The Fort Worth Press - SLAM Drills Over 30 Meters of Massive Sulphide Beneath VTEM Conductor on the Goodwin Copper Nickel Cobalt Project

USD -
AED 3.673042
AFN 63.503991
ALL 82.403989
AMD 368.150403
ANG 1.790403
AOA 918.000367
ARS 1465.449815
AUD 1.426534
AWG 1.8025
AZN 1.70397
BAM 1.705709
BBD 2.013483
BDT 122.708482
BGN 1.69088
BHD 0.37702
BIF 2985
BMD 1
BND 1.290663
BOB 6.90816
BRL 5.151601
BSD 0.999721
BTN 94.239742
BWP 13.585663
BYN 2.777729
BYR 19600
BZD 2.010527
CAD 1.41635
CDF 2280.000362
CHF 0.807012
CLF 0.02293
CLP 902.460396
CNY 6.769604
CNH 6.783725
COP 3452.68
CRC 453.506829
CUC 1
CUP 26.5
CVE 96.403894
CZK 21.091104
DJF 177.720393
DKK 6.516504
DOP 58.403884
DZD 133.34504
EGP 49.986489
ERN 15
ETB 158.37504
EUR 0.871204
FJD 2.235504
FKP 0.755912
GBP 0.755744
GEL 2.64504
GGP 0.755912
GHS 11.303856
GIP 0.755912
GMD 73.000355
GNF 8777.503848
GTQ 7.625892
GYD 209.119888
HKD 7.83535
HNL 26.703838
HRK 6.566204
HTG 130.583803
HUF 306.820388
IDR 17826.55
ILS 2.956604
IMP 0.755912
INR 94.37505
IQD 1310
IRR 1375000.000352
ISK 125.530386
JEP 0.755912
JMD 157.959917
JOD 0.70904
JPY 161.30504
KES 129.470385
KGS 87.450384
KHR 4012.503796
KMF 425.00035
KPW 900.00035
KRW 1528.650383
KWD 0.30802
KYD 0.833035
KZT 487.855928
LAK 22030.000349
LBP 89550.000349
LKR 333.641485
LRD 182.150382
LSL 16.20377
LTL 2.95274
LVL 0.60489
LYD 6.375039
MAD 9.245039
MDL 17.654036
MGA 4200.000347
MKD 53.691363
MMK 2099.523204
MNT 3579.573337
MOP 8.070939
MRU 40.080379
MUR 47.570378
MVR 15.460378
MWK 1736.000345
MXN 17.345204
MYR 4.137904
MZN 63.903729
NAD 16.203727
NGN 1360.440377
NIO 36.610377
NOK 9.699904
NPR 150.787532
NZD 1.743376
OMR 0.384983
PAB 0.999725
PEN 3.384039
PGK 4.38775
PHP 60.716504
PKR 278.303701
PLN 3.71375
PYG 6138.96617
QAR 3.640504
RON 4.568104
RSD 102.170373
RUB 73.103247
RWF 1464
SAR 3.74824
SBD 8.061424
SCR 13.683262
SDG 600.503676
SEK 9.583504
SGD 1.292404
SHP 0.746601
SLE 24.750371
SLL 20969.503664
SOS 571.503662
SRD 37.402504
STD 20697.981008
STN 21.4
SVC 8.747449
SYP 110.532098
SZL 16.203649
THB 32.890369
TJS 9.272075
TMT 3.51
TND 2.91175
TOP 2.40776
TRY 46.437504
TTD 6.779085
TWD 31.715038
TZS 2630.985038
UAH 44.909735
UGX 3638.520172
UYU 39.96965
UZS 12005.000334
VES 596.036404
VND 26320
VUV 118.645306
WST 2.751804
XAF 572.078806
XAG 0.015419
XAU 0.00024
XCD 2.70255
XCG 1.801643
XDR 0.703697
XOF 565.000332
XPF 103.250363
YER 238.625037
ZAR 16.485037
ZMK 9001.203584
ZMW 17.919703
ZWL 321.999592
  • CMSC

    0.0500

    22.37

    +0.22%

  • NGG

    -1.2400

    79.44

    -1.56%

  • RBGPF

    -0.5300

    60.61

    -0.87%

  • CMSD

    0.0000

    22.29

    0%

  • BCC

    3.8500

    74.66

    +5.16%

  • RELX

    -0.8300

    31.18

    -2.66%

  • GSK

    -1.4800

    50.67

    -2.92%

  • BCE

    0.0000

    23.28

    0%

  • RIO

    -2.5900

    100.08

    -2.59%

  • JRI

    0.0500

    12.67

    +0.39%

  • BTI

    -0.5800

    58.91

    -0.98%

  • VOD

    -0.2300

    14.3

    -1.61%

  • RYCEF

    -0.0300

    18.4

    -0.16%

  • AZN

    -2.9600

    174.93

    -1.69%

  • BP

    -1.0400

    39.1

    -2.66%

SLAM Drills Over 30 Meters of Massive Sulphide Beneath VTEM Conductor on the Goodwin Copper Nickel Cobalt Project
SLAM Drills Over 30 Meters of Massive Sulphide Beneath VTEM Conductor on the Goodwin Copper Nickel Cobalt Project

SLAM Drills Over 30 Meters of Massive Sulphide Beneath VTEM Conductor on the Goodwin Copper Nickel Cobalt Project

SLAM Follows VTEM Survey With Massive Sulphide Intercepts in the Mineral-Rich Province of New Brunswick, Canada

Text size:

MIRAMICHI, NB / ACCESS Newswire / June 17, 2026 / SLAM Exploration Ltd. (TSXV:SXL) ("SLAM" or the "Company") is pleased to announce it has drilled over 30 meters of massive sulphide mineralization in diamond drill hole GW26-29 including a 26.10 meter ("m") massive sulfide core interval from 18.70 to 44.80 m; a 1.85 m zone from 46.75-48.60 m plus a 2.15 m zone of massive sulphides from 57.9-60.05 m. The Company has completed 4 diamond drill holes (GW26-26 to GW26-29) since mobilizing on June 1, 2026 for the 7,000 meter diamond drilling program on the Goodwin copper-nickel-cobalt project.

Figure 1 Hole GW26-29 Massive Sulphide Interval

All 4 holes have cut gabbro mineralized with pyrrhotite and assay results from all four holes are pending. A fifth hole, GW26-30, is currently in progress. The first 4 holes are described as follows:

GW26-26 - Designed to test a VTEM conductor 1,600 meters southeast of the Farquharson zone. Drilled at azimuth 055° and dip of -50° from a collar at 476 m elevation (N 5,237,581 / E 699,469) to a depth of 200 m. The hole intersected a sequence of gabbro and mafic tuff with disseminated to semi-massive pyrrhotite present throughout the mineralized intervals. Pyrrhotite occurs as disseminated blebs and stringers, with massive seams from 148.15 to 148.20 and 149.27 149.60. Chalcopyrite noted in the deeper portions of the hole. A total of 57 core samples were submitted for assay.

GW26-27 - Designed to test a VTEM conductor from a collar 80 meters east of the collar for Logan Zone hole GW24-15. Drilled at azimuth 215° and dip of -60° from a collar at 393 m elevation (N 5,239,345 / E 697,310) to a depth of 110 m. The hole intersected medium-grained gabbro with a sustained and progressive increase in pyrrhotite mineralization with depth across a 27.85 meter interval from 46.00 to 73.85 meters., demonstrating the strong association between the gabbro host rock and sulfide mineralization at this target. A total of 44 core samples were sawn and submitted for assay.

GW26-28 - Designed to test a VTEM conductor from the same collar location as Logan zone drill hole GW24-08. Drilled at azimuth 360° and dip of -45° from a collar at 395 m elevation (N 5,239,410 / E 697,180) to a depth of 163 m. The hole intersected chloritized volcanics and gabbro with disseminated pyrrhotite present throughout, including localized intervals of elevated sulfide concentration and a short interval of massive pyrrhotite from 120.42 to 120.51. A total of 9 core samples were sawn and submitted for assay.

GW26-29 - Highlight Hole - Designed to test a VTEM conductor 100 meters southeast of hole GW25-27. Drilled at azimuth 120° and dip of -80° from a collar at 395 m elevation (N 5,239,268 / E 697,385) to a final depth of 137 m, Three discrete intervals of massive sulfide were intersected within a competent gabbro host rock, with the host rock largely replaced by sulfide mineralization and core recovery remaining excellent throughout:

  • 18.7-44.8 m: 26.1 m of massive sulfide mineralization

  • 46.75-48.6 m: 1.85 m of massive sulfide mineralization

  • 57.9-60.05 m: 2.15 m of massive sulfide mineralization

The three zones combine for approximately 30.1 metres of massive sulfide over a downhole interval of approximately 42 metres, with the upper zone alone spanning over 26 continuous metres. Sulfide mineralization continues below the massive zones as disseminated and semi-massive pyrrhotite with associated chalcopyrite. The geometry and continuity of the sulphide system intersected in GW26-29 is consistent with the style of mineralization observed in significant magmatic copper-nickel-cobalt deposits. A total of 64 core samples were submitted for assay, and results are anticipated to be a significant catalyst for the program

All 4 holes were designed to test targets based on plate models derived from the new VTEM survey that was flown over the Goodwin copper-nickel-cobalt project in January, 2026. The VTEM plate model for L1560 predicted a flat-lying conductor of moderate (120 siemens) conductance at a vertical depth of 132.8 meters. This correlates with massive pyrrhotite seams drilled in hole GW25-26. From a total of 432 anomalies, the Company has constructed plate models for 24 conductors that range in depth from 30 meters to 320 meters. All of these models are potential extensions to the known zones of mineralization and could represent potential ovoid-type deposits with higher-grade mineralization at depth. The Goodwin copper-nickel-cobalt project covers 14,000 hectares (35,000 acres) in the mineral-rich Bathurst Mining Camp ("BMC") of New Brunswick, Canada.

The 7,000 meter drilling program will test for potential extensions far below and beyond the 3 known zones of copper-nickel-cobalt mineralization. The Company has drilled 25 holes on the Logan, Granges and Farquharson zones. Significant copper, nickel and cobalt intercepts include a 64.90 meter core interval, grading 2.19% Cu-Eq (copper-nickel-cobalt), including 3.84% Cu-Eq over a 31.20 meter core interval from hole GW24-02 as reported in a news release August 7, 2024. Significant gold values were also reported with up to 3.31 grams per tonne over 0.5m in hole GW24-01.

Figure 3 shows a broader and deeper target on line 1300 that is a potential extension of the Logan copper nickel cobalt zone as well as the more conductive target directly over the Granges zone. This target is 100 m southeast of the massive sulphide intercept in hole GW26-29. Figure 4 shows an untested target on L1120 that is similar to the profile over the Granges zone.

Figure 3 VTEM profile Granges and Logan Zones L1300

Figure 4 VTEM profile Untested Conductor L1120

Sampling and QA/QC Procedures: A total of 174 core samples have been collected from holes GW26-26 through GW26-29 and submitted for multi-element assay, carrying sequential identifiers 2301001 through 2301192. Eighteen quality control samples (certified reference standards and blanks) were inserted at regular intervals in accordance with industry standard protocols. All samples were collected, labelled, and sealed by SLAM field personnel. Core is stored securely at the Company core logging facility in Bathurst. Assay results will be reported in a subsequent news release.

About SLAM Exploration Ltd: SLAM Exploration Ltd. is a publicly listed resource company with a 40,000-hectare portfolio of mineral claim holdings in the mineral-rich province of New Brunswick. This portfolio is built around the Goodwin Copper Nickel Cobalt project in the Bathurst Mining Camp ("BMC") of New Brunswick. The Company drilled 10 holes in the 2025 diamond drilling campaign on the Goodwin copper-nickel-cobalt project. These followed significant copper, nickel and cobalt intercepts from 15 diamond drill holes reported by the Company in 2024. These include a 64.90 meter core interval grading 0.73% copper, 0.64% nickel and 0.05% cobalt for 2.19% copper equivalent ("Cu-Eq"), including 1.32% copper, 1.11% nickel and 0.09% cobalt for 3.84% Cu-Eq over a 31.20 meter core interval from hole GW24-02 as reported in a news release August 7, 2024. Significant gold values were also reported with up to 3.31 grams per tonne over 0.5m in hole GW24-01.

The Company discovered a new gold vein at Jake Lee in 2025 and recently reported up to 40.5 g/t gold and 63.30 g/t silver from channel samples cut from the vein. A 200 meter by 400 meter soil anomaly with gold grading up to 0.98 g/t gold lies adjacent to the east and north of the new gold vein. The Jake Lee claims are located 25 kilometers southeast of the Clarence Stream gold deposit where Galway Metals Inc. Clarence Stream is host to a 12.4M tonne indicated resource of 922,000 ounces at a grade of 2.31 g/t gold plus an inferred resource of 16.1m tonnes with 1,334,000 ounces at a grade of 2.60 g/t gold. (Reference: "Updated Mineral Resource Statement, Clarence Stream Deposits, New Brunswick, Canada, by SLR Consulting (Canada) Ltd., March 31, 2022").

The Company reported an expansion of the soil coverage on the Menneval gold project on January 7, 2026. A gold soil anomaly extends approximately 3,000 meters by 2,500 meters with gold-bearing samples ranging from 0.005 grams per tonne ("g/t") to 0.683 g/t gold. The results indicate potential extensions to a swarm of quartz veins previously discovered by SLAM. The Company previously reported core intervals include 3,955 g/t gold over 0.1m from the No. 18 vein (December 03, 2020), as well as 162.5 g/t gold over 0.2 m (December 13, 2021) and 56.90 g/t gold over 0.5 m (November 22, 2022) from the Maisie vein.

The Company is a project generator and expects to receive significant cash and share payments in 2026. SLAM received 1,200,000 shares plus cash from Nine Mile Metals Inc. (NINE) in 2025 pursuant to the Wedge project agreement. Also in 2025, the Company received a cash payment of $60,000 as well as 180,000 shares of a private company pursuant to the Ramsay gold agreement. The Company holds NSR royalties and expects to receive additional cash and share payments on the Wedge copper zinc project and on the Ramsay gold project.

To view SLAM's corporate presentation, click SXL-Presentation. Additional information is available on SLAM's website and on SEDAR+ at www.sedarplus.ca. Follow us on X @SLAMGold.Join our company newsletter by clicking SXL-News to receive timely company updates and press releases relating to SLAM Exploration.

Qualifying Statements: Mike Taylor P.Geo, President and CEO of SLAM Exploration Ltd., is a qualified person as defined by National Instrument 43-101, and has approved the contents of this news release.

CONTACT INFORMATION:

Mike Taylor, President & CEO
Contact: 506-623-8960
[email protected]

Jimmy Gravel, Vice-President
Contact 902-273-2387
[email protected]

SEDAR+: 00012459

Forward-Looking Statements

This news release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable Canadian securities laws. Forward-looking statements are not historical facts but instead represent management's expectations, estimates and projections regarding future events or circumstances. Forward-looking statements are often, but not always, identified by words such as "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential," "may," "could," "would," "might," or "will," and similar expressions.

Forward-looking statements in this news release include, but are not limited to: statements regarding the exploration potential of the Harry Brook gold-antimony project; the significance of historical gold and antimony occurrences; the interpretation of geological, geochemical, and geophysical data; the identification and prioritization of exploration targets; the anticipated receipt and significance of pending assay results from the Jake Lee Project; the continuity and extent of mineralized structures at Jake Lee and Menneval; the timing and scope of future exploration programs; the Company's ability to advance its mineral projects; and the potential for future exploration success..

Forward-looking statements are based on reasonable assumptions made by the Company as of the date of this news release, including, without limitation: that historical exploration results, mineral occurrences, and publicly reported third-party mineral resources are relevant for regional and exploration context; that geological interpretations and targeting models are reasonable; that pending assay results will be received within anticipated timeframes; that planned exploration activities can be executed as expected; that contractors, equipment, personnel, and supplies will be available on acceptable terms; that commodity prices and market conditions will remain generally supportive; and that required permits, approvals, and access rights will be obtained in a timely manner.

Forward-looking statements involve known and unknown risks, uncertainties, and other factors that may cause actual results, performance, or achievements to differ materially from those expressed or implied by such statements. These risks and uncertainties include, without limitation: the speculative nature of mineral exploration; the risk that exploration results, including pending assay results, may not confirm historical data or current interpretations; uncertainty regarding the continuity, grade, and extent of mineralization; delays or changes to exploration programs; availability and cost of labour, equipment, and contractors; fluctuations in commodity prices; availability of financing on acceptable terms; regulatory, environmental, and permitting risks; operating hazards; and general economic, market, and business conditions. Additional risk factors are described in the Company's most recently filed Management's Discussion and Analysis and other continuous disclosure documents available under the Company's profile on SEDAR+.

Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not undertake to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: SLAM Exploration Ltd.



View the original press release on ACCESS Newswire

T.Dixon--TFWP