The Fort Worth Press - Prince Silver Delivers Further Strong Drill Results, Highlighted by 7.62 Metres of 230 G/T Silver, 10.78% Manganese, 1.87% Lead, 2.54% Zinc and 0.58 G/T Gold

USD -
AED 3.67325
AFN 62.999686
ALL 83.000389
AMD 377.496907
ANG 1.790083
AOA 916.999878
ARS 1395.150898
AUD 1.417224
AWG 1.8025
AZN 1.696655
BAM 1.704371
BBD 2.014946
BDT 122.754882
BGN 1.709309
BHD 0.377549
BIF 2970
BMD 1
BND 1.283525
BOB 6.913501
BRL 5.246501
BSD 1.000436
BTN 93.206388
BWP 13.651833
BYN 3.093542
BYR 19600
BZD 2.012088
CAD 1.373695
CDF 2275.000546
CHF 0.790905
CLF 0.02312
CLP 912.898421
CNY 6.900451
CNH 6.88869
COP 3693.2
CRC 468.079358
CUC 1
CUP 26.5
CVE 97.04998
CZK 21.185038
DJF 177.720217
DKK 6.46496
DOP 58.824986
DZD 132.032159
EGP 52.237101
ERN 15
ETB 157.198647
EUR 0.86535
FJD 2.239785
FKP 0.750673
GBP 0.746275
GEL 2.715
GGP 0.750673
GHS 10.897874
GIP 0.750673
GMD 74.000062
GNF 8777.473613
GTQ 7.652926
GYD 209.305771
HKD 7.833035
HNL 26.570209
HRK 6.5191
HTG 131.227832
HUF 339.922033
IDR 16931
ILS 3.12734
IMP 0.750673
INR 92.966396
IQD 1310
IRR 1315124.999664
ISK 124.440077
JEP 0.750673
JMD 157.168937
JOD 0.709004
JPY 157.8535
KES 129.601538
KGS 87.447902
KHR 4010.000096
KMF 427.999847
KPW 899.987979
KRW 1491.679776
KWD 0.30627
KYD 0.833751
KZT 481.121429
LAK 21474.999866
LBP 89549.999743
LKR 311.846652
LRD 183.400113
LSL 16.830382
LTL 2.95274
LVL 0.60489
LYD 6.380161
MAD 9.35875
MDL 17.532561
MGA 4164.999848
MKD 53.321164
MMK 2099.739449
MNT 3585.842291
MOP 8.07209
MRU 40.109838
MUR 46.504986
MVR 15.450341
MWK 1737.000045
MXN 17.787655
MYR 3.939027
MZN 63.920974
NAD 16.830329
NGN 1356.999631
NIO 36.719764
NOK 9.518897
NPR 149.125498
NZD 1.70971
OMR 0.384505
PAB 1.000471
PEN 3.454497
PGK 4.302026
PHP 59.955026
PKR 279.149985
PLN 3.69984
PYG 6500.777741
QAR 3.644602
RON 4.408498
RSD 101.660985
RUB 86.148542
RWF 1459
SAR 3.754506
SBD 8.048583
SCR 14.850342
SDG 601.000128
SEK 9.32417
SGD 1.279125
SHP 0.750259
SLE 24.650258
SLL 20969.510825
SOS 571.500628
SRD 37.502039
STD 20697.981008
STN 21.5
SVC 8.753927
SYP 110.528765
SZL 16.829994
THB 32.635505
TJS 9.579415
TMT 3.5
TND 2.91125
TOP 2.40776
TRY 44.293575
TTD 6.781035
TWD 31.853999
TZS 2597.497688
UAH 43.994632
UGX 3781.362476
UYU 40.523406
UZS 12194.99951
VES 454.68563
VND 26290
VUV 119.408419
WST 2.73222
XAF 571.660014
XAG 0.014021
XAU 0.000217
XCD 2.70255
XCG 1.803034
XDR 0.710959
XOF 571.50087
XPF 103.600118
YER 238.549751
ZAR 16.854978
ZMK 9001.202744
ZMW 19.584125
ZWL 321.999592
  • AZN

    -0.8800

    187.54

    -0.47%

  • RBGPF

    -13.5000

    69

    -19.57%

  • RIO

    -2.8350

    84.885

    -3.34%

  • GSK

    0.0000

    52.06

    0%

  • BTI

    0.3100

    58.4

    +0.53%

  • BCC

    -2.9950

    68.845

    -4.35%

  • RYCEF

    -0.7500

    15.85

    -4.73%

  • CMSC

    -0.0650

    22.765

    -0.29%

  • NGG

    -2.1200

    85.28

    -2.49%

  • BCE

    -0.2100

    25.54

    -0.82%

  • CMSD

    -0.0200

    22.87

    -0.09%

  • VOD

    -0.0400

    14.33

    -0.28%

  • BP

    1.5550

    46.165

    +3.37%

  • JRI

    -0.1530

    12.17

    -1.26%

  • RELX

    -0.2800

    33.58

    -0.83%

Prince Silver Delivers Further Strong Drill Results, Highlighted by 7.62 Metres of 230 G/T Silver, 10.78% Manganese, 1.87% Lead, 2.54% Zinc and 0.58 G/T Gold
Prince Silver Delivers Further Strong Drill Results, Highlighted by 7.62 Metres of 230 G/T Silver, 10.78% Manganese, 1.87% Lead, 2.54% Zinc and 0.58 G/T Gold

Prince Silver Delivers Further Strong Drill Results, Highlighted by 7.62 Metres of 230 G/T Silver, 10.78% Manganese, 1.87% Lead, 2.54% Zinc and 0.58 G/T Gold

VANCOUVER, BC / ACCESS Newswire / March 19, 2026 / Prince Silver Corp. (CSE:PRNC)(OTCQB:PRNCF)(T130:Frankfurt) ("Prince Silver" or the "Company"), is pleased to announce a new set of robust assay results from its ongoing reverse circulation ("RC") drill program at the Prince Silver Project (the "Project") in the prolific Pioche Mining District, Lincoln County, Nevada. (See Figure 2 below for the Project location)

Text size:

The latest results from drill holes PRC-31 through PRC-40 continue to demonstrate the Project's compelling scale and consistency, intersecting broad zones of polymetallic mineralization across multiple stacked stratigraphic horizons. These results further reinforce the Company's interpretation of the Prince Silver Project as a large, laterally extensive, stratigraphically controlled mineralized system with significant upside potential.

New RC Drill Hole Highlights:

PRC-37:

From 170.69-178.31 Metres

  • 7.62 metres grading 230.20 g/t Silver (Ag), 10.78% Manganese (Mn), 1.87% Lead (Pb), 2.54% Zinc (Zn) and 0.58 g/t Gold (Au); and

From 245.36-271.27 metres

  • 25.91 metres grading 0.95 g/t Au, 28.85 g/t Ag, and 1.02% Zn

Including from 251.46-260.60 metres:

  • 9.14 metres grading 1.73 g/t Au, 58.08 g/t Ag, and 1.96% Zn

PRC-31:

From 193.55-204.22 metres

  • 10.67 metres grading 118.57 g/t Ag, 9.98% Mn, 1.17% Pb, 1.64% Zn and 0.317 g/t Au

PRC-32:

From 144.78-149.35 metres

  • 4.57 metres grading 223.67 g/t Ag, 3.29% Mn, 1.62% Pb, 2.43% Zn and 1.91 g/t Au; and

From 176.78-198.12 metres

  • 21.34 metres grading 32.09 g/t Ag, 5.12% Mn, 0.99% Pb, and 2.22% Zn

PRC-35:

From 233.17-242.32 metres

  • 9.14 metres grading 55.5 g/t Ag, 3.95% Mn, 1.52% Pb, and 1.33% Zn

These latest results build on the Company's previously reported January 13, 2026 drilling highlights, including 3.05 metres grading 1,331.00 g/t Ag, 14.17% Mn, 2.19% Pb, and 4.45% Zn in hole PRC-28, and 3.05 metres grading 355.25 g/t Ag, 4.78 g/t Au, 2.69% Pb, and 4.72% Zn in hole PRC-27.

Derek Iwanaka, Prince Silver CEO commented:

"These latest results continue to highlight the exceptional scale, strength, and consistency of the Prince Silver Project's expanding mineralized system. Standout intercepts from holes PRC-37, PRC-31, and PRC-32 rank among the most compelling encountered to date, delivering impressive combinations of high-grade silver, gold, and strong polymetallic credits over meaningful widths across multiple stacked horizons.

Importantly, drilling such as PRC-39 and PRC-40 is further refining the outer limits of the system, significantly enhancing our geological model and targeting precision as we step out with confidence. With two rigs actively drilling and the program now expanded to approximately 9,000 metres, we believe the Prince Silver Project Is continuing to demonstrate the characteristics of a large-scale polymetallic discovery."

Strongest Holes Continue to Support Scale and Continuity (See Figure 1 for drill hole locations)

The strongest holes in this batch were holes PRC-37, PRC-31 and PRC-32, each of which intersected meaningful mineralization across important target horizons.

PRC-37 is particularly significant, returning both a high-grade silver-manganese-lead-zinc interval in the Combined Metals Bed and a broad deeper gold-silver-zinc interval. The upper interval from 560 to 585 ft ranks among the strongest silver-rich intercepts drilled to date, while the deeper 85 ft (25.9 m) interval from 805 to 890 ft (245m to 271m) highlights the potential for a substantial mineralized package with meaningful gold content.

PRC-31 returned a strong 35 ft interval grading 118.57 g/t Ag and 9.98% Mn, with associated lead and zinc, further supporting continuity within one of the Company's priority stratigraphic targets.

PRC-32 returned two notable intervals, including a high-grade upper intercept from 475 to 490 ft with strong gold and silver values, and a broader 70 ft interval from 580 to 650 ft characterized by consistent manganese, lead and zinc mineralization. Together, these results continue to demonstrate the presence of stacked mineralized zones across multiple stratigraphic levels.

PRC-35 also returned several mineralized intercepts across the A-Shale, Susan Duster, and Combined Metals Bed, further reinforcing the interpretation of a laterally extensive, multi-horizon system.

Step-Out Holes Help Refine the Mineralized Footprint

Two step-out holes were drilled to provide valuable information to help define the system's scale, geometry, and controls.

PRC-38 was terminated early due to faulting. While the target interval was not reached, the structural disruption offers useful insight into offsets of mineralized horizons.

PRC-39 was drilled along the eastern extent of the Exploration Target area* and did not return significant intercepts, but it is important in defining the outer boundary of mineralization and improving targeting precision.

Similarly, PRC-40 was also drilled to test the easternmost limits of the Exploration Target* area and appears to have largely missed the main mineralized area, although it did intersect one narrow interval of elevated silver and gold values.

Other holes returned narrower or moderate intervals, consistent with the Company's geological model, which anticipates variability due to faulting, stratigraphy, and bed geometry.

Figure 1. Drill Hole Location Map

Ongoing Exploration

Drilling is ongoing with two rigs currently operating at the Prince Silver Project. The Company has now completed most of its first phase of drilling under the expanded RC program and is currently drilling holes PRC-47 and PRC-48.

The Company expanded its original RC drill program to approximately 9,000 metres (31,000 feet) to support step-out and infill drilling, validate historical results, and advance the Project toward a maiden NI 43-101-compliant mineral resource estimate.

Based on progress to date, the Company expects to continue drilling immediately following completion of the first phase and, as a result, no stoppage in drilling is currently expected in the coming months.

Historic and current drilling at Prince has encountered multiple gently dipping mineralized beds within both a carbonate replacement deposit ("CRD") environment and a distal disseminated sediment-hosted gold-silver system.

Figure 2. Prince Silver Project Location Map

*Exploration Target

Historical drilling at the Prince Project identified an exploration target (the "Exploration Target") as outlined in an independent historic report prepared following JORC guidelines (JORC standards for the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves) by OmniGeoX Exploration Consultants of Perth, Australia, based on historical surfaceand underground drilling. The report is titled "Prince Project Exploration Target", dated April 24, 2024, authored by Dr. Lachlan Rutherford and Michael Martin (OmniGeoX Exploration Consultants, 2024, Prince Project Exploration Target, Independent Report prepared for Prince Silver Corp.).

The Exploration Target was basedon 129 historic drill holes drilled throughmineralized carbonate replacement beds and host Pioche Shale up to 300 metres in depth. Mineralized polymetallic intersections based on historical block modelling suggest the immediate Exploration Target is between 25-43Mt with grades ranging from 1.44-1.57% Zn, 0.78-0.87% Pb, 0.28-0.40g/t Au, 37-40g/t Ag and 3.62-4.30% Mn.

More comprehensive details on the Exploration Target and historic production are also available in the Company's press release dated February 27, 2025, available on the Company'swebsite and at SEDAR+.

* Readers are cautioned that the Exploration Target is not an "inferred", "indicated" or "measured" mineral resource compliant with National Instrument 43-101 ("NI 43-101"). The Exploration Target has been determined based upon 129 historic drill holes totaling 16,606 metres, historic production records including mine level plans and 3D modelling of mineralization and geology.The potential quantityand grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to define a mineral resource and, it is uncertain if further exploration will result in the Exploration Target being delineated as a mineral resource.

Table 1: Significant Assays Results for Drill Holes PRC 31 - 40

Hole # and Depth (in feet)

Interval (Feet)

Interval (Metres)

Au (g/t)

Ag (g/t)

Mn %

Pb%

Zn %

Zone of Mineralization

PRC-31

PRC-31 630-635

5

1.524

0.01

80.23

12.83

0.11

0.52

Pioche Shale C Member

PRC-31 635-640

5

1.524

0.24

150.00

11.06

0.46

1.23

PRC-31 640-645

5

1.524

0.01

187.00

8.85

1.56

1.14

PRC-31 645-650

5

1.524

0.01

140.00

9.88

1.27

1.79

PRC-31 650-655

5

1.524

0.01

111.00

12.68

0.65

1.93

PRC-31 655-660

5

1.524

0.89

79.00

7.33

0.96

1.20

PRC-31 660-665

5

1.524

0.65

84.00

10.46

1.61

2.21

PRC-31 665-670

5

1.524

0.41

79.00

9.62

1.71

2.00

Combined Metals Bed

PRC-31 670-675

5

1.524

0.21

67.00

9.15

1.77

2.10

PRC-31 680-685

5

1.524

0.01

15.00

30.97

0.56

3.84

PRC-31 685-690

5

1.524

0.01

9.00

18.89

0.34

1.99

PRC-31 690-695

5

1.524

0.01

16.00

27.16

0.55

2.61

PRC-31 695-700

5

1.524

0.01

19.00

7.69

0.79

1.68

Average 630 - 700

65

19.812

0.19

80.23

12.83

0.95

1.86

Hole # and Depth (in feet)

Interval (Feet)

Interval (Metres)

Au (g/t)

Ag (g/t)

Mn %

Pb%

Zn %

Zone of Mineralization

PRC-32

PRC-32 475-480

5

1.524

0.10

80.00

0.70

0.63

0.77

Pioche Shale Susan Duster

PRC-32 480-485

5

1.524

2.09

467.00

6.01

2.57

4.12

PRC-32 485-490

5

1.524

3.53

124.00

3.17

1.67

2.4

Average 475-490

15

4.572

1.91

223.67

3.29

1.62

2.43

PRC-32 580-585

5

1.524

15.00

4.93

0.63

3.88

Combined Metals Bed

PRC-32 585-590

5

1.524

37.00

6.04

0.85

3.37

PRC-32 590-595

5

1.524

0.24

22.00

0.58

0.78

0.81

PRC-32 595-600

5

1.524

4.00

0.95

0.80

2.31

PRC-32 600-605

5

1.524

4.00

1.85

0.06

5.97

PRC-32 605-610

5

1.524

0.03

41.00

7.60

0.37

1.72

PRC-32 610-615

5

1.524

0.27

45.00

9.42

2.32

1.25

PRC-32 615-620

5

1.524

0.48

57.00

3.60

4.17

1.30

PRC-32 620-625

5

1.524

0.10

105.00

9.52

1.34

3.05

PRC-32 625-630

5

1.524

50.00

12.07

0.87

4.00

Pioche Shale D Member

PRC-32 630-635

5

1.524

0.03

50.00

10.06

1.03

1.69

PRC-32 635-640

5

1.524

10.00

1.62

0.17

0.47

PRC-32 640-645

5

1.524

8.00

2.03

0.29

0.78

PRC-32 645-650

5

1.524

1.36

0.24

0.48

Average 580-650

70

21.34

0.09

32.00

5.12

0.99

2.22

Hole # and Depth (in feet)

Interval (Feet)

Interval (Metres)

Au (g/t)

Ag (g/t)

Mn %

Pb%

Zn %

Zone of Mineralization

PRC-33

PRC-33 140-145

5

1.524

0.17

30.00

2.36

1.24

0.24

Lower Lyndon Limestone

PRC-33 145-150

5

1.524

0.21

65.00

4.17

2.29

0.65

Pioche Shale A Member

PRC-33 150-155

5

1.524

0.10

39.00

4.60

2.77

0.49

PRC-33 155-160

5

1.524

0.10

43.00

6.44

1.93

0.68

PRC-33 160-165

5

1.524

0.01

21.00

4.97

1.23

1.82

Average 140-165

25

7.62

0.12

39.60

4.51

1.89

0.78

PRC-33 650-655

5

1.524

8.00

2.05

0.13

0.45

Combined Metals Bed

PRC-33 655-660

5

1.524

36.00

11.15

0.55

1.12

PRC-33 660-665

5

1.524

13.00

4.70

0.22

0.36

Average 650-665

15

4.57

19.00

4.90

0.30

0.64

Hole # and Depth (in feet)

Interval (Feet)

Interval (Metres)

Au (g/t)

Ag (g/t)

Mn %

Pb%

Zn %

Zone of Mineralization

PRC-34

PRC-34 625-630

5

1.524

0.17

55.00

8.84

0.85

6.68

Combined Metals Bed

PRC-34 630-635

5

1.524

0.26

54.00

8.84

0.17

2.98

Average 625-635

10

3.05

0.22

54.50

8.84

0.51

4.83

Hole # and Depth (in feet)

Interval (Feet)

Interval (Metres)

Au (g/t)

Ag (g/t)

Mn %

Pb%

Zn %

Zone of Mineralization

PRC-35

PRC-35 450-455

5

1.524

44.00

9.88

3.36

5.30

A-Shale

PRC-35 455-460

5

1.524

0.10

45.00

9.62

3.77

5.19

PRC-35 460-465

5

1.524

20.00

4.28

1.26

2.00

Average 450-465

15

4.57

0.05

36.33

7.93

2.80

4.16

PRC-35 685-690

5

1.524

9.00

5.23

0.87

1.55

Susan Duster

PRC-35 690-695

5

1.524

27.00

6.32

1.23

2.52

Average 685-695

10

3.05

0.03

18.00

5.78

1.05

2.04

PRC-35 765-770

5

1.524

36.00

4.15

0.85

0.81

Combined Metals Bed

PRC-35 770-775

5

1.524

25.00

1.56

0.39

0.38

PRC-35 775-780

5

1.524

52.00

2.75

2.53

0.87

PRC-35 780-785

5

1.524

58.00

8.17

2.04

0.83

PRC-35 785-790

5

1.524

0.34

114.00

6.32

2.59

3.18

PRC-35 790-795

5

1.524

0.34

48.00

0.73

0.70

1.92

Average 765-795

30

9.144

0.13

55.50

3.95

1.52

1.33

Hole # and Depth (in feet)

Interval (Feet)

Interval (Metres)

Au (g/t)

Ag (g/t)

Mn %

Pb%

Zn %

Zone of Mineralization

PRC-36

PRC-36 40-45

5

1.524

0.14

19.00

1.55

0.53

0.79

Upper Lyndon Limestone (Big Bed)

PRC-36 45-50

5

1.524

0.10

56.00

2.24

0.73

1.29

PRC-36 50-55

5

1.524

0.07

42.00

2.40

0.82

1.16

PRC-36 55-60

5

1.524

0.10

40.00

1.70

0.85

0.75

PRC-36 60-65

5

1.524

0.10

30.00

2.34

0.61

1.18

PRC-36 65-70

5

1.524

0.10

37.00

3.68

1.00

1.50

PRC-36 70-75

5

1.524

0.10

24.00

1.59

0.42

0.81

Average 40-75

35

10.668

0.10

35.43

2.21

0.71

1.07

PRC-36 460-465

5

1.524

0.03

41.00

5.41

1.43

1.16

Lower Lyndon Limestone

PRC-36 465-470

5

1.524

0.10

71.00

8.18

1.93

1.57

Average 460-470

10

3.05

0.07

56.00

6.80

1.68

1.37

PRC-36 505-510

5

1.524

1.87

0.01

2.88

A-Shale

PRC-36 550-555

5

1.524

0.07

31.00

3.73

0.30

0.71

A-Shale

PRC-36 555-560

5

1.524

36.00

4.85

0.62

1.26

PRC-36 560-565

5

1.524

8.00

0.00

0.00

0.00

PRC-36 565-570

5

1.524

8.00

0.00

0.00

0.00

PRC-36 570-575

5

1.524

0.14

10.00

1.95

0.73

0.84

PRC-36 575-580

5

1.524

0.03

16.00

2.72

0.53

1.33

Average 550-580

30

9.14

0.06

18.17

2.21

0.36

0.69

PRC-36 735-740

5

1.524

13.00

2.61

0.28

0.68

Pioche Shale / Susan Duster

PRC-36 740-745

5

1.524

27.00

8.95

1.34

2.63

PRC-36 745-750

5

1.524

0.07

25.00

7.88

0.69

3.63

PRC-36 750-755

5

1.524

8.00

1.66

0.26

0.64

Average 735-755

20

6.096

0.06

18.25

5.28

0.64

1.90

PRC-36 840-845

5

1.524

0.03

63.00

3.18

1.90

0.82

Pioche Shale C Member

PRC-36 845-850

5

1.524

0.10

85.00

3.78

0.66

1.04

Combined Metals Bed

PRC-36 850-855

5

1.524

0.03

63.00

9.36

1.67

2.34

PRC-36 855-860

5

1.524

0.10

90.00

9.95

2.66

2.16

PRC-36 860-865

5

1.524

0.31

35.00

5.29

1.82

1.16

PRC-36 865-870

5

1.524

0.45

43.00

1.23

0.46

0.45

PRC-36 870-875

5

1.524

0.75

38.00

0.39

0.51

0.32

Average 840-875

35

10.668

0.25

59.57

4.74

1.38

1.18

Hole # and Depth (in feet)

Interval (Feet)

Interval (Metres)

Au (g/t)

Ag (g/t)

Mn %

Pb%

Zn %

Zone of Mineralization

PRC-37

PRC-37 560-565d

5

1.524

0.24

208.00

20.47

3.18

5.10

Combined Metals Bed

PRC-37 565-570

5

1.524

0.65

451.00

17.47

3.14

4.05

PRC-37 570-575

5

1.524

0.75

282.00

9.96

1.71

2.22

PRC-37 575-580

5

1.524

1.03

178.00

6.01

1.32

1.32

PRC-37 580-585

5

1.524

0.21

32.00

0.00

0.00

0.00

Average 560-585

25

7.62

0.58

230.20

10.78

1.87

2.54

Hole # and Depth (in feet)

Interval (Feet)

Interval (Metres)

Au (g/t)

Ag (g/t)

Mn %

Pb%

Zn %

Zone of Mineralization

PRC-37 805-810

5

1.524

0.58

11.00

0.36

0.15

0.45

D-Shale

PRC-37 810-815

5

1.524

0.58

11.00

0.02

0.07

0.18

PRC-37 815-820

5

1.524

0.17

3.00

0.27

0.03

0.14

PRC-37 820-825

5

1.524

0.21

6.00

0.23

0.04

0.21

PRC-37 825-830

5

1.524

3.15

10.00

0.28

0.05

0.38

PRC-37 830-835

5

1.524

1.21

289.00

0.19

0.14

7.78

PRC-37 835-840

5

1.524

0.36

6.00

0.01

0.13

0.20

PRC-37 840-845

5

1.524

0.86

3.00

0.01

0.02

0.81

PRC-37 845-850

5

1.524

1.29

2.50

0.02

0.04

0.44

PRC-37 850-855

5

1.524

3.51

38.00

0.02

0.29

2.13

Prospect Mountain Quartzite

PRC-37 855-860

5

1.524

0.24

5.00

0.02

0.05

0.15

PRC-37 860-865

5

1.524

0.21

25.00

0.03

0.15

0.94

PRC-37 865-870

5

1.524

0.63

12.00

0.02

0.14

0.40

PRC-37 870-875

5

1.524

0.86

26.00

0.01

0.31

1.11

PRC-37 875-880

5

1.524

0.82

12.00

0.02

0.22

0.53

PRC-37 880-885

5

1.524

0.99

18.00

0.05

0.44

0.88

PRC-37 885-890

5

1.524

0.48

13.00

0.01

0.18

0.63

Average 805-890

85

25.908

0.95

28.85

0.09

0.14

1.02

PRC-38

Lost this hole and failed to reach targeted depth. Likely due to a fault.

PRC-39

No significant assay results. Hole was drilled along eastern extent of "Exploration Target" zone to test eastern boundary limits.

Hole # and Depth (in feet)

Interval (Feet)

Interval (Metres)

Au (g/t)

Ag (g/t)

Mn %

Pb%

Zn %

Zone of Mineralization

PRC-40

PRC-40 595-600

5

1.524

0.94

175.00

0.00

3.15

0.00

Prospect Mountain Quartzite

Hole intervals marked with "avg" are the average grades of either one or two duplicates of the sample interval.

Quality Assurance / Quality Control

The Company is following a robust QualityAssurance / QualityControl (QA/QC) program designed to meet or exceed CIM and AUSIMM standards. Duplicate samples are extensively used to provide verification both at the primary analytical laboratory and at a second independent laboratory as the program progresses. In addition, a certified field standard is inserted for each drill hole set, and sample blanks are randomly included, with no more than one per hole.

All samples are shipped to the laboratory under secure, standard chain-of-custody procedures. Samples are analyzed using 43-element MS-ICP with aqua regia digestion. Samples exceeding limits for Mn, Zn, or Pb are further tested using wet chemical assays. Most samples are also fire assayed for gold and silver using a one-assay-ton gravimetric method, and an averageof four samplesper hole will have specificgravity measurements conducted at the laboratory.

The principal analytical laboratory for the programis Skyline Assayers& Laboratories Inc., located in Tucson, Arizona, an ISO-accredited facility.

Qualified Person

The scientific and technical information in this news release has been reviewed and approved by John Hiner, P.Geo., a Qualified Person as defined by NI 43-101.

About Prince Silver Corp.

Prince Silver Corp. is a silver exploration company advancing its flagship Prince Silver Project in Nevada, USA, featuring a near-surface, historically drilled deposit that remains open in all directions. The Company also holds an interest in the Stampede Gap Project, a district-scale copper-gold-molybdenum porphyrysystem located 15 km north-northwest of the Prince Silver Project,highlighting Prince Silver'sfocus on high-potential, strategically located exploration assets.

On Behalfof the Board of Directors

Derek Iwanaka, CEO & Director
Tel: 236 335-9383
Email: [email protected]
Website: www.princesilvercorp.com

Forward-Looking Information

This news release contains certain forward-looking statements and forward-looking information within the meaning of applicable securities laws (collectively, "forward-looking statements"). Forward-looking statements are frequently, but not always, identified by words such as "expects," "anticipates," "believes," "intends," "plans," "estimates," "potential," "continues," "ongoing," "may," "will," and similar expressions, or statements that events, conditions or results "could" or "should" occur or be achieved.

Forward-looking statements in this news release include, but are not limited to, statements regarding the interpretation of current and historical drilling results; the scale, continuity, extent and potential of mineralization at the Prince Silver Project; the Company's geological model; the significance of drill results; the potential to define or expand mineralized zones; the timing, scope, continuation and results of the Company's ongoing and future drill programs; the advancement of the Project toward a maiden mineral resource estimate prepared in accordance with National Instrument 43-101; and the Company's exploration plans, objectives and expectations.

These forward-looking statements are based on a number of assumptions, including, among other things, assumptions regarding the continuity of mineralization between drill intercepts; the accuracy of geological interpretations; the availability of financing, personnel, equipment and drill rigs on reasonable terms; the receipt of required permits, approvals and authorizations; and general business, market and economic conditions.

Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to differ materially from those expressed or implied by such forward-looking statements. Such factors include, without limitation, risks relating to exploration and development; the possibility that drilling results will not be consistent with the Company's expectations; risks related to geological interpretation and modelling; uncertainty as to whether further exploration will result in the estimation of a mineral resource; commodity price fluctuations; permitting and regulatory risks; title and environmental risks; operational and technical difficulties; the availability of financing; and general economic, market and industry conditions.

Readers are cautioned not to place undue reliance on forward-looking statements. Forward-looking statements contained in this news release are made as of the date hereof, and the Company undertakes no obligation to update or revise them, except as required by applicable law.

SOURCE: Prince Silver Corp.



View the original press release on ACCESS Newswire

F.Carrillo--TFWP