The Fort Worth Press - Dateline Commences Music Valley Exploration Program

USD -
AED 3.672504
AFN 63.503991
ALL 83.192586
AMD 375.730804
ANG 1.790083
AOA 917.000367
ARS 1385.503978
AUD 1.450747
AWG 1.8
AZN 1.70397
BAM 1.693993
BBD 2.007535
BDT 122.298731
BGN 1.709309
BHD 0.376597
BIF 2960.807241
BMD 1
BND 1.28353
BOB 6.91265
BRL 5.255304
BSD 0.996752
BTN 94.473171
BWP 13.741284
BYN 2.966957
BYR 19600
BZD 2.004591
CAD 1.38985
CDF 2282.50392
CHF 0.798523
CLF 0.023433
CLP 925.260396
CNY 6.91185
CNH 6.92017
COP 3662.985579
CRC 462.864319
CUC 1
CUP 26.5
CVE 95.504742
CZK 21.309304
DJF 177.489065
DKK 6.492704
DOP 59.330475
DZD 133.010264
EGP 52.642155
ERN 15
ETB 154.083756
EUR 0.866104
FJD 2.257404
FKP 0.75231
GBP 0.750441
GEL 2.680391
GGP 0.75231
GHS 10.921138
GIP 0.75231
GMD 73.503851
GNF 8739.335672
GTQ 7.62808
GYD 208.64406
HKD 7.82615
HNL 26.46399
HRK 6.545204
HTG 130.656966
HUF 338.020388
IDR 16990.8
ILS 3.13762
IMP 0.75231
INR 94.850204
IQD 1305.703521
IRR 1313250.000352
ISK 124.760386
JEP 0.75231
JMD 156.892296
JOD 0.70904
JPY 160.28704
KES 129.470356
KGS 87.450384
KHR 3992.031527
KMF 428.00035
KPW 899.886996
KRW 1508.00035
KWD 0.30791
KYD 0.830627
KZT 481.867394
LAK 21678.576069
LBP 89256.247023
LKR 313.975142
LRD 182.893768
LSL 17.115586
LTL 2.95274
LVL 0.60489
LYD 6.362652
MAD 9.315751
MDL 17.507254
MGA 4153.999394
MKD 53.388766
MMK 2102.490525
MNT 3571.507434
MOP 8.042181
MRU 39.797324
MUR 46.770378
MVR 15.450378
MWK 1728.292408
MXN 18.122104
MYR 3.924039
MZN 63.950377
NAD 17.115586
NGN 1383.460377
NIO 36.680958
NOK 9.70286
NPR 151.156728
NZD 1.745963
OMR 0.38408
PAB 0.996752
PEN 3.472089
PGK 4.307306
PHP 60.550375
PKR 278.184401
PLN 3.72275
PYG 6516.824737
QAR 3.634057
RON 4.427304
RSD 101.684639
RUB 81.295743
RWF 1455.545451
SAR 3.752751
SBD 8.042037
SCR 15.03876
SDG 601.000339
SEK 9.47367
SGD 1.292704
SHP 0.750259
SLE 24.550371
SLL 20969.510825
SOS 569.659175
SRD 37.601038
STD 20697.981008
STN 21.220389
SVC 8.721147
SYP 111.824334
SZL 17.114027
THB 32.495038
TJS 9.523624
TMT 3.5
TND 2.938634
TOP 2.40776
TRY 44.440368
TTD 6.772336
TWD 32.044404
TZS 2571.564679
UAH 43.689489
UGX 3713.134988
UYU 40.344723
UZS 12155.385215
VES 467.928355
VND 26337.5
VUV 119.756335
WST 2.77551
XAF 568.149495
XAG 0.014291
XAU 0.000222
XCD 2.70255
XCG 1.796371
XDR 0.706596
XOF 568.149495
XPF 103.295656
YER 238.603589
ZAR 17.12001
ZMK 9001.203584
ZMW 18.763154
ZWL 321.999592
  • RBGPF

    -13.5000

    69

    -19.57%

  • NGG

    -0.4800

    81.92

    -0.59%

  • GSK

    -0.1000

    53.84

    -0.19%

  • BTI

    0.3749

    57.8

    +0.65%

  • CMSC

    -0.0500

    22.77

    -0.22%

  • BCE

    -0.2200

    25.25

    -0.87%

  • RYCEF

    -0.5900

    14.65

    -4.03%

  • RIO

    0.8500

    86.64

    +0.98%

  • AZN

    5.0200

    188.42

    +2.66%

  • RELX

    -0.1000

    31.97

    -0.31%

  • CMSD

    -0.0900

    22.66

    -0.4%

  • BP

    0.5100

    46.68

    +1.09%

  • JRI

    -0.2700

    11.8

    -2.29%

  • BCC

    0.1400

    74.43

    +0.19%

  • VOD

    -0.1400

    14.49

    -0.97%

Dateline Commences Music Valley Exploration Program
Dateline Commences Music Valley Exploration Program

Dateline Commences Music Valley Exploration Program

Fast tracked heavy rare earth program

Text size:

SAN BERNARDINO, CALIFORNIA / ACCESS Newswire / March 3, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) (Dateline or the Company) is pleased to announce it has commenced exploration activities at the newly acquired Music Valley HREE Project (Music Valley), located in Riverside County, California, USA.

As part of the Company's exploration program, a high-resolution helicopter-borne magnetic and radiometric survey will commence next week, covering Music Valley and the surrounding area to the north. These surveys are expected to aid in vectoring us into areas that contain the prospective Pinto Gneiss.

Additionally, REE expert, Tony Mariano Jr, and structural geologist, Dr Russell Mason, will arrive on site next week to commence mapping and rock chip sampling of the project area. Preliminary desktop analysis of USGS mapping has identified several areas for detailed inspection and sampling.

Dateline's Managing Director, Stephen Baghdadi, commented:

"We are not wasting a single day at Music Valley. Within days of completing the acquisition, we have mobilized airborne geophysics and assembled a specialist REE team on the ground. This is deliberate, disciplined and urgent execution.

"The United States urgently needs domestic sources of heavy rare earths. Dysprosium, terbium and yttrium are strategic materials, and secure supply is no longer optional, it is essential.

"Music Valley has the geological ingredients, and we will continue to move quickly and methodically to determine whether it can become part of that solution."

Music Valley Geophysical Survey

The Company has contacted Precision GeoSurveys to complete a 2,172 line kilometer magnetic and radiometric survey at Music Valley. The survey will cover the claims acquired from Fermi as well as prospective ground to the north and northeast.

The survey will be helicopter-borne, allowing a low level, high-resolution survey to be completed. The survey will be flown at a height of 30m and line spacing of 50m. The survey will commence next week and is expected to take 8-10 days to complete.

Mapping and Rock Chip Sampling

The Music Valley area contains a significant amount of outcrop. Geological mapping by the USGS, shown in Figure 1, highlights that significant portions of the project area are not overlain by transported material. A number of structural measurements are shown, indicating that outcropping geology is present and intact across the project area.

Figure 1: Music Valley Project overlain over the USGS Geologic Map of the Valley Mountain 15' Quadrangle

REE specialist, Tony Mariano Jr, and structural geologist, Dr Russell Mason, will head to Music Valley next week to commence a detailed rock chip sampling and geological mapping campaign. The focus of the program will be to develop a detailed geological model for the area and identify priority zones of Pinto Gneiss for sampling and follow-up.

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:

X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline owns 100% of the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

In February 2026, Dateline announced the acquisition of the Music Valley Heavy Rare Earth Project in Riverside County, California. The region has known HREE mineralisation from USGS rock chip sampling, however it has not been subjected to modern exploration techniques.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

J.P.Cortez--TFWP