The Fort Worth Press - Dateline Commences Music Valley Exploration Program

USD -
AED 3.672498
AFN 62.999771
ALL 82.06033
AMD 368.209824
ANG 1.79046
AOA 918.000234
ARS 1398.3059
AUD 1.407925
AWG 1.80225
AZN 1.699016
BAM 1.68319
BBD 2.014527
BDT 122.775311
BGN 1.66992
BHD 0.37725
BIF 2975
BMD 1
BND 1.281294
BOB 6.911598
BRL 5.048099
BSD 1.000207
BTN 96.503322
BWP 13.583201
BYN 2.726365
BYR 19600
BZD 2.011601
CAD 1.37603
CDF 2252.50468
CHF 0.789899
CLF 0.023008
CLP 905.540265
CNY 6.814996
CNH 6.812975
COP 3794.85
CRC 452.511274
CUC 1
CUP 26.5
CVE 95.374978
CZK 20.977021
DJF 177.720099
DKK 6.44407
DOP 58.850004
DZD 132.916201
EGP 53.144779
ERN 15
ETB 156.175858
EUR 0.862297
FJD 2.210309
FKP 0.745062
GBP 0.746925
GEL 2.670297
GGP 0.745062
GHS 11.444954
GIP 0.745062
GMD 73.000222
GNF 8777.502075
GTQ 7.625047
GYD 209.258494
HKD 7.832805
HNL 26.601892
HRK 6.501298
HTG 130.92646
HUF 312.251026
IDR 17690
ILS 2.924802
IMP 0.745062
INR 96.802399
IQD 1310.5
IRR 1320949.999726
ISK 123.649959
JEP 0.745062
JMD 158.241248
JOD 0.708987
JPY 158.981498
KES 129.450167
KGS 87.450149
KHR 4011.502436
KMF 424.000202
KPW 900.049483
KRW 1509.554984
KWD 0.309098
KYD 0.833513
KZT 471.023099
LAK 21949.999964
LBP 89550.000089
LKR 330.512012
LRD 183.275009
LSL 16.695805
LTL 2.95274
LVL 0.60489
LYD 6.359839
MAD 9.224586
MDL 17.303671
MGA 4196.357878
MKD 53.157908
MMK 2099.427985
MNT 3578.349826
MOP 8.069452
MRU 39.989635
MUR 47.409595
MVR 15.399066
MWK 1740.999704
MXN 17.409297
MYR 3.975602
MZN 63.909783
NAD 16.657375
NGN 1372.340003
NIO 36.807704
NOK 9.27685
NPR 154.405487
NZD 1.715019
OMR 0.384502
PAB 1.000207
PEN 3.422764
PGK 4.42356
PHP 61.68903
PKR 278.560536
PLN 3.666498
PYG 6125.724515
QAR 3.645916
RON 4.510799
RSD 101.221953
RUB 71.199703
RWF 1462.799604
SAR 3.752456
SBD 8.032258
SCR 14.092342
SDG 600.477447
SEK 9.412295
SGD 1.281899
SHP 0.746601
SLE 24.613261
SLL 20969.502105
SOS 571.620366
SRD 37.227498
STD 20697.981008
STN 21.085063
SVC 8.751442
SYP 111.458438
SZL 16.702676
THB 32.739816
TJS 9.286861
TMT 3.5
TND 2.927516
TOP 2.40776
TRY 45.59312
TTD 6.780784
TWD 31.661975
TZS 2610.003025
UAH 44.17973
UGX 3771.214155
UYU 40.31911
UZS 12021.721544
VES 517.314502
VND 26363.5
VUV 118.295117
WST 2.706459
XAF 564.531176
XAG 0.013448
XAU 0.000224
XCD 2.70255
XCG 1.802644
XDR 0.702153
XOF 564.523888
XPF 102.636924
YER 238.649702
ZAR 16.709402
ZMK 9001.206174
ZMW 18.829392
ZWL 321.999592
  • CMSD

    -0.2100

    22.75

    -0.92%

  • JRI

    -0.2300

    12.47

    -1.84%

  • CMSC

    -0.1800

    22.8

    -0.79%

  • GSK

    0.7900

    51.05

    +1.55%

  • AZN

    0.7200

    184.64

    +0.39%

  • NGG

    0.3100

    84.15

    +0.37%

  • BTI

    -0.2900

    66.06

    -0.44%

  • RIO

    -2.4100

    100.92

    -2.39%

  • RBGPF

    0.7200

    63.23

    +1.14%

  • BCE

    0.1600

    23.98

    +0.67%

  • BP

    0.4500

    46.14

    +0.98%

  • RYCEF

    0.0600

    15.45

    +0.39%

  • VOD

    0.1500

    15.15

    +0.99%

  • RELX

    -0.3800

    33.58

    -1.13%

  • BCC

    -2.1300

    65.47

    -3.25%

Dateline Commences Music Valley Exploration Program
Dateline Commences Music Valley Exploration Program

Dateline Commences Music Valley Exploration Program

Fast tracked heavy rare earth program

Text size:

SAN BERNARDINO, CALIFORNIA / ACCESS Newswire / March 3, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) (Dateline or the Company) is pleased to announce it has commenced exploration activities at the newly acquired Music Valley HREE Project (Music Valley), located in Riverside County, California, USA.

As part of the Company's exploration program, a high-resolution helicopter-borne magnetic and radiometric survey will commence next week, covering Music Valley and the surrounding area to the north. These surveys are expected to aid in vectoring us into areas that contain the prospective Pinto Gneiss.

Additionally, REE expert, Tony Mariano Jr, and structural geologist, Dr Russell Mason, will arrive on site next week to commence mapping and rock chip sampling of the project area. Preliminary desktop analysis of USGS mapping has identified several areas for detailed inspection and sampling.

Dateline's Managing Director, Stephen Baghdadi, commented:

"We are not wasting a single day at Music Valley. Within days of completing the acquisition, we have mobilized airborne geophysics and assembled a specialist REE team on the ground. This is deliberate, disciplined and urgent execution.

"The United States urgently needs domestic sources of heavy rare earths. Dysprosium, terbium and yttrium are strategic materials, and secure supply is no longer optional, it is essential.

"Music Valley has the geological ingredients, and we will continue to move quickly and methodically to determine whether it can become part of that solution."

Music Valley Geophysical Survey

The Company has contacted Precision GeoSurveys to complete a 2,172 line kilometer magnetic and radiometric survey at Music Valley. The survey will cover the claims acquired from Fermi as well as prospective ground to the north and northeast.

The survey will be helicopter-borne, allowing a low level, high-resolution survey to be completed. The survey will be flown at a height of 30m and line spacing of 50m. The survey will commence next week and is expected to take 8-10 days to complete.

Mapping and Rock Chip Sampling

The Music Valley area contains a significant amount of outcrop. Geological mapping by the USGS, shown in Figure 1, highlights that significant portions of the project area are not overlain by transported material. A number of structural measurements are shown, indicating that outcropping geology is present and intact across the project area.

Figure 1: Music Valley Project overlain over the USGS Geologic Map of the Valley Mountain 15' Quadrangle

REE specialist, Tony Mariano Jr, and structural geologist, Dr Russell Mason, will head to Music Valley next week to commence a detailed rock chip sampling and geological mapping campaign. The focus of the program will be to develop a detailed geological model for the area and identify priority zones of Pinto Gneiss for sampling and follow-up.

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:

X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline owns 100% of the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

In February 2026, Dateline announced the acquisition of the Music Valley Heavy Rare Earth Project in Riverside County, California. The region has known HREE mineralisation from USGS rock chip sampling, however it has not been subjected to modern exploration techniques.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

J.P.Cortez--TFWP