The Fort Worth Press - Challenger DFS Pit Optimisation Drilling Complete

USD -
AED 3.6725
AFN 66.000327
ALL 79.999849
AMD 364.516059
ANG 1.789783
AOA 916.999802
ARS 1495.0157
AUD 1.411797
AWG 1.8
AZN 1.694317
BAM 1.689786
BBD 2.014385
BDT 122.020865
BGN 1.696366
BHD 0.37713
BIF 2988.962568
BMD 1
BND 1.278096
BOB 11.57656
BRL 5.218218
BSD 1.000151
BTN 95.649394
BWP 13.500659
BYN 3.042098
BYR 19600
BZD 2.011534
CAD 1.38962
CDF 2269.99956
CHF 0.811965
CLF 0.023463
CLP 923.439702
CNY 6.743302
CNH 6.746725
COP 3107.77
CRC 449.273171
CUC 1
CUP 26.5
CVE 95.267512
CZK 20.903992
DJF 178.102253
DKK 6.45632
DOP 58.751107
DZD 132.907406
EGP 50.529303
ERN 15
ETB 160.484608
EUR 0.86362
FJD 2.209054
FKP 0.73738
GBP 0.738645
GEL 2.604991
GGP 0.73738
GHS 11.05212
GIP 0.73738
GMD 74.000076
GNF 8785.882455
GTQ 7.629004
GYD 209.248979
HKD 7.844005
HNL 26.816424
HRK 6.508697
HTG 130.824891
HUF 315.826502
IDR 17832.2
ILS 2.994497
IMP 0.73738
INR 95.81665
IQD 1310.5
IRR 1374575.000007
ISK 122.809961
JEP 0.73738
JMD 158.031838
JOD 0.708982
JPY 159.487503
KES 129.502218
KGS 87.450097
KHR 4046.0505
KMF 426.000327
KPW 900.000294
KRW 1412.605011
KWD 0.30876
KYD 0.833488
KZT 461.939219
LAK 22540.553384
LBP 89564.507419
LKR 331.978314
LRD 181.532281
LSL 16.225328
LTL 2.952741
LVL 0.60489
LYD 6.372767
MAD 9.304503
MDL 17.252954
MGA 4307.838521
MKD 53.147379
MMK 2099.801401
MNT 3596.870401
MOP 8.080178
MRU 40.112318
MUR 46.999557
MVR 15.460398
MWK 1736.999773
MXN 17.062615
MYR 4.059598
MZN 63.905027
NAD 16.279655
NGN 1350.049779
NIO 36.805841
NOK 9.408255
NPR 153.038858
NZD 1.702515
OMR 0.384492
PAB 1.000151
PEN 3.367495
PGK 4.39475
PHP 61.821023
PKR 277.569951
PLN 3.736625
PYG 6034.084282
QAR 3.6455
RON 4.528797
RSD 101.375998
RUB 84.901872
RWF 1473.7024
SAR 3.746587
SBD 8.025811
SCR 13.840472
SDG 601.499565
SEK 9.532415
SGD 1.278235
SHP 0.740866
SLE 24.65021
SLL 20969.499227
SOS 571.500301
SRD 37.967005
STD 20697.981008
STN 21.167678
SVC 8.751323
SYP 13001.999906
SZL 16.279829
THB 33.112979
TJS 9.241463
TMT 3.5
TND 2.91875
TOP 2.40776
TRY 47.934603
TTD 6.782297
TWD 31.896198
TZS 2650.226013
UAH 44.802989
UGX 3730.695293
UYU 40.348187
UZS 11821.932307
VES 771.57685
VND 26177
VUV 118.338592
WST 2.726312
XAF 566.738234
XAG 0.015884
XAU 0.00023
XCD 2.70255
XCG 1.802536
XDR 0.707052
XOF 566.738234
XPF 103.039074
YER 237.09797
ZAR 16.255875
ZMK 9001.187991
ZMW 18.677668
ZWL 321.999592
  • RBGPF

    0.3500

    69

    +0.51%

  • CMSC

    -0.1200

    21.24

    -0.56%

  • BTI

    0.6500

    56.38

    +1.15%

  • GSK

    0.8700

    51.15

    +1.7%

  • RIO

    -0.5200

    96.69

    -0.54%

  • BP

    0.5600

    43.41

    +1.29%

  • BCE

    0.0100

    23.36

    +0.04%

  • AZN

    3.2100

    160.1

    +2%

  • CMSD

    -0.0900

    21.09

    -0.43%

  • NGG

    0.8600

    82.15

    +1.05%

  • RELX

    0.9500

    34.51

    +2.75%

  • BCC

    -1.7600

    80.18

    -2.2%

  • RYCEF

    -0.2500

    20.81

    -1.2%

  • JRI

    -0.0400

    12.44

    -0.32%

  • VOD

    -0.0700

    16.13

    -0.43%

Challenger DFS Pit Optimisation Drilling Complete
Challenger DFS Pit Optimisation Drilling Complete

Challenger DFS Pit Optimisation Drilling Complete

Targeting Initial ‘Stage 1' DFS & Ore Reserves conversion by H2 CY 2026

HIGHLIGHTS

  • DFS underway following dual Challenger JORC (2012) Mineral Resources upgrades to 313koz Au, targeting JORC (2012) Ore Reserves conversion and a ‘Stage 1’ DFS by H2 CY 20261

  • DFS objective to model a viable, simplified ‘baseline’ Stage 1 operation to underwrite restart of CGM and maximise Challenger, Tarcoola, Wudinna & Tolmer development optionality

  • Following the recent completion of 8,065m reverse circulation (RC) Resource upgrade drilling, a total of 1,322m diamond drilling (DD) completed for open pit design and metallurgical optimisation2

  • First assays from recently completed Resource upgrade RC drilling expected imminently2

1 Refer to ASX announcements dated 30 June and 8 / 28 September 2025

2 Refer to ASX announcements dated 2 February, 26 March 2026

Text size:

ADELAIDE, AU / ACCESS Newswire / April 15, 2026 / Barton Gold Holdings Limited (ASX:BGD)(OTCQB:BGDFF)(FRA:BGD3) (Barton or Company) is pleased to confirm the completion of pit optimisation drilling at its South Australian Challenger Gold Project ( Challenger ), adjacent to its wholly-owned Central Gawler Mill (CGM). Foraco Drilling was engaged to complete the program.

A total 1,322m diamond drilling ( DD ) was completed across 23 holes to generate additional geotechnical data and sample materials for metallurgical testwork. These analyses will support the optimisation of Challenger open pit designs and operations. Together with 8,065m of recently completed RC drilling, Barton is targeting conversion of existing open pit mineralisation (and new near-surface targets), to JORC (2012) 'Indicated' Resources and, subject to the completion of a Definitive Feasibility Study (DFS), to 'Ore Reserves'.

The design concept of the DFS is to target an initial 3 - 4 year Stage 1 'baseline' operation utilising only historical higher-grade tailings from tailings storage facility 1 ( TSF1 ) and limited, near-surface materials without disturbing Challenger's historical high-grade underground mine, its mineralisation or its infrastructure access.

This model also has the benefit of deferring the technical risk and cost of underground operations to a future date, following the de-risking of 'Stage 1' operations, and providing further time to optimise development plans.

Reinstatement of the CGM also materially enhances the development optionality of Barton's several 'regional enhancement' assets such as the Tarcoola Gold Project (Tarcoola) , the Wudinna Gold Project (Wudinna) and high-grade Tolmer silver prospect (Tolmer) all of which could potentially be processed through the CGM. 1

Commenting on Challenger's development drilling programs, Barton MD Alexander Scanlon said :

"We are pleased to have completed this program in support of Challenger's ongoing DFS, and we thank Foraco Drilling for their safe execution despite the challenges of recent extreme rains across outback South Australia.

"Challenger's significant open pit and near-surface gold mineralisation, immediately adjacent to our existing Central Gawler Mill, provides an ideal foundation for an initial 'baseline' operation that underwrites a lower-risk restart while maximising development optionality across the Challenger underground mine, Tarcoola, Tolmer and Wudinna.

"Foraco will now move on to development drilling programs at our neighbouring large-scale Tunkillia Gold Project."

Authorised by the Board of Directors of Barton Gold Holdings Limited.

For further information, please contact:

Alexander Scanlon
Managing Director
[email protected]
+61 425 226 649

Jade Cook
Company Secretary
[email protected]
+61 8 9322 1587

About Barton Gold

Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000ozpa with 2.2Moz Au & 3.1Moz Ag JORC Mineral Resources (79.9Mt @ 0.87g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia.*

Challenger Gold Project

  • 313koz Au + fully permitted Central Gawler Mill ( CGM )

Tarcoola Gold Project

  • 20koz Au in fully permitted open pit mine near CGM

  • Tolmer discovery grades up to 84g/t Au & 17,600g/t Ag

Tunkillia Gold Project

  • 1.6Moz Au & 3.1Moz Ag JORC Mineral Resources

  • Competitive 120kozpa gold & 250kozpa silver project

Wudinna Gold Project

  • 279koz Au project located southeast of Tunkillia

  • Significant optionality, adjacent to main highway

https://app.accessnewswire.com/imagelibrary/d500c232-cf66-4f6f-913b-7711ae4a9e09/1099330/image.png

Competent Persons Statement & Previously Reported Information

The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 (JORC).

Activity

Competent Person

Membership

Status

Tarcoola Mineral Resource (Stockpiles)

Dr Andrew Fowler (Consultant)

AusIMM

Member

Tarcoola Mineral Resource (Perseverance Mine)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Tarcoola Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tarcoola Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tunkillia Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Mineral Resource

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (above 215mRL)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (below 90mRL)

Mr Dale Sims

AusIMM / AIG

Fellow / Member

Wudinna Mineral Resource (Clarke Deposit)

Ms Justine Tracey

AusIMM

Member

Wudinna Mineral Resource (all other Deposits)

Mrs Christine Standing

AusIMM / AIG

Member / Member

The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au . The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. In accordance with ASX Listing Rule 5.19.2, the Company further confirms that the material assumptions underpinning any production targets and the forecast financial information derived therefrom continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.

Cautionary Statement Regarding Forward-Looking Information

This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.

1 Refer to Prospectus and ASX announcements dated 27 March, 15 April, 30 June, 2 / 8 / 25 July, 5 / 6 August and 10 / 23 September 2025

*Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 8 September 2025. Total Barton JORC (2012) Mineral Resources include 1,049koz Au (39.7Mt @ 0.82 g/t Au) in Indicated category and 1,186koz Au (40.2Mt @ 0.92 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.

SOURCE: Barton Gold Holdings Limited



View the original press release on ACCESS Newswire

J.Barnes--TFWP