The Fort Worth Press - Dateline Commences Music Valley Exploration Program

USD -
AED 3.672504
AFN 65.000368
ALL 81.216919
AMD 362.051328
ANG 1.789785
AOA 917.000367
ARS 1515.25437
AUD 1.435956
AWG 1.80125
AZN 1.70397
BAM 1.739803
BBD 2.01708
BDT 123.195303
BGN 1.747831
BHD 0.378775
BIF 2997.464751
BMD 1
BND 1.281146
BOB 11.69239
BRL 5.065104
BSD 1.001468
BTN 95.050483
BWP 13.720589
BYN 3.015879
BYR 19600
BZD 2.014233
CAD 1.41575
CDF 2313.50392
CHF 0.825932
CLF 0.024881
CLP 979.255437
CNY 6.691204
CNH 6.686704
COP 3173.953654
CRC 455.099408
CUC 1
CUP 24.035938
CVE 98.087444
CZK 21.645304
DJF 178.33919
DKK 6.651204
DOP 61.433083
DZD 133.824668
EGP 53.529689
ERN 15
ETB 163.585998
EUR 0.889904
FJD 2.26765
FKP 0.750253
GBP 0.752078
GEL 2.590391
GGP 0.750253
GHS 11.695058
GIP 0.750253
GMD 73.503851
GNF 8810.21216
GTQ 7.652004
GYD 209.527198
HKD 7.84815
HNL 26.885202
HRK 6.703804
HTG 131.147978
HUF 323.310388
IDR 18053
ILS 3.09465
IMP 0.750253
INR 94.965504
IQD 1518.213762
IRR 1795877.503816
ISK 121.180386
JEP 0.750253
JMD 159.195837
JOD 0.70904
JPY 158.01504
KES 130.098296
KGS 87.450384
KHR 4070.631144
KMF 440.00035
KPW 899.999961
KRW 1334.740383
KWD 0.31082
KYD 0.834586
KZT 453.195748
LAK 22534.359294
LBP 89683.40524
LKR 331.690611
LRD 170.751234
LSL 16.462394
LTL 2.95274
LVL 0.60489
LYD 6.431526
MAD 9.729662
MDL 17.966464
MGA 4507.405595
MKD 54.836988
MMK 2100.071343
MNT 3596.488264
MOP 8.096339
MRU 40.037362
MUR 47.230378
MVR 15.460378
MWK 1736.600987
MXN 18.492904
MYR 4.083204
MZN 63.903729
NAD 16.462394
NGN 1331.210377
NIO 36.854512
NOK 9.427704
NPR 152.081128
NZD 1.767253
OMR 0.382413
PAB 1.001468
PEN 3.444825
PGK 4.547436
PHP 62.986038
PKR 277.237468
PLN 3.88825
PYG 5719.877241
QAR 3.660721
RON 4.730604
RSD 104.461148
RUB 84.13468
RWF 1478.183516
SAR 3.752837
SBD 8.064647
SCR 13.905529
SDG 601.503676
SEK 9.912404
SGD 1.282104
SHP 0.754745
SLE 24.680371
SLL 20969.504398
SOS 572.343548
SRD 37.794504
STD 20697.981008
STN 21.794245
SVC 8.763065
SYP 13001.999685
SZL 16.455989
THB 33.445038
TJS 9.228751
TMT 3.51
TND 2.98768
TOP 2.40776
TRY 49.513804
TTD 6.798915
TWD 32.453604
TZS 2646.44398
UAH 44.920874
UGX 4136.458658
UYU 40.314905
UZS 12073.121914
VES 878.910604
VND 25894.5
VUV 119.385856
WST 2.787824
XAF 583.738825
XAG 0.017551
XAU 0.000240063761
XCD 2.70255
XCG 1.804919
XDR 0.707052
XOF 583.738825
XPF 106.089045
YER 236.150363
ZAR 16.494037
ZMK 9001.203584
ZMW 20.049815
ZWL 321.999592
SSP 5750.775019
MXV 2.088032
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Dateline Commences Music Valley Exploration Program
Dateline Commences Music Valley Exploration Program

Dateline Commences Music Valley Exploration Program

Fast tracked heavy rare earth program

Text size:

SAN BERNARDINO, CALIFORNIA / ACCESS Newswire / March 3, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) (Dateline or the Company) is pleased to announce it has commenced exploration activities at the newly acquired Music Valley HREE Project (Music Valley), located in Riverside County, California, USA.

As part of the Company's exploration program, a high-resolution helicopter-borne magnetic and radiometric survey will commence next week, covering Music Valley and the surrounding area to the north. These surveys are expected to aid in vectoring us into areas that contain the prospective Pinto Gneiss.

Additionally, REE expert, Tony Mariano Jr, and structural geologist, Dr Russell Mason, will arrive on site next week to commence mapping and rock chip sampling of the project area. Preliminary desktop analysis of USGS mapping has identified several areas for detailed inspection and sampling.

Dateline's Managing Director, Stephen Baghdadi, commented:

"We are not wasting a single day at Music Valley. Within days of completing the acquisition, we have mobilized airborne geophysics and assembled a specialist REE team on the ground. This is deliberate, disciplined and urgent execution.

"The United States urgently needs domestic sources of heavy rare earths. Dysprosium, terbium and yttrium are strategic materials, and secure supply is no longer optional, it is essential.

"Music Valley has the geological ingredients, and we will continue to move quickly and methodically to determine whether it can become part of that solution."

Music Valley Geophysical Survey

The Company has contacted Precision GeoSurveys to complete a 2,172 line kilometer magnetic and radiometric survey at Music Valley. The survey will cover the claims acquired from Fermi as well as prospective ground to the north and northeast.

The survey will be helicopter-borne, allowing a low level, high-resolution survey to be completed. The survey will be flown at a height of 30m and line spacing of 50m. The survey will commence next week and is expected to take 8-10 days to complete.

Mapping and Rock Chip Sampling

The Music Valley area contains a significant amount of outcrop. Geological mapping by the USGS, shown in Figure 1, highlights that significant portions of the project area are not overlain by transported material. A number of structural measurements are shown, indicating that outcropping geology is present and intact across the project area.

Figure 1: Music Valley Project overlain over the USGS Geologic Map of the Valley Mountain 15' Quadrangle

REE specialist, Tony Mariano Jr, and structural geologist, Dr Russell Mason, will head to Music Valley next week to commence a detailed rock chip sampling and geological mapping campaign. The focus of the program will be to develop a detailed geological model for the area and identify priority zones of Pinto Gneiss for sampling and follow-up.

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:

X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline owns 100% of the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

In February 2026, Dateline announced the acquisition of the Music Valley Heavy Rare Earth Project in Riverside County, California. The region has known HREE mineralisation from USGS rock chip sampling, however it has not been subjected to modern exploration techniques.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

J.P.Cortez--TFWP