On 11 May 2026, Dateline announced that the BFS economics for the Colosseum Gold Project generated a pre-tax NPV5 of US$785 million and a pre-tax IRR of 49.5% using a gold price of US$4,200/oz.

Dateline has also acquired the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

In March 2026, Dateline consolidated the Music Valley Heavy Rare Earth Project in Riverside and San Bernardino Counties, California. The region has known HREE mineralisation from USGS rock chip sampling, however it has not been subjected to modern exploration techniques.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

B.Martinez--TFWP