The Fort Worth Press - Eagle Plains Completes Drilling at George Lake Critical Metals Project, Intersects Target Mineralization in All Holes

USD -
AED 3.672498
AFN 62.999771
ALL 82.06033
AMD 368.209824
ANG 1.79046
AOA 918.000234
ARS 1398.3059
AUD 1.407925
AWG 1.80225
AZN 1.699016
BAM 1.68319
BBD 2.014527
BDT 122.775311
BGN 1.66992
BHD 0.37725
BIF 2975
BMD 1
BND 1.281294
BOB 6.911598
BRL 5.048099
BSD 1.000207
BTN 96.503322
BWP 13.583201
BYN 2.726365
BYR 19600
BZD 2.011601
CAD 1.37603
CDF 2252.50468
CHF 0.789899
CLF 0.023008
CLP 905.540265
CNY 6.814996
CNH 6.812975
COP 3794.85
CRC 452.511274
CUC 1
CUP 26.5
CVE 95.374978
CZK 20.977021
DJF 177.720099
DKK 6.44407
DOP 58.850004
DZD 132.916201
EGP 53.144779
ERN 15
ETB 156.175858
EUR 0.862297
FJD 2.210309
FKP 0.745062
GBP 0.746925
GEL 2.670297
GGP 0.745062
GHS 11.444954
GIP 0.745062
GMD 73.000222
GNF 8777.502075
GTQ 7.625047
GYD 209.258494
HKD 7.832805
HNL 26.601892
HRK 6.501298
HTG 130.92646
HUF 312.251026
IDR 17690
ILS 2.924802
IMP 0.745062
INR 96.802399
IQD 1310.5
IRR 1320949.999726
ISK 123.649959
JEP 0.745062
JMD 158.241248
JOD 0.708987
JPY 158.981498
KES 129.450167
KGS 87.450149
KHR 4011.502436
KMF 424.000202
KPW 900.049483
KRW 1509.554984
KWD 0.309098
KYD 0.833513
KZT 471.023099
LAK 21949.999964
LBP 89550.000089
LKR 330.512012
LRD 183.275009
LSL 16.695805
LTL 2.95274
LVL 0.60489
LYD 6.359839
MAD 9.224586
MDL 17.303671
MGA 4196.357878
MKD 53.157908
MMK 2099.427985
MNT 3578.349826
MOP 8.069452
MRU 39.989635
MUR 47.409595
MVR 15.399066
MWK 1740.999704
MXN 17.409297
MYR 3.975602
MZN 63.909783
NAD 16.657375
NGN 1372.340003
NIO 36.807704
NOK 9.27685
NPR 154.405487
NZD 1.715019
OMR 0.384502
PAB 1.000207
PEN 3.422764
PGK 4.42356
PHP 61.68903
PKR 278.560536
PLN 3.666498
PYG 6125.724515
QAR 3.645916
RON 4.510799
RSD 101.221953
RUB 71.199703
RWF 1462.799604
SAR 3.752456
SBD 8.032258
SCR 14.092342
SDG 600.477447
SEK 9.412295
SGD 1.281899
SHP 0.746601
SLE 24.613261
SLL 20969.502105
SOS 571.620366
SRD 37.227498
STD 20697.981008
STN 21.085063
SVC 8.751442
SYP 111.458438
SZL 16.702676
THB 32.739816
TJS 9.286861
TMT 3.5
TND 2.927516
TOP 2.40776
TRY 45.59312
TTD 6.780784
TWD 31.661975
TZS 2610.003025
UAH 44.17973
UGX 3771.214155
UYU 40.31911
UZS 12021.721544
VES 517.314502
VND 26363.5
VUV 118.295117
WST 2.706459
XAF 564.531176
XAG 0.013448
XAU 0.000224
XCD 2.70255
XCG 1.802644
XDR 0.702153
XOF 564.523888
XPF 102.636924
YER 238.649702
ZAR 16.709402
ZMK 9001.206174
ZMW 18.829392
ZWL 321.999592
  • CMSD

    -0.2100

    22.75

    -0.92%

  • JRI

    -0.2300

    12.47

    -1.84%

  • CMSC

    -0.1800

    22.8

    -0.79%

  • GSK

    0.7900

    51.05

    +1.55%

  • AZN

    0.7200

    184.64

    +0.39%

  • NGG

    0.3100

    84.15

    +0.37%

  • BTI

    -0.2900

    66.06

    -0.44%

  • RIO

    -2.4100

    100.92

    -2.39%

  • RBGPF

    0.7200

    63.23

    +1.14%

  • BCE

    0.1600

    23.98

    +0.67%

  • BP

    0.4500

    46.14

    +0.98%

  • RYCEF

    0.0600

    15.45

    +0.39%

  • VOD

    0.1500

    15.15

    +0.99%

  • RELX

    -0.3800

    33.58

    -1.13%

  • BCC

    -2.1300

    65.47

    -3.25%

Eagle Plains Completes Drilling at George Lake Critical Metals Project, Intersects Target Mineralization in All Holes
Eagle Plains Completes Drilling at George Lake Critical Metals Project, Intersects Target Mineralization in All Holes

Eagle Plains Completes Drilling at George Lake Critical Metals Project, Intersects Target Mineralization in All Holes

CRANBROOK, BC / ACCESS Newswire / March 10, 2026 / Eagle Plains Resources Ltd. (TSXV:EPL)(OTCQB:EGPLF) ("EPL" or "Eagle Plains") is pleased to report that the final hole at the George Lake Project has been completed after intersecting the George Lake Zn/Pb deposit horizon. A total of 1591m in three holes was drilled, with all holes intersecting the target horizon. The deepest 2026 intersection is approximately 208m vertically below the deepest historical intercept. Analytical results are pending for all holes. Preliminary interpretation of the 2026 drilling, along with historical results indicates that mineralization remains open down-dip and along strike.

Text size:

George Lake Drill-hole Plan here

The recently completed hole, GL26003, is a 185m step-out to the northeast of GL26001, and undercut historic drillholes GL08-08B and GL08-03 (40.0m (221.5-261.5m) @ 1.80% Zn/0.23% Pb including 7.00m (252.5-259.5m) @ 5.23% Zn/1.00% Pb). The mineralized George Lake deposit horizon was intersected from 394.8 - 451.3m, a drill length of 56.5m. Mineralization occurs as disseminated sphalerite and pyrite, with local sphalerite stringer veins. The clean quartzite host has pervasive silicification and moderate sericite alteration. The mineralized horizon was intersected approximately 155m downdip from GL08-08B, the closest hole on the section.

Chuck Downie, P.Geo., President and CEO of Eagle Plains recently stated "We are very pleased with the initial results from the first George Lake drilling in nearly two decades, which has extended the known mineralization up to 200m deeper than historical intercepts. The multi kilometer scale and predictable orientation of the host stratigraphy, demonstrates the potential to continue to expand the known mineralization both down-dip and along strike. Additionally, I would like to commend the Terralogic crew for completing the program under extremely challenging weather conditions."

The George Lake deposit horizon is characterized by significant critical metal mineralization over a broad strike length of approximately 8.1 kilometers. The source of this mineralization has never been established, and forms the basis for Eagle Plains' continuing exploration work.

2026 Drilling Summary

Hole ID

Easting*

Northing*

Az

Dip

Total
Depth (m)

GL26001

574919

6370769

311°

-62°

580

GL26002

574767

6370645

319°

-62°

550

GL26003

575071

6370873

311°

-58°

461

Total Meters Drilled:

1591

*Coordinates projected in NAD83 UTM Zone 13N

Drill-hole GL26001 was designed to undercut historic drillholes GL08-02: 55.8m (206.0-261.8m) @ 4.01% Zn/0.54%Pb including 8.0m (252.8-260.6m) @ 6.96% Zn/1.42% Pb) and GL-21: 32.0m (286.5-318.5m) @ 3.66% Zn/0.40% Pb including 10.7m (297.2-307.9m) @ 5.43% Zn/0.34% Pb). The intersected mineralized stratigraphy has a drill length of 56m from 480-536m. The mineralized horizon was intersected approximately 208m downdip from GL-21, the closest hole on the section and one of the deepest holes historically drilled at the deposit.

Drill-hole GL26002, an 200m step-out to the southwest of GL26001, undercut historic drillholes GL08-01: 57.90m (189.2-247.1m) @ 2.69% Zn/0.41% Pb including 6.0m (220.1-226.1m) @ 5.37% Zn/0.64% Pb) and GL-25: 42.7m (237.7-280.4m) @ 3.09% Zn/0.36% Pb including 10.7m (239.3-250.0) @ 5.38% Zn /0.81% Pb). The mineralized zone has a length of 49m from 468-517m, and was intersected approximately 171m downdip from GL-25, the closest hole on the section and one of the deepest holes historically drilled at the deposit.

The 2026 drill targeting is driven by results from geophysical and technical work, paired with advanced interpretation. The holes were located to test for down dip extensions of the prospective sedimentary exhalative (sedex) stratigraphy, over a strike length of 385m. The program was conducted by TerraLogic Exploration Inc. of Cranbrook, BC under the direction of Kerry Bates, P.Geo., Exploration Manager for Eagle Plains. The drill contractor was New Age Drilling Solutions.

George Lake is one of the projects included in a formal Exploration Agreement between Eagle Plains and the Ya'thi Néné Lands and Resource Office ("YNLR"), representing the Athabasca Denesułiné First Nations of Hatchet Lake, Black Lake, and Fond du Lac, the Northern Hamlet of Stony Rapids, and the Northern Settlements of Uranium City, Wollaston Lake and Camsell Portage. YNLR has been providing technical support for the program.

The project is also eligible for the Saskatchewan Targeted Mineral Exploration Incentive (TMEI), which may provide funding of up to $150,000 towards drilling-related program costs.

Detailed reporting will be released when all geochemical results have been received and interpreted.

All drill indicated intercepts as reported in this news release are measured along core length and true thickness is yet to be determined.

About the George Lake Project

The fully permitted 6165 ha George Lake project is located 280km north of La Ronge, Saskatchewan. The project has excellent access and is located on a recently completed highway connecting Saskatchewan Highway 905 to the community of Wollaston Lake. Eagle Plains holds a 100% interest in claims comprising the property, subject to a 2% royalty held in favour of Summit Royalties Ltd., 1% of which can be bought back by Eagle Plains for $1,000,000.

See George Lake Project Information and Map here

George Lake Project Highlights

  • 4,131m of historical drilling completed in 22 holes at the deposit, with the best drill holes returning 57.9m grading 2.65% Zn and 0.41% Pb (including 13.5m grading 4.36% Zn and 0.76% Pb) (DDH GL08-01) and 47.8m grading 4.03% Zn and 0.44% Pb (including 8.0m grading 6.96% Zn and 01.42% Pb) (DDH GL08-02) (SMAF 64E05 0033);

  • George Lake Deposit comes to surface and has dimensions of approximately 35m width x 800m length, and is open to depth and along strike;

  • Potential for discovery of extensions of existing mineralization and other discrete mineralization elsewhere on the property;

The property overlies 13 Saskatchewan Mineral Deposit Index ("SMDI") occurrences including the George Lake Zn Deposit. Zinc and lead mineralized boulders were discovered in the George Lake area in 1965 which led Falconbridge Nickel Mines to acquire a large land position in the area, resulting in a 34-hole diamond drill program in 1969-70 which defined the George Lake deposit. The deposit contains sedimentary-exhalative ("sedex") style mineralization, with a higher-grade core of >5% Zn.

Some of the above results were taken directly from the SMDI descriptions and assessment reports (SMAF) filed with the Saskatchewan government. Management cautions that historical results were collected and reported by past operators and have not been verified nor confirmed by a Qualified Person, but form a basis for ongoing work on the subject properties. All drill indicated intercepts as reported in this news release are measured along core length and true thickness is yet to be determined.

Qualified Person

Technical information in this News Release has been reviewed and approved by C.C. Downie, P.Geo., a director and officer of Eagle Plains, hereby identified as the "Qualified Person" under N.I. 43-101.

About Eagle Plains Resources

Based in Cranbrook, B.C., Eagle Plains is a well-funded, prolific project generator that continues to conduct research, acquire and explore mineral projects throughout western Canada, with a focus on critical metals integral to an increasingly electrified, decarbonized economy.

The Company was formed in 1992 and is the fourth-oldest listed issuer on the TSX-V (and the only one of these four that has not seen a roll-back or restructuring of its shares). Eagle Plains has continued to deliver shareholder value over the years and through numerous spin outs has transferred over $110,000,000 in value directly to its shareholders, with Copper Canyon Resources and Taiga Gold Corp. being notable examples. Eagle Plains latest spinout, Eagle Royalties Ltd. (CSE:"ER") was listed on May 24, 2023, and on October 30, 2025, ER shareholders overwhelmingly approved a three-cornered amalgamation that resulted in a reverse takeover of Eagle Royalties by Summit Royalty Corp. The resulting issuer is named Summit Royalties Ltd. and trades under the symbol SUM on the TSX Venture Exchange with a market capitalization of over $100M.

On October 2, 2024, Eagle Plains announced the formation of a separate division within the Company that will give Eagle Plains' shareholders direct exposure to strategic opportunities in Canadian green energy transition. As a wholly owned subsidiary of Eagle Plains, Osprey Power Inc. ("OP") will focus on identifying and advancing innovative and diverse clean energy project portfolios in target markets throughout Canada, with an initial focus on Western Canada.

Eagle Plains' core business is acquiring grassroots critical- and precious-metal exploration properties. The Company is committed to steadily enhancing shareholder value by advancing our diverse portfolio of projects toward discovery through collaborative partnerships and development of a highly experienced technical team.

Expenditures from 2010-2025 on Eagle Plains-related projects exceed $41M, the majority of which was funded by third-party partners. This exploration work resulted in approximately 50,000m of diamond-drilling and extensive ground-based exploration work facilitating the advancement of numerous projects at various stages of development.

Throughout the exploration process, our mission is to help maintain prosperous communities by exploring for and discovering resource opportunities while building lasting relationships through honest and respectful business practices.

On behalf of the Board of Directors of Eagle Plains

"C.C. (Chuck) Downie" P.Geo

President and CEO

For further information on EPL, please contact Andrew Wilson at 1 866 HUNT ORE (486 8673)
Email: [email protected] or visit our website at https://www.eagleplains.com

Cautionary Note Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

SOURCE: Eagle Plains Resources Ltd.



View the original press release on ACCESS Newswire

T.Harrison--TFWP