The Fort Worth Press - High-Resolution Airborne Survey Completed at Music Valley HREE Project

USD -
AED 3.672498
AFN 62.999771
ALL 82.06033
AMD 368.209824
ANG 1.79046
AOA 918.000234
ARS 1398.3059
AUD 1.407925
AWG 1.80225
AZN 1.699016
BAM 1.68319
BBD 2.014527
BDT 122.775311
BGN 1.66992
BHD 0.37725
BIF 2975
BMD 1
BND 1.281294
BOB 6.911598
BRL 5.048099
BSD 1.000207
BTN 96.503322
BWP 13.583201
BYN 2.726365
BYR 19600
BZD 2.011601
CAD 1.37603
CDF 2252.50468
CHF 0.789899
CLF 0.023008
CLP 905.540265
CNY 6.814996
CNH 6.812975
COP 3794.85
CRC 452.511274
CUC 1
CUP 26.5
CVE 95.374978
CZK 20.977021
DJF 177.720099
DKK 6.44407
DOP 58.850004
DZD 132.916201
EGP 53.144779
ERN 15
ETB 156.175858
EUR 0.862297
FJD 2.210309
FKP 0.745062
GBP 0.746925
GEL 2.670297
GGP 0.745062
GHS 11.444954
GIP 0.745062
GMD 73.000222
GNF 8777.502075
GTQ 7.625047
GYD 209.258494
HKD 7.832805
HNL 26.601892
HRK 6.501298
HTG 130.92646
HUF 312.251026
IDR 17690
ILS 2.924802
IMP 0.745062
INR 96.802399
IQD 1310.5
IRR 1320949.999726
ISK 123.649959
JEP 0.745062
JMD 158.241248
JOD 0.708987
JPY 158.981498
KES 129.450167
KGS 87.450149
KHR 4011.502436
KMF 424.000202
KPW 900.049483
KRW 1509.554984
KWD 0.309098
KYD 0.833513
KZT 471.023099
LAK 21949.999964
LBP 89550.000089
LKR 330.512012
LRD 183.275009
LSL 16.695805
LTL 2.95274
LVL 0.60489
LYD 6.359839
MAD 9.224586
MDL 17.303671
MGA 4196.357878
MKD 53.157908
MMK 2099.427985
MNT 3578.349826
MOP 8.069452
MRU 39.989635
MUR 47.409595
MVR 15.399066
MWK 1740.999704
MXN 17.409297
MYR 3.975602
MZN 63.909783
NAD 16.657375
NGN 1372.340003
NIO 36.807704
NOK 9.27685
NPR 154.405487
NZD 1.715019
OMR 0.384502
PAB 1.000207
PEN 3.422764
PGK 4.42356
PHP 61.68903
PKR 278.560536
PLN 3.666498
PYG 6125.724515
QAR 3.645916
RON 4.510799
RSD 101.221953
RUB 71.199703
RWF 1462.799604
SAR 3.752456
SBD 8.032258
SCR 14.092342
SDG 600.477447
SEK 9.412295
SGD 1.281899
SHP 0.746601
SLE 24.613261
SLL 20969.502105
SOS 571.620366
SRD 37.227498
STD 20697.981008
STN 21.085063
SVC 8.751442
SYP 111.458438
SZL 16.702676
THB 32.739816
TJS 9.286861
TMT 3.5
TND 2.927516
TOP 2.40776
TRY 45.59312
TTD 6.780784
TWD 31.661975
TZS 2610.003025
UAH 44.17973
UGX 3771.214155
UYU 40.31911
UZS 12021.721544
VES 517.314502
VND 26363.5
VUV 118.295117
WST 2.706459
XAF 564.531176
XAG 0.013448
XAU 0.000224
XCD 2.70255
XCG 1.802644
XDR 0.702153
XOF 564.523888
XPF 102.636924
YER 238.649702
ZAR 16.709402
ZMK 9001.206174
ZMW 18.829392
ZWL 321.999592
  • RYCEF

    0.0600

    15.45

    +0.39%

  • RBGPF

    0.7200

    63.23

    +1.14%

  • BTI

    -0.2900

    66.06

    -0.44%

  • BP

    0.4500

    46.14

    +0.98%

  • CMSC

    -0.1800

    22.8

    -0.79%

  • NGG

    0.3100

    84.15

    +0.37%

  • BCE

    0.1600

    23.98

    +0.67%

  • AZN

    0.7200

    184.64

    +0.39%

  • GSK

    0.7900

    51.05

    +1.55%

  • RIO

    -2.4100

    100.92

    -2.39%

  • VOD

    0.1500

    15.15

    +0.99%

  • CMSD

    -0.2100

    22.75

    -0.92%

  • JRI

    -0.2300

    12.47

    -1.84%

  • RELX

    -0.3800

    33.58

    -1.13%

  • BCC

    -2.1300

    65.47

    -3.25%

High-Resolution Airborne Survey Completed at Music Valley HREE Project
High-Resolution Airborne Survey Completed at Music Valley HREE Project

High-Resolution Airborne Survey Completed at Music Valley HREE Project

Mapping and sampling underway to refine geological model

Text size:

SAN BERNARDINO, CA / ACCESS Newswire / March 17, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) (Dateline or the Company) is pleased to announce the completion of the geophysical survey covering the Music Valley Heavy Rare Earth Project (Music Valley), located in Riverside and San Bernardino Counties, California, USA.

The magnetic and radiometric survey included all of the 20,520 acres highlighted in the expanded Music Valley Project announcement (ASX Announcement 11 March 2026).

The helicopter-borne survey was undertaken by Precision GeoSurveys based in Reno, Nevada. The 2,172 line kilometre survey was flown on 50m spaced lines at a height of 30m using state of the art equipment.

Highlights

  • 2,172 line kilometre survey completed:The helicopter-borne magnetic and radiometric survey has been completed over the expanded Music Valley HREE Project area, ahead of schedule.

  • Low level = high resolution: The survey was completed on 50 metre line spacings at a flight height of 30 metres, which will generate a high-resolution dataset for processing and interpreting.

  • Data Analysis Underway: The survey data has been provided to Mitre Geophysics for processing, inversions and analysis.

  • Mapping and Sampling Underway: Dateline's consulting REE and structural geology specialists are in the field, mapping and rock chip sampling across the expanded Music Valley HREE Project area.

Dateline's Managing Director, Stephen Baghdadi, commented:

"Completion of the Music Valley airborne survey represents a step in Dateline's systematic exploration of this emerging heavy rare earth district. The data will now be processed and integrated with field mapping and rock chip sampling to refine the Company's geological model and guide the next phase of exploration."

Figure 1: Music Valley HREE Project aerial geophysical survey area shown in red hatched area

Mapping and Field Sampling

The Company's REE specialist, Tony Mariano Jr and Structural geologist Dr Russell Mason, have commenced field mapping and sampling at Music Valley. The primary target will be outcrops of Pinto Gneiss and contact zones with the surrounding rocks in the area.

Rock chip samples collected during this program will be dispatched for assaying, with results expected in 5-7 weeks.

https://storage.googleapis.com/accesswire/media/1148423/dateline-img2-03172026.jpghttps://storage.googleapis.com/accesswire/media/1148423/dateline-img3-03172026.jpghttps://storage.googleapis.com/accesswire/media/1148423/dateline-img4-03172026.jpg

Figure 2: Field and Pinto Gneiss outcrop photos from Music Valley

Additional Information

The Company notes that 252 of the 969 claims referenced in this announcement are the subject of proceedings currently before the Federal Court of Australia (Victoria Registry). Dateline will update the market in accordance with its continuous disclosure obligations.

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline owns 100% of the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

In March 2026, Dateline consolidated the Music Valley Heavy Rare Earth Project in Riverside and San Bernardino Counties, California. The region has known HREE mineralization from USGS rock chip sampling, however it has not been subjected to modern exploration techniques.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

W.Matthews--TFWP