The Fort Worth Press - SLAM Drills Over 30 Meters of Massive Sulphide Beneath VTEM Conductor on the Goodwin Copper Nickel Cobalt Project

USD -
AED 3.67295
AFN 66.00018
ALL 80.066009
AMD 365.249926
ANG 1.789783
AOA 917.999667
ARS 1494.994298
AUD 1.411353
AWG 1.8
AZN 1.713532
BAM 1.689844
BBD 2.014455
BDT 122.025082
BGN 1.696366
BHD 0.377025
BIF 2987.5
BMD 1
BND 1.278101
BOB 11.57661
BRL 5.215298
BSD 1.000186
BTN 95.649807
BWP 13.500717
BYN 3.042111
BYR 19600
BZD 2.011569
CAD 1.39041
CDF 2270.000582
CHF 0.812175
CLF 0.023452
CLP 923.070272
CNY 6.743298
CNH 6.74695
COP 3115
CRC 449.280935
CUC 1
CUP 26.5
CVE 95.270804
CZK 20.90175
DJF 177.71974
DKK 6.457785
DOP 58.739626
DZD 132.910036
EGP 50.530501
ERN 15
ETB 161.79626
EUR 0.86381
FJD 2.208964
FKP 0.73738
GBP 0.738805
GEL 2.597447
GGP 0.73738
GHS 11.084996
GIP 0.73738
GMD 73.495518
GNF 8786.186101
GTQ 7.629268
GYD 209.249883
HKD 7.843885
HNL 26.817351
HRK 6.5088
HTG 130.825457
HUF 316.033501
IDR 17879
ILS 2.994501
IMP 0.73738
INR 95.78175
IQD 1310.281367
IRR 1374574.999375
ISK 122.830168
JEP 0.73738
JMD 158.0373
JOD 0.708972
JPY 159.589498
KES 129.440318
KGS 87.450282
KHR 4043.000285
KMF 424.99973
KPW 900.000294
KRW 1412.889818
KWD 0.30877
KYD 0.833492
KZT 461.941214
LAK 22540.942885
LBP 89566.055097
LKR 331.989787
LRD 181.533065
LSL 16.225889
LTL 2.95274
LVL 0.60489
LYD 6.372987
MAD 9.293278
MDL 17.253028
MGA 4307.91296
MKD 53.154037
MMK 2099.801401
MNT 3596.870401
MOP 8.080213
MRU 40.113705
MUR 47.000387
MVR 15.449939
MWK 1734.288331
MXN 17.071398
MYR 4.059898
MZN 63.90505
NAD 16.225889
NGN 1350.07937
NIO 36.807113
NOK 9.41944
NPR 153.044147
NZD 1.702455
OMR 0.384477
PAB 1.000168
PEN 3.368628
PGK 4.494615
PHP 61.854958
PKR 277.579544
PLN 3.73572
PYG 6034.292824
QAR 3.656087
RON 4.530701
RSD 101.410313
RUB 84.900741
RWF 1473.708766
SAR 3.746587
SBD 8.032258
SCR 13.871434
SDG 601.495489
SEK 9.539055
SGD 1.278475
SHP 0.740866
SLE 24.575006
SLL 20969.499227
SOS 571.633467
SRD 37.967015
STD 20697.981008
STN 21.16841
SVC 8.751625
SYP 13001.999906
SZL 16.214138
THB 33.10203
TJS 9.241503
TMT 3.51
TND 2.92919
TOP 2.40776
TRY 47.914301
TTD 6.782414
TWD 31.9439
TZS 2649.998035
UAH 44.804538
UGX 3730.824229
UYU 40.349581
UZS 11822.340881
VES 771.57685
VND 26177
VUV 118.338592
WST 2.726312
XAF 566.740682
XAG 0.015674
XAU 0.00023
XCD 2.70255
XCG 1.802598
XDR 0.707052
XOF 566.75782
XPF 103.042635
YER 237.125047
ZAR 16.266201
ZMK 9001.202368
ZMW 18.677991
ZWL 321.999592
  • CMSD

    -0.0900

    21.09

    -0.43%

  • RBGPF

    -2.6900

    68.65

    -3.92%

  • CMSC

    -0.1200

    21.24

    -0.56%

  • NGG

    0.8600

    82.15

    +1.05%

  • RELX

    0.9500

    34.51

    +2.75%

  • RYCEF

    0.2200

    21.06

    +1.04%

  • GSK

    0.8700

    51.15

    +1.7%

  • BCE

    0.0100

    23.36

    +0.04%

  • BTI

    0.6500

    56.38

    +1.15%

  • RIO

    -0.5200

    96.69

    -0.54%

  • BP

    0.5600

    43.41

    +1.29%

  • AZN

    3.2100

    160.1

    +2%

  • VOD

    -0.0700

    16.13

    -0.43%

  • BCC

    -1.7600

    80.18

    -2.2%

  • JRI

    -0.0400

    12.44

    -0.32%

SLAM Drills Over 30 Meters of Massive Sulphide Beneath VTEM Conductor on the Goodwin Copper Nickel Cobalt Project
SLAM Drills Over 30 Meters of Massive Sulphide Beneath VTEM Conductor on the Goodwin Copper Nickel Cobalt Project

SLAM Drills Over 30 Meters of Massive Sulphide Beneath VTEM Conductor on the Goodwin Copper Nickel Cobalt Project

SLAM Follows VTEM Survey With Massive Sulphide Intercepts in the Mineral-Rich Province of New Brunswick, Canada

Text size:

MIRAMICHI, NB / ACCESS Newswire / June 17, 2026 / SLAM Exploration Ltd. (TSXV:SXL) ("SLAM" or the "Company") is pleased to announce it has drilled over 30 meters of massive sulphide mineralization in diamond drill hole GW26-29 including a 26.10 meter ("m") massive sulfide core interval from 18.70 to 44.80 m; a 1.85 m zone from 46.75-48.60 m plus a 2.15 m zone of massive sulphides from 57.9-60.05 m. The Company has completed 4 diamond drill holes (GW26-26 to GW26-29) since mobilizing on June 1, 2026 for the 7,000 meter diamond drilling program on the Goodwin copper-nickel-cobalt project.

Figure 1 Hole GW26-29 Massive Sulphide Interval

All 4 holes have cut gabbro mineralized with pyrrhotite and assay results from all four holes are pending. A fifth hole, GW26-30, is currently in progress. The first 4 holes are described as follows:

GW26-26 - Designed to test a VTEM conductor 1,600 meters southeast of the Farquharson zone. Drilled at azimuth 055° and dip of -50° from a collar at 476 m elevation (N 5,237,581 / E 699,469) to a depth of 200 m. The hole intersected a sequence of gabbro and mafic tuff with disseminated to semi-massive pyrrhotite present throughout the mineralized intervals. Pyrrhotite occurs as disseminated blebs and stringers, with massive seams from 148.15 to 148.20 and 149.27 149.60. Chalcopyrite noted in the deeper portions of the hole. A total of 57 core samples were submitted for assay.

GW26-27 - Designed to test a VTEM conductor from a collar 80 meters east of the collar for Logan Zone hole GW24-15. Drilled at azimuth 215° and dip of -60° from a collar at 393 m elevation (N 5,239,345 / E 697,310) to a depth of 110 m. The hole intersected medium-grained gabbro with a sustained and progressive increase in pyrrhotite mineralization with depth across a 27.85 meter interval from 46.00 to 73.85 meters., demonstrating the strong association between the gabbro host rock and sulfide mineralization at this target. A total of 44 core samples were sawn and submitted for assay.

GW26-28 - Designed to test a VTEM conductor from the same collar location as Logan zone drill hole GW24-08. Drilled at azimuth 360° and dip of -45° from a collar at 395 m elevation (N 5,239,410 / E 697,180) to a depth of 163 m. The hole intersected chloritized volcanics and gabbro with disseminated pyrrhotite present throughout, including localized intervals of elevated sulfide concentration and a short interval of massive pyrrhotite from 120.42 to 120.51. A total of 9 core samples were sawn and submitted for assay.

GW26-29 - Highlight Hole - Designed to test a VTEM conductor 100 meters southeast of hole GW25-27. Drilled at azimuth 120° and dip of -80° from a collar at 395 m elevation (N 5,239,268 / E 697,385) to a final depth of 137 m, Three discrete intervals of massive sulfide were intersected within a competent gabbro host rock, with the host rock largely replaced by sulfide mineralization and core recovery remaining excellent throughout:

  • 18.7-44.8 m: 26.1 m of massive sulfide mineralization

  • 46.75-48.6 m: 1.85 m of massive sulfide mineralization

  • 57.9-60.05 m: 2.15 m of massive sulfide mineralization

The three zones combine for approximately 30.1 metres of massive sulfide over a downhole interval of approximately 42 metres, with the upper zone alone spanning over 26 continuous metres. Sulfide mineralization continues below the massive zones as disseminated and semi-massive pyrrhotite with associated chalcopyrite. The geometry and continuity of the sulphide system intersected in GW26-29 is consistent with the style of mineralization observed in significant magmatic copper-nickel-cobalt deposits. A total of 64 core samples were submitted for assay, and results are anticipated to be a significant catalyst for the program

All 4 holes were designed to test targets based on plate models derived from the new VTEM survey that was flown over the Goodwin copper-nickel-cobalt project in January, 2026. The VTEM plate model for L1560 predicted a flat-lying conductor of moderate (120 siemens) conductance at a vertical depth of 132.8 meters. This correlates with massive pyrrhotite seams drilled in hole GW25-26. From a total of 432 anomalies, the Company has constructed plate models for 24 conductors that range in depth from 30 meters to 320 meters. All of these models are potential extensions to the known zones of mineralization and could represent potential ovoid-type deposits with higher-grade mineralization at depth. The Goodwin copper-nickel-cobalt project covers 14,000 hectares (35,000 acres) in the mineral-rich Bathurst Mining Camp ("BMC") of New Brunswick, Canada.

The 7,000 meter drilling program will test for potential extensions far below and beyond the 3 known zones of copper-nickel-cobalt mineralization. The Company has drilled 25 holes on the Logan, Granges and Farquharson zones. Significant copper, nickel and cobalt intercepts include a 64.90 meter core interval, grading 2.19% Cu-Eq (copper-nickel-cobalt), including 3.84% Cu-Eq over a 31.20 meter core interval from hole GW24-02 as reported in a news release August 7, 2024. Significant gold values were also reported with up to 3.31 grams per tonne over 0.5m in hole GW24-01.

Figure 3 shows a broader and deeper target on line 1300 that is a potential extension of the Logan copper nickel cobalt zone as well as the more conductive target directly over the Granges zone. This target is 100 m southeast of the massive sulphide intercept in hole GW26-29. Figure 4 shows an untested target on L1120 that is similar to the profile over the Granges zone.

Figure 3 VTEM profile Granges and Logan Zones L1300

Figure 4 VTEM profile Untested Conductor L1120

Sampling and QA/QC Procedures: A total of 174 core samples have been collected from holes GW26-26 through GW26-29 and submitted for multi-element assay, carrying sequential identifiers 2301001 through 2301192. Eighteen quality control samples (certified reference standards and blanks) were inserted at regular intervals in accordance with industry standard protocols. All samples were collected, labelled, and sealed by SLAM field personnel. Core is stored securely at the Company core logging facility in Bathurst. Assay results will be reported in a subsequent news release.

About SLAM Exploration Ltd: SLAM Exploration Ltd. is a publicly listed resource company with a 40,000-hectare portfolio of mineral claim holdings in the mineral-rich province of New Brunswick. This portfolio is built around the Goodwin Copper Nickel Cobalt project in the Bathurst Mining Camp ("BMC") of New Brunswick. The Company drilled 10 holes in the 2025 diamond drilling campaign on the Goodwin copper-nickel-cobalt project. These followed significant copper, nickel and cobalt intercepts from 15 diamond drill holes reported by the Company in 2024. These include a 64.90 meter core interval grading 0.73% copper, 0.64% nickel and 0.05% cobalt for 2.19% copper equivalent ("Cu-Eq"), including 1.32% copper, 1.11% nickel and 0.09% cobalt for 3.84% Cu-Eq over a 31.20 meter core interval from hole GW24-02 as reported in a news release August 7, 2024. Significant gold values were also reported with up to 3.31 grams per tonne over 0.5m in hole GW24-01.

The Company discovered a new gold vein at Jake Lee in 2025 and recently reported up to 40.5 g/t gold and 63.30 g/t silver from channel samples cut from the vein. A 200 meter by 400 meter soil anomaly with gold grading up to 0.98 g/t gold lies adjacent to the east and north of the new gold vein. The Jake Lee claims are located 25 kilometers southeast of the Clarence Stream gold deposit where Galway Metals Inc. Clarence Stream is host to a 12.4M tonne indicated resource of 922,000 ounces at a grade of 2.31 g/t gold plus an inferred resource of 16.1m tonnes with 1,334,000 ounces at a grade of 2.60 g/t gold. (Reference: "Updated Mineral Resource Statement, Clarence Stream Deposits, New Brunswick, Canada, by SLR Consulting (Canada) Ltd., March 31, 2022").

The Company reported an expansion of the soil coverage on the Menneval gold project on January 7, 2026. A gold soil anomaly extends approximately 3,000 meters by 2,500 meters with gold-bearing samples ranging from 0.005 grams per tonne ("g/t") to 0.683 g/t gold. The results indicate potential extensions to a swarm of quartz veins previously discovered by SLAM. The Company previously reported core intervals include 3,955 g/t gold over 0.1m from the No. 18 vein (December 03, 2020), as well as 162.5 g/t gold over 0.2 m (December 13, 2021) and 56.90 g/t gold over 0.5 m (November 22, 2022) from the Maisie vein.

The Company is a project generator and expects to receive significant cash and share payments in 2026. SLAM received 1,200,000 shares plus cash from Nine Mile Metals Inc. (NINE) in 2025 pursuant to the Wedge project agreement. Also in 2025, the Company received a cash payment of $60,000 as well as 180,000 shares of a private company pursuant to the Ramsay gold agreement. The Company holds NSR royalties and expects to receive additional cash and share payments on the Wedge copper zinc project and on the Ramsay gold project.

To view SLAM's corporate presentation, click SXL-Presentation. Additional information is available on SLAM's website and on SEDAR+ at www.sedarplus.ca. Follow us on X @SLAMGold.Join our company newsletter by clicking SXL-News to receive timely company updates and press releases relating to SLAM Exploration.

Qualifying Statements: Mike Taylor P.Geo, President and CEO of SLAM Exploration Ltd., is a qualified person as defined by National Instrument 43-101, and has approved the contents of this news release.

CONTACT INFORMATION:

Mike Taylor, President & CEO
Contact: 506-623-8960
[email protected]

Jimmy Gravel, Vice-President
Contact 902-273-2387
[email protected]

SEDAR+: 00012459

Forward-Looking Statements

This news release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable Canadian securities laws. Forward-looking statements are not historical facts but instead represent management's expectations, estimates and projections regarding future events or circumstances. Forward-looking statements are often, but not always, identified by words such as "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential," "may," "could," "would," "might," or "will," and similar expressions.

Forward-looking statements in this news release include, but are not limited to: statements regarding the exploration potential of the Harry Brook gold-antimony project; the significance of historical gold and antimony occurrences; the interpretation of geological, geochemical, and geophysical data; the identification and prioritization of exploration targets; the anticipated receipt and significance of pending assay results from the Jake Lee Project; the continuity and extent of mineralized structures at Jake Lee and Menneval; the timing and scope of future exploration programs; the Company's ability to advance its mineral projects; and the potential for future exploration success..

Forward-looking statements are based on reasonable assumptions made by the Company as of the date of this news release, including, without limitation: that historical exploration results, mineral occurrences, and publicly reported third-party mineral resources are relevant for regional and exploration context; that geological interpretations and targeting models are reasonable; that pending assay results will be received within anticipated timeframes; that planned exploration activities can be executed as expected; that contractors, equipment, personnel, and supplies will be available on acceptable terms; that commodity prices and market conditions will remain generally supportive; and that required permits, approvals, and access rights will be obtained in a timely manner.

Forward-looking statements involve known and unknown risks, uncertainties, and other factors that may cause actual results, performance, or achievements to differ materially from those expressed or implied by such statements. These risks and uncertainties include, without limitation: the speculative nature of mineral exploration; the risk that exploration results, including pending assay results, may not confirm historical data or current interpretations; uncertainty regarding the continuity, grade, and extent of mineralization; delays or changes to exploration programs; availability and cost of labour, equipment, and contractors; fluctuations in commodity prices; availability of financing on acceptable terms; regulatory, environmental, and permitting risks; operating hazards; and general economic, market, and business conditions. Additional risk factors are described in the Company's most recently filed Management's Discussion and Analysis and other continuous disclosure documents available under the Company's profile on SEDAR+.

Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not undertake to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: SLAM Exploration Ltd.



View the original press release on ACCESS Newswire

T.Dixon--TFWP