The Fort Worth Press - Eagle Plains Completes Drilling at George Lake Critical Metals Project, Intersects Target Mineralization in All Holes

USD -
AED 3.672497
AFN 63.000366
ALL 82.595413
AMD 374.601453
ANG 1.789731
AOA 916.99986
ARS 1415.829198
AUD 1.40717
AWG 1.8025
AZN 1.704127
BAM 1.683053
BBD 2.003864
BDT 121.680988
BGN 1.647646
BHD 0.37755
BIF 2955.2915
BMD 1
BND 1.274003
BOB 6.899846
BRL 5.175698
BSD 0.994966
BTN 91.779508
BWP 13.520933
BYN 2.908124
BYR 19600
BZD 2.000938
CAD 1.35693
CDF 2160.000052
CHF 0.776835
CLF 0.023044
CLP 909.909933
CNY 6.911097
CNH 6.87922
COP 3763.77
CRC 473.645712
CUC 1
CUP 26.5
CVE 94.887936
CZK 20.97175
DJF 177.169657
DKK 6.42828
DOP 59.420851
DZD 131.365602
EGP 51.94413
ERN 15
ETB 152.788778
EUR 0.86041
FJD 2.198799
FKP 0.746518
GBP 0.744435
GEL 2.730237
GGP 0.746518
GHS 10.724966
GIP 0.746518
GMD 73.000076
GNF 8721.655695
GTQ 7.63144
GYD 208.148496
HKD 7.82415
HNL 26.334495
HRK 6.473976
HTG 130.344427
HUF 333.315503
IDR 16880
ILS 3.09252
IMP 0.746518
INR 91.92715
IQD 1303.386257
IRR 1320900.000544
ISK 124.490493
JEP 0.746518
JMD 155.861814
JOD 0.708992
JPY 157.910502
KES 129.199692
KGS 87.449762
KHR 3992.857604
KMF 424.999639
KPW 900.029469
KRW 1473.390117
KWD 0.30669
KYD 0.829138
KZT 495.443397
LAK 21313.104801
LBP 89094.922357
LKR 309.864851
LRD 181.580351
LSL 16.681568
LTL 2.95274
LVL 0.60489
LYD 6.354288
MAD 9.343362
MDL 17.241869
MGA 4132.352308
MKD 52.937615
MMK 2099.938629
MNT 3586.279594
MOP 8.009776
MRU 39.719461
MUR 45.94987
MVR 15.450166
MWK 1725.22697
MXN 17.583805
MYR 3.92496
MZN 63.910246
NAD 16.681568
NGN 1397.290208
NIO 36.616325
NOK 9.59995
NPR 146.845661
NZD 1.68598
OMR 0.384452
PAB 0.994962
PEN 3.463864
PGK 4.287251
PHP 59.129975
PKR 279.722559
PLN 3.66392
PYG 6402.450831
QAR 3.628462
RON 4.381902
RSD 101.004008
RUB 78.49903
RWF 1454.578312
SAR 3.753174
SBD 8.045182
SCR 13.697605
SDG 600.49594
SEK 9.141297
SGD 1.273155
SHP 0.750259
SLE 24.525002
SLL 20969.49935
SOS 567.61513
SRD 37.667014
STD 20697.981008
STN 21.08343
SVC 8.705305
SYP 110.55686
SZL 16.692913
THB 31.71296
TJS 9.536583
TMT 3.5
TND 2.926332
TOP 2.40776
TRY 44.052755
TTD 6.750971
TWD 31.841012
TZS 2596.000236
UAH 43.724539
UGX 3745.950063
UYU 39.80138
UZS 12129.374255
VES 432.62565
VND 26235
VUV 119.79372
WST 2.734505
XAF 564.480167
XAG 0.011359
XAU 0.000194
XCD 2.70255
XCG 1.793124
XDR 0.702035
XOF 564.482595
XPF 102.628533
YER 238.59943
ZAR 16.34665
ZMK 9001.195316
ZMW 19.228006
ZWL 321.999592
  • BTI

    0.7400

    59.07

    +1.25%

  • GSK

    -0.0300

    55.48

    -0.05%

  • RELX

    -0.3300

    35.35

    -0.93%

  • BCE

    0.2350

    26.115

    +0.9%

  • BP

    -0.3600

    40.29

    -0.89%

  • AZN

    1.2050

    196.155

    +0.61%

  • RBGPF

    0.1000

    82.5

    +0.12%

  • RYCEF

    -0.0600

    16.9

    -0.36%

  • CMSC

    0.0000

    23.22

    0%

  • BCC

    -0.7550

    73.735

    -1.02%

  • NGG

    0.0300

    90.44

    +0.03%

  • VOD

    0.0700

    14.55

    +0.48%

  • JRI

    0.0330

    12.613

    +0.26%

  • CMSD

    0.0250

    23.185

    +0.11%

  • RIO

    0.7100

    91.06

    +0.78%

Eagle Plains Completes Drilling at George Lake Critical Metals Project, Intersects Target Mineralization in All Holes
Eagle Plains Completes Drilling at George Lake Critical Metals Project, Intersects Target Mineralization in All Holes

Eagle Plains Completes Drilling at George Lake Critical Metals Project, Intersects Target Mineralization in All Holes

CRANBROOK, BC / ACCESS Newswire / March 10, 2026 / Eagle Plains Resources Ltd. (TSXV:EPL)(OTCQB:EGPLF) ("EPL" or "Eagle Plains") is pleased to report that the final hole at the George Lake Project has been completed after intersecting the George Lake Zn/Pb deposit horizon. A total of 1591m in three holes was drilled, with all holes intersecting the target horizon. The deepest 2026 intersection is approximately 208m vertically below the deepest historical intercept. Analytical results are pending for all holes. Preliminary interpretation of the 2026 drilling, along with historical results indicates that mineralization remains open down-dip and along strike.

Text size:

George Lake Drill-hole Plan here

The recently completed hole, GL26003, is a 185m step-out to the northeast of GL26001, and undercut historic drillholes GL08-08B and GL08-03 (40.0m (221.5-261.5m) @ 1.80% Zn/0.23% Pb including 7.00m (252.5-259.5m) @ 5.23% Zn/1.00% Pb). The mineralized George Lake deposit horizon was intersected from 394.8 - 451.3m, a drill length of 56.5m. Mineralization occurs as disseminated sphalerite and pyrite, with local sphalerite stringer veins. The clean quartzite host has pervasive silicification and moderate sericite alteration. The mineralized horizon was intersected approximately 155m downdip from GL08-08B, the closest hole on the section.

Chuck Downie, P.Geo., President and CEO of Eagle Plains recently stated "We are very pleased with the initial results from the first George Lake drilling in nearly two decades, which has extended the known mineralization up to 200m deeper than historical intercepts. The multi kilometer scale and predictable orientation of the host stratigraphy, demonstrates the potential to continue to expand the known mineralization both down-dip and along strike. Additionally, I would like to commend the Terralogic crew for completing the program under extremely challenging weather conditions."

The George Lake deposit horizon is characterized by significant critical metal mineralization over a broad strike length of approximately 8.1 kilometers. The source of this mineralization has never been established, and forms the basis for Eagle Plains' continuing exploration work.

2026 Drilling Summary

Hole ID

Easting*

Northing*

Az

Dip

Total
Depth (m)

GL26001

574919

6370769

311°

-62°

580

GL26002

574767

6370645

319°

-62°

550

GL26003

575071

6370873

311°

-58°

461

Total Meters Drilled:

1591

*Coordinates projected in NAD83 UTM Zone 13N

Drill-hole GL26001 was designed to undercut historic drillholes GL08-02: 55.8m (206.0-261.8m) @ 4.01% Zn/0.54%Pb including 8.0m (252.8-260.6m) @ 6.96% Zn/1.42% Pb) and GL-21: 32.0m (286.5-318.5m) @ 3.66% Zn/0.40% Pb including 10.7m (297.2-307.9m) @ 5.43% Zn/0.34% Pb). The intersected mineralized stratigraphy has a drill length of 56m from 480-536m. The mineralized horizon was intersected approximately 208m downdip from GL-21, the closest hole on the section and one of the deepest holes historically drilled at the deposit.

Drill-hole GL26002, an 200m step-out to the southwest of GL26001, undercut historic drillholes GL08-01: 57.90m (189.2-247.1m) @ 2.69% Zn/0.41% Pb including 6.0m (220.1-226.1m) @ 5.37% Zn/0.64% Pb) and GL-25: 42.7m (237.7-280.4m) @ 3.09% Zn/0.36% Pb including 10.7m (239.3-250.0) @ 5.38% Zn /0.81% Pb). The mineralized zone has a length of 49m from 468-517m, and was intersected approximately 171m downdip from GL-25, the closest hole on the section and one of the deepest holes historically drilled at the deposit.

The 2026 drill targeting is driven by results from geophysical and technical work, paired with advanced interpretation. The holes were located to test for down dip extensions of the prospective sedimentary exhalative (sedex) stratigraphy, over a strike length of 385m. The program was conducted by TerraLogic Exploration Inc. of Cranbrook, BC under the direction of Kerry Bates, P.Geo., Exploration Manager for Eagle Plains. The drill contractor was New Age Drilling Solutions.

George Lake is one of the projects included in a formal Exploration Agreement between Eagle Plains and the Ya'thi Néné Lands and Resource Office ("YNLR"), representing the Athabasca Denesułiné First Nations of Hatchet Lake, Black Lake, and Fond du Lac, the Northern Hamlet of Stony Rapids, and the Northern Settlements of Uranium City, Wollaston Lake and Camsell Portage. YNLR has been providing technical support for the program.

The project is also eligible for the Saskatchewan Targeted Mineral Exploration Incentive (TMEI), which may provide funding of up to $150,000 towards drilling-related program costs.

Detailed reporting will be released when all geochemical results have been received and interpreted.

All drill indicated intercepts as reported in this news release are measured along core length and true thickness is yet to be determined.

About the George Lake Project

The fully permitted 6165 ha George Lake project is located 280km north of La Ronge, Saskatchewan. The project has excellent access and is located on a recently completed highway connecting Saskatchewan Highway 905 to the community of Wollaston Lake. Eagle Plains holds a 100% interest in claims comprising the property, subject to a 2% royalty held in favour of Summit Royalties Ltd., 1% of which can be bought back by Eagle Plains for $1,000,000.

See George Lake Project Information and Map here

George Lake Project Highlights

  • 4,131m of historical drilling completed in 22 holes at the deposit, with the best drill holes returning 57.9m grading 2.65% Zn and 0.41% Pb (including 13.5m grading 4.36% Zn and 0.76% Pb) (DDH GL08-01) and 47.8m grading 4.03% Zn and 0.44% Pb (including 8.0m grading 6.96% Zn and 01.42% Pb) (DDH GL08-02) (SMAF 64E05 0033);

  • George Lake Deposit comes to surface and has dimensions of approximately 35m width x 800m length, and is open to depth and along strike;

  • Potential for discovery of extensions of existing mineralization and other discrete mineralization elsewhere on the property;

The property overlies 13 Saskatchewan Mineral Deposit Index ("SMDI") occurrences including the George Lake Zn Deposit. Zinc and lead mineralized boulders were discovered in the George Lake area in 1965 which led Falconbridge Nickel Mines to acquire a large land position in the area, resulting in a 34-hole diamond drill program in 1969-70 which defined the George Lake deposit. The deposit contains sedimentary-exhalative ("sedex") style mineralization, with a higher-grade core of >5% Zn.

Some of the above results were taken directly from the SMDI descriptions and assessment reports (SMAF) filed with the Saskatchewan government. Management cautions that historical results were collected and reported by past operators and have not been verified nor confirmed by a Qualified Person, but form a basis for ongoing work on the subject properties. All drill indicated intercepts as reported in this news release are measured along core length and true thickness is yet to be determined.

Qualified Person

Technical information in this News Release has been reviewed and approved by C.C. Downie, P.Geo., a director and officer of Eagle Plains, hereby identified as the "Qualified Person" under N.I. 43-101.

About Eagle Plains Resources

Based in Cranbrook, B.C., Eagle Plains is a well-funded, prolific project generator that continues to conduct research, acquire and explore mineral projects throughout western Canada, with a focus on critical metals integral to an increasingly electrified, decarbonized economy.

The Company was formed in 1992 and is the fourth-oldest listed issuer on the TSX-V (and the only one of these four that has not seen a roll-back or restructuring of its shares). Eagle Plains has continued to deliver shareholder value over the years and through numerous spin outs has transferred over $110,000,000 in value directly to its shareholders, with Copper Canyon Resources and Taiga Gold Corp. being notable examples. Eagle Plains latest spinout, Eagle Royalties Ltd. (CSE:"ER") was listed on May 24, 2023, and on October 30, 2025, ER shareholders overwhelmingly approved a three-cornered amalgamation that resulted in a reverse takeover of Eagle Royalties by Summit Royalty Corp. The resulting issuer is named Summit Royalties Ltd. and trades under the symbol SUM on the TSX Venture Exchange with a market capitalization of over $100M.

On October 2, 2024, Eagle Plains announced the formation of a separate division within the Company that will give Eagle Plains' shareholders direct exposure to strategic opportunities in Canadian green energy transition. As a wholly owned subsidiary of Eagle Plains, Osprey Power Inc. ("OP") will focus on identifying and advancing innovative and diverse clean energy project portfolios in target markets throughout Canada, with an initial focus on Western Canada.

Eagle Plains' core business is acquiring grassroots critical- and precious-metal exploration properties. The Company is committed to steadily enhancing shareholder value by advancing our diverse portfolio of projects toward discovery through collaborative partnerships and development of a highly experienced technical team.

Expenditures from 2010-2025 on Eagle Plains-related projects exceed $41M, the majority of which was funded by third-party partners. This exploration work resulted in approximately 50,000m of diamond-drilling and extensive ground-based exploration work facilitating the advancement of numerous projects at various stages of development.

Throughout the exploration process, our mission is to help maintain prosperous communities by exploring for and discovering resource opportunities while building lasting relationships through honest and respectful business practices.

On behalf of the Board of Directors of Eagle Plains

"C.C. (Chuck) Downie" P.Geo

President and CEO

For further information on EPL, please contact Andrew Wilson at 1 866 HUNT ORE (486 8673)
Email: [email protected] or visit our website at https://www.eagleplains.com

Cautionary Note Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

SOURCE: Eagle Plains Resources Ltd.



View the original press release on ACCESS Newswire

T.Harrison--TFWP