The Fort Worth Press - Expansion of Tunkillia Phase 2 Upgrade Drilling

USD -
AED 3.672501
AFN 62.999468
ALL 81.919833
AMD 369.022152
ANG 1.790403
AOA 917.49877
ARS 1429.524102
AUD 1.414877
AWG 1.8025
AZN 1.69766
BAM 1.687089
BBD 2.017174
BDT 122.938906
BGN 1.69088
BHD 0.377743
BIF 2994.099786
BMD 1
BND 1.284073
BOB 6.920735
BRL 5.064203
BSD 1.001557
BTN 94.807122
BWP 13.437361
BYN 2.772827
BYR 19600
BZD 2.014241
CAD 1.40028
CDF 2320.999777
CHF 0.794545
CLF 0.022625
CLP 890.450318
CNY 6.76055
CNH 6.75673
COP 3491.5
CRC 455.637457
CUC 1
CUP 26.5
CVE 95.407696
CZK 20.812402
DJF 178.341147
DKK 6.439255
DOP 58.450046
DZD 133.039644
EGP 50.252504
ERN 15
ETB 159.498325
EUR 0.86147
FJD 2.21395
FKP 0.744874
GBP 0.744905
GEL 2.645024
GGP 0.744874
GHS 11.224995
GIP 0.744874
GMD 72.50318
GNF 8774.999771
GTQ 7.634911
GYD 209.537036
HKD 7.833345
HNL 26.719838
HRK 6.492901
HTG 130.901343
HUF 301.062502
IDR 17705
ILS 2.903845
IMP 0.744874
INR 94.547702
IQD 1310
IRR 1375752.506089
ISK 124.402706
JEP 0.744874
JMD 158.757133
JOD 0.709047
JPY 160.324499
KES 129.449868
KGS 87.449772
KHR 4009.999835
KMF 425.000554
KPW 900.00035
KRW 1507.140467
KWD 0.30833
KYD 0.834674
KZT 490.263143
LAK 22025.000303
LBP 89549.9998
LKR 333.00411
LRD 182.174977
LSL 16.220024
LTL 2.95274
LVL 0.60489
LYD 6.379985
MAD 9.27225
MDL 17.421534
MGA 4204.999818
MKD 53.17754
MMK 2099.401411
MNT 3576.563972
MOP 8.081808
MRU 40.059788
MUR 47.240013
MVR 15.449755
MWK 1736.999876
MXN 17.191501
MYR 4.062496
MZN 63.909761
NAD 16.219915
NGN 1358.069585
NIO 36.629763
NOK 9.53254
NPR 151.694838
NZD 1.71661
OMR 0.384503
PAB 1.001488
PEN 3.406496
PGK 4.358993
PHP 60.166016
PKR 278.324979
PLN 3.657915
PYG 6132.175158
QAR 3.643497
RON 4.506202
RSD 101.117994
RUB 72.199998
RWF 1514.5
SAR 3.752194
SBD 8.065041
SCR 13.834229
SDG 600.504736
SEK 9.39074
SGD 1.281705
SHP 0.746601
SLE 24.749594
SLL 20969.503664
SOS 571.499154
SRD 37.518007
STD 20697.981008
STN 21.375
SVC 8.763273
SYP 110.532098
SZL 16.219973
THB 32.519802
TJS 9.284125
TMT 3.5
TND 2.911974
TOP 2.40776
TRY 46.299904
TTD 6.798097
TWD 31.502198
TZS 2627.498036
UAH 44.900392
UGX 3720.444763
UYU 40.61969
UZS 12000.000124
VES 591.77565
VND 26307.5
VUV 118.866954
WST 2.741216
XAF 565.843581
XAG 0.014158
XAU 0.00023
XCD 2.70255
XCG 1.805015
XDR 0.703697
XOF 564.499729
XPF 102.450387
YER 238.588769
ZAR 16.161105
ZMK 9001.19452
ZMW 17.605527
ZWL 321.999592
  • CMSC

    0.0100

    22.34

    +0.04%

  • RBGPF

    2.1500

    62.87

    +3.42%

  • BCC

    0.4500

    71.59

    +0.63%

  • NGG

    -0.2700

    81.57

    -0.33%

  • RIO

    0.5400

    105.89

    +0.51%

  • CMSD

    0.0600

    22.32

    +0.27%

  • RELX

    -0.9000

    32.84

    -2.74%

  • RYCEF

    1.0700

    18.11

    +5.91%

  • JRI

    0.1135

    12.78

    +0.89%

  • BCE

    -0.2369

    24.04

    -0.99%

  • AZN

    -1.4800

    177.27

    -0.83%

  • GSK

    -0.8100

    52.23

    -1.55%

  • BTI

    -1.2600

    61.06

    -2.06%

  • VOD

    -0.5300

    15

    -3.53%

  • BP

    -1.1900

    41.59

    -2.86%

Expansion of Tunkillia Phase 2 Upgrade Drilling
Expansion of Tunkillia Phase 2 Upgrade Drilling

Expansion of Tunkillia Phase 2 Upgrade Drilling

Interim analysis indicates growth & grade upside potential

HIGHLIGHTS

  • 18,900m 'Phase 1' upgrade drilling completed November 2025, ~30,000m, 'Phase 2' program ongoing

  • Analysis of assays to-date indicates upside potential in high value 'Starter' pit areas, potential extensions of main open pit, and higher-grade extensions of 'Area 51' open pit mineralisation1

  • Reverse circulation (RC) component of 'Phase 2' drilling program now expanded to ~40,000m

Text size:

ADELAIDE, AU / ACCESS Newswire / June 15, 2026 / Barton Gold Holdings Limited (ASX:BGD)(OTCQB:BGDFF)(FRA:BGD3) (Barton or Company) is pleased to announce the expansion of 'Phase 2' upgrade drilling at its South Australian Tunkillia Gold Project (Tunkillia). Tunkillia's May 2025 Optimised Scoping Study (OSS) outlined a compelling development project, where:2

  • Annual production: ~120,000oz gold and ~250,000oz silver

  • Total LoM operating cash: ~A$2.7 billion (unlevered, pre-tax)

  • Net Present Value (NPV7.5%): ~A$1.4 billion (unlevered, pre-tax)

  • Internal Rate of Return (IRR): ~73.2% (unlevered, pre-tax); and

  • Payback period: ~0.8 years (unlevered, pre-tax)

Notably, within the project the S1 and S2 pits are modelled to produce 365,000oz gold, 923,000oz silver and $1.3bn operating free cash during the first ~27 months alone (assuming A$5,000/oz gold and A$50/oz silver).2 At current prices, these would be modelled to produce approximately $1.75bn in this time.2 Based upon these results, Barton expedited upgrade drilling programs to support JORC Resource upgrades and PFS analyses.

Interim analysis of 'Phase 1' and 'Phase 2' RC drilling assays published to-date has identified potential to extend total Tunkillia mineralisation, increase JORC Mineral Resources within the May 2025 OSS optimised pit outlines, and increase the grade profile and classification of 'Starter' pit mineralisation.1

Barton has therefore added ~10,500m to the ongoing 'Phase 2' RC drilling program. All other work programs remain on track for target completion of a Pre-feasibility Study (PFS) before the end of calendar year 2026. PFS results will then inform a Mining Lease application and project finance discussions during calendar year 2027.

Commenting on the expansion of Tunkillia drilling, Barton Managing Director Alexander Scanlon said:

"Tunkillia's OSS demonstrated its financial and capital leverage, with robust economics driven by higher-grade 'Starter Pits' modelled to generate A$1.75bn operating profit during the first 2.5 years at current gold and silver prices.

"With recent 'Phase 1' upgrade drilling confirming the mineralisation behind these economics, and ongoing 'Phase 2' drilling identifying new extensions and higher grade mineralisation, we are excited to expand drilling with the objective to potentially increase both the quantum and grade of Resources within Tunkillia's optimised open pit outlines.

"This could materially enhance Tunkillia's already robust economics by adding new gold and silver ounces within the existing pit outlines, further reducing early cash costs per ounce, and boosting its significant early cash flow profile."

1 Refer to ASX announcements dated 25 November, 2 / 16 December 2025, and 21 January and 27 May 2026
2 Refer to ASX announcement dated 5 May 2025

Authorised by the Board of Directors of Barton Gold Holdings Limited.

For further information, please contact:

Alexander Scanlon
Managing Director
[email protected]
+61 425 226 649

Jade Cook
Company Secretary
[email protected]
+61 8 9322 1587

About Barton Gold

Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000ozpa with 2.2Moz Au & 3.1Moz Ag JORC Mineral Resources (79.9Mt @ 0.87g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia.*

Challenger Gold Project
  • 313koz Au + fully permitted Central Gawler Mill (CGM)

Tarcoola Gold Project
  • 20koz Au in fully permitted open pit mine near CGM

  • Tolmer discovery grades up to 84g/t Au & 17,600g/t Ag

Tunkillia Gold Project
  • 1.6Moz Au & 3.1Moz Ag JORC Mineral Resources

  • Competitive 120kozpa gold & 250kozpa silver project

Wudinna Gold Project
  • 279koz Au project located southeast of Tunkillia

  • Significant optionality, adjacent to main highway

Competent Persons Statement & Previously Reported Information

The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 (JORC).

Activity

Competent Person

Membership

Status

Tarcoola Mineral Resource (Stockpiles)

Dr Andrew Fowler (Consultant)

AusIMM

Member

Tarcoola Mineral Resource (Perseverance Mine)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Tarcoola Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tarcoola Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tunkillia Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Mineral Resource

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (above 215mRL)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (below 90mRL)

Mr Dale Sims

AusIMM / AIG

Fellow / Member

Wudinna Mineral Resource (Clarke Deposit)

Ms Justine Tracey

AusIMM

Member

Wudinna Mineral Resource (all other Deposits)

Mrs Christine Standing

AusIMM / AIG

Member / Member

The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted in this announcement, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.

Cautionary Statement Regarding Forward-Looking Information

This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.

* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 8 September 2025. Total Barton JORC (2012) Mineral Resources include 1,049koz Au (39.7Mt @ 0.82 g/t Au) in Indicated category and 1,186koz Au (40.2Mt @ 0.92 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.

SOURCE: Barton Gold Holdings Limited



View the original press release on ACCESS Newswire

T.Harrison--TFWP