The Fort Worth Press - Expansion of Tunkillia Phase 2 Upgrade Drilling

USD -
AED 3.672497
AFN 65.000208
ALL 81.982977
AMD 361.969646
ANG 1.790365
AOA 918.000224
ARS 1519.249838
AUD 1.436214
AWG 1.8
AZN 1.702428
BAM 1.749507
BBD 2.015019
BDT 123.35519
BGN 1.683441
BHD 0.377671
BIF 3000.791659
BMD 1
BND 1.282667
BOB 11.949925
BRL 5.011697
BSD 1.000443
BTN 96.773876
BWP 13.820371
BYN 3.062335
BYR 19600
BZD 2.012049
CAD 1.422665
CDF 2315.000148
CHF 0.832475
CLF 0.024791
CLP 978.897474
CNY 6.70455
CNH 6.70451
COP 3232.05
CRC 455.852689
CUC 1
CUP 24.010877
CVE 98.634512
CZK 21.75415
DJF 178.154673
DKK 6.668635
DOP 60.532601
DZD 134.444021
EGP 52.398797
ERN 15
ETB 163.413408
EUR 0.89215
FJD 2.250298
FKP 0.756809
GBP 0.756055
GEL 2.594991
GGP 0.756809
GHS 11.810379
GIP 0.756809
GMD 73.999883
GNF 8801.205816
GTQ 7.648201
GYD 209.311167
HKD 7.848355
HNL 26.853682
HRK 6.720398
HTG 131.003976
HUF 326.359996
IDR 17942
ILS 3.0632
IMP 0.756809
INR 96.84755
IQD 1515.68552
IRR 1732150.000053
ISK 122.059987
JEP 0.756809
JMD 158.929793
JOD 0.708962
JPY 158.218498
KES 129.850282
KGS 87.449638
KHR 4071.865929
KMF 439.999709
KPW 900.000318
KRW 1341.879746
KWD 0.310898
KYD 0.833695
KZT 450.986443
LAK 22482.925804
LBP 89588.832782
LKR 331.11789
LRD 171.077407
LSL 16.697677
LTL 2.95274
LVL 0.60489
LYD 6.431616
MAD 9.969542
MDL 17.893131
MGA 4467.244826
MKD 55.084935
MMK 2099.765857
MNT 3595.748979
MOP 8.086572
MRU 39.937025
MUR 47.52016
MVR 15.410114
MWK 1734.762793
MXN 17.990496
MYR 4.090798
MZN 63.910024
NAD 16.697677
NGN 1330.039709
NIO 36.818706
NOK 9.56344
NPR 154.837844
NZD 1.78471
OMR 0.384501
PAB 1.000434
PEN 3.441332
PGK 4.534334
PHP 63.002503
PKR 277.046363
PLN 3.907995
PYG 5758.066392
QAR 3.646805
RON 4.770151
RSD 104.726048
RUB 85.275377
RWF 1477.66154
SAR 3.752339
SBD 8.000512
SCR 13.816609
SDG 601.502518
SEK 9.98656
SGD 1.281135
SHP 0.756573
SLE 24.670099
SLL 20969.491881
SOS 571.783828
SRD 37.650501
STD 20697.981008
STN 21.915995
SVC 8.753796
SYP 13002.000254
SZL 16.692832
THB 33.676973
TJS 9.219037
TMT 3.51
TND 2.99182
TOP 2.40776
TRY 49.214796
TTD 6.795747
TWD 31.950955
TZS 2640.078011
UAH 44.936959
UGX 4096.93088
UYU 40.119329
UZS 11820.21889
VES 873.63875
VND 25899.5
VUV 120.100619
WST 2.770789
XAF 585.21188
XAG 0.016977
XAU 0.000242702247
XCD 2.70255
XCG 1.803007
XDR 0.707052
XOF 585.21188
XPF 106.681218
YER 236.179026
ZAR 16.623007
ZMK 9001.196279
ZMW 19.919225
ZWL 321.999592
SSP 5751.632701
MXV 2.032919
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Expansion of Tunkillia Phase 2 Upgrade Drilling
Expansion of Tunkillia Phase 2 Upgrade Drilling

Expansion of Tunkillia Phase 2 Upgrade Drilling

Interim analysis indicates growth & grade upside potential

HIGHLIGHTS

  • 18,900m 'Phase 1' upgrade drilling completed November 2025, ~30,000m, 'Phase 2' program ongoing

  • Analysis of assays to-date indicates upside potential in high value 'Starter' pit areas, potential extensions of main open pit, and higher-grade extensions of 'Area 51' open pit mineralisation1

  • Reverse circulation (RC) component of 'Phase 2' drilling program now expanded to ~40,000m

Text size:

ADELAIDE, AU / ACCESS Newswire / June 15, 2026 / Barton Gold Holdings Limited (ASX:BGD)(OTCQB:BGDFF)(FRA:BGD3) (Barton or Company) is pleased to announce the expansion of 'Phase 2' upgrade drilling at its South Australian Tunkillia Gold Project (Tunkillia). Tunkillia's May 2025 Optimised Scoping Study (OSS) outlined a compelling development project, where:2

  • Annual production: ~120,000oz gold and ~250,000oz silver

  • Total LoM operating cash: ~A$2.7 billion (unlevered, pre-tax)

  • Net Present Value (NPV7.5%): ~A$1.4 billion (unlevered, pre-tax)

  • Internal Rate of Return (IRR): ~73.2% (unlevered, pre-tax); and

  • Payback period: ~0.8 years (unlevered, pre-tax)

Notably, within the project the S1 and S2 pits are modelled to produce 365,000oz gold, 923,000oz silver and $1.3bn operating free cash during the first ~27 months alone (assuming A$5,000/oz gold and A$50/oz silver).2 At current prices, these would be modelled to produce approximately $1.75bn in this time.2 Based upon these results, Barton expedited upgrade drilling programs to support JORC Resource upgrades and PFS analyses.

Interim analysis of 'Phase 1' and 'Phase 2' RC drilling assays published to-date has identified potential to extend total Tunkillia mineralisation, increase JORC Mineral Resources within the May 2025 OSS optimised pit outlines, and increase the grade profile and classification of 'Starter' pit mineralisation.1

Barton has therefore added ~10,500m to the ongoing 'Phase 2' RC drilling program. All other work programs remain on track for target completion of a Pre-feasibility Study (PFS) before the end of calendar year 2026. PFS results will then inform a Mining Lease application and project finance discussions during calendar year 2027.

Commenting on the expansion of Tunkillia drilling, Barton Managing Director Alexander Scanlon said:

"Tunkillia's OSS demonstrated its financial and capital leverage, with robust economics driven by higher-grade 'Starter Pits' modelled to generate A$1.75bn operating profit during the first 2.5 years at current gold and silver prices.

"With recent 'Phase 1' upgrade drilling confirming the mineralisation behind these economics, and ongoing 'Phase 2' drilling identifying new extensions and higher grade mineralisation, we are excited to expand drilling with the objective to potentially increase both the quantum and grade of Resources within Tunkillia's optimised open pit outlines.

"This could materially enhance Tunkillia's already robust economics by adding new gold and silver ounces within the existing pit outlines, further reducing early cash costs per ounce, and boosting its significant early cash flow profile."

1 Refer to ASX announcements dated 25 November, 2 / 16 December 2025, and 21 January and 27 May 2026
2 Refer to ASX announcement dated 5 May 2025

Authorised by the Board of Directors of Barton Gold Holdings Limited.

For further information, please contact:

Alexander Scanlon
Managing Director
[email protected]
+61 425 226 649

Jade Cook
Company Secretary
[email protected]
+61 8 9322 1587

About Barton Gold

Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000ozpa with 2.2Moz Au & 3.1Moz Ag JORC Mineral Resources (79.9Mt @ 0.87g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia.*

Challenger Gold Project
  • 313koz Au + fully permitted Central Gawler Mill (CGM)

Tarcoola Gold Project
  • 20koz Au in fully permitted open pit mine near CGM

  • Tolmer discovery grades up to 84g/t Au & 17,600g/t Ag

Tunkillia Gold Project
  • 1.6Moz Au & 3.1Moz Ag JORC Mineral Resources

  • Competitive 120kozpa gold & 250kozpa silver project

Wudinna Gold Project
  • 279koz Au project located southeast of Tunkillia

  • Significant optionality, adjacent to main highway

Competent Persons Statement & Previously Reported Information

The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 (JORC).

Activity

Competent Person

Membership

Status

Tarcoola Mineral Resource (Stockpiles)

Dr Andrew Fowler (Consultant)

AusIMM

Member

Tarcoola Mineral Resource (Perseverance Mine)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Tarcoola Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tarcoola Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tunkillia Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Mineral Resource

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (above 215mRL)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (below 90mRL)

Mr Dale Sims

AusIMM / AIG

Fellow / Member

Wudinna Mineral Resource (Clarke Deposit)

Ms Justine Tracey

AusIMM

Member

Wudinna Mineral Resource (all other Deposits)

Mrs Christine Standing

AusIMM / AIG

Member / Member

The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted in this announcement, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.

Cautionary Statement Regarding Forward-Looking Information

This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.

* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 8 September 2025. Total Barton JORC (2012) Mineral Resources include 1,049koz Au (39.7Mt @ 0.82 g/t Au) in Indicated category and 1,186koz Au (40.2Mt @ 0.92 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.

SOURCE: Barton Gold Holdings Limited



View the original press release on ACCESS Newswire

T.Harrison--TFWP