The Fort Worth Press - Dateline Acquires U.S. High-Grade heavy Rare Earths Project

USD -
AED 3.672498
AFN 62.999771
ALL 82.06033
AMD 368.209824
ANG 1.79046
AOA 918.000234
ARS 1398.3059
AUD 1.407925
AWG 1.80225
AZN 1.699016
BAM 1.68319
BBD 2.014527
BDT 122.775311
BGN 1.66992
BHD 0.37725
BIF 2975
BMD 1
BND 1.281294
BOB 6.911598
BRL 5.048099
BSD 1.000207
BTN 96.503322
BWP 13.583201
BYN 2.726365
BYR 19600
BZD 2.011601
CAD 1.37603
CDF 2252.50468
CHF 0.789899
CLF 0.023008
CLP 905.540265
CNY 6.814996
CNH 6.812975
COP 3794.85
CRC 452.511274
CUC 1
CUP 26.5
CVE 95.374978
CZK 20.977021
DJF 177.720099
DKK 6.44407
DOP 58.850004
DZD 132.916201
EGP 53.144779
ERN 15
ETB 156.175858
EUR 0.862297
FJD 2.210309
FKP 0.745062
GBP 0.746925
GEL 2.670297
GGP 0.745062
GHS 11.444954
GIP 0.745062
GMD 73.000222
GNF 8777.502075
GTQ 7.625047
GYD 209.258494
HKD 7.832805
HNL 26.601892
HRK 6.501298
HTG 130.92646
HUF 312.251026
IDR 17690
ILS 2.924802
IMP 0.745062
INR 96.802399
IQD 1310.5
IRR 1320949.999726
ISK 123.649959
JEP 0.745062
JMD 158.241248
JOD 0.708987
JPY 158.981498
KES 129.450167
KGS 87.450149
KHR 4011.502436
KMF 424.000202
KPW 900.049483
KRW 1509.554984
KWD 0.309098
KYD 0.833513
KZT 471.023099
LAK 21949.999964
LBP 89550.000089
LKR 330.512012
LRD 183.275009
LSL 16.695805
LTL 2.95274
LVL 0.60489
LYD 6.359839
MAD 9.224586
MDL 17.303671
MGA 4196.357878
MKD 53.157908
MMK 2099.427985
MNT 3578.349826
MOP 8.069452
MRU 39.989635
MUR 47.409595
MVR 15.399066
MWK 1740.999704
MXN 17.409297
MYR 3.975602
MZN 63.909783
NAD 16.657375
NGN 1372.340003
NIO 36.807704
NOK 9.27685
NPR 154.405487
NZD 1.715019
OMR 0.384502
PAB 1.000207
PEN 3.422764
PGK 4.42356
PHP 61.68903
PKR 278.560536
PLN 3.666498
PYG 6125.724515
QAR 3.645916
RON 4.510799
RSD 101.221953
RUB 71.199703
RWF 1462.799604
SAR 3.752456
SBD 8.032258
SCR 14.092342
SDG 600.477447
SEK 9.412295
SGD 1.281899
SHP 0.746601
SLE 24.613261
SLL 20969.502105
SOS 571.620366
SRD 37.227498
STD 20697.981008
STN 21.085063
SVC 8.751442
SYP 111.458438
SZL 16.702676
THB 32.739816
TJS 9.286861
TMT 3.5
TND 2.927516
TOP 2.40776
TRY 45.59312
TTD 6.780784
TWD 31.661975
TZS 2610.003025
UAH 44.17973
UGX 3771.214155
UYU 40.31911
UZS 12021.721544
VES 517.314502
VND 26363.5
VUV 118.295117
WST 2.706459
XAF 564.531176
XAG 0.013448
XAU 0.000224
XCD 2.70255
XCG 1.802644
XDR 0.702153
XOF 564.523888
XPF 102.636924
YER 238.649702
ZAR 16.709402
ZMK 9001.206174
ZMW 18.829392
ZWL 321.999592
  • RBGPF

    0.7200

    63.23

    +1.14%

  • CMSC

    -0.1800

    22.8

    -0.79%

  • CMSD

    -0.2100

    22.75

    -0.92%

  • BTI

    -0.2900

    66.06

    -0.44%

  • BCE

    0.1600

    23.98

    +0.67%

  • GSK

    0.7900

    51.05

    +1.55%

  • BP

    0.4500

    46.14

    +0.98%

  • AZN

    0.7200

    184.64

    +0.39%

  • NGG

    0.3100

    84.15

    +0.37%

  • RIO

    -2.4100

    100.92

    -2.39%

  • RYCEF

    0.0600

    15.45

    +0.39%

  • JRI

    -0.2300

    12.47

    -1.84%

  • VOD

    0.1500

    15.15

    +0.99%

  • BCC

    -2.1300

    65.47

    -3.25%

  • RELX

    -0.3800

    33.58

    -1.13%

Dateline Acquires U.S. High-Grade heavy Rare Earths Project
Dateline Acquires U.S. High-Grade heavy Rare Earths Project

Dateline Acquires U.S. High-Grade heavy Rare Earths Project

SAN BERNARDINO, CA / ACCESS Newswire / February 27, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) (Dateline or the Company) is pleased to announce it has strategically acquired a new project, the Music Valley HREE Project (Music Valley), located in Riverside County, California, USA. Music Valley consists of 57 claims totaling 1,140 acres.

Text size:

Highlights

  • Music Valley heavy rare earths (HREE) acquisition: Dateline has secured the Music Valley HREE Project, comprising 57 claims over 1,140 acres in the Music Valley area of California.

  • HREE prospectivity: Historical United States Geological Survey (USGS) work describes HREE mineralization hosted in xenotime within the biotite-rich Pinto Gneiss, with a fractionated HREE signature.

  • Historical grades reported: USGS rock chip results reported 6.69%-15.04% TREO in the region, including high Yttrium and Dysprosium grades.

  • Rock Chip Sampling and Geophysics: The Company intends to undertake mapping, geochemistry and geophysics to define drill targets at Music Valley.

  • Strategic investment: As part of the acquisition terms, Dateline has completed a US$1.0 million investment in Fermi Critical Minerals Inc. (Fermi) intended to accelerate exploration across Fermi's uranium and rare earth portfolio.

  • Scale and pipeline leverage: Fermi has eight projects at different stages of exploration and development, with a pipeline of catalysts across uranium and REE projects in the United States.

Dateline's Managing Director, Stephen Baghdadi, commented:

"Music Valley gives Dateline direct exposure to heavy rare earth mineralization in California with historically reported high-grade TREO results and strong heavy rare earth enrichment.

"Our US$1 million investment in Fermi provides additional leverage to a substantial U.S. uranium and rare earth portfolio, including drill-permitted projects in Wyoming and Colorado.

"This transaction enhances Dateline's exposure to gold, uranium, light and heavy rare earths within the United States at a time when domestic supply chains are increasingly strategic."

Music Valley Heavy Rare Earths Project

The project is located approximately eight miles southeast of Twentynine Palms in Riverside County, California and covers the main geological units and drainages highlighted in historical USGS sampling programs.

Figure 1: Dateline Resources Project Location Plan, California

Strategic Significance

Rare Light rare earth elements (LREEs) such as neodymium and praseodymium are essential to high-performance permanent magnets used in electric vehicles, wind turbines and advanced motors. Heavy rare earth elements (HREEs) such as dysprosium and terbium enhance magnet strength and heat resistance and are critical to defence systems, advanced electronics and next-generation energy technologies, yet global production and processing remain heavily concentrated outside the United States.

With supply chain security now a national priority, HREEs represent a strategic gap in the U.S. critical minerals landscape. Through its California rare earth portfolio, including the Music Valley Heavy Rare Earth Project and the Colosseum, located near the Mountain Pass rare earths mine, Dateline is positioning itself to contribute to both LREE and HREE demand growth while supporting a more secure and diversified domestic supply chain.

Geological Setting

Rare earth mineralization in the broader Music Valley area was first identified in 1954 by USGS geologists. USGS mapping shows the Music Valley area is underlain by Proterozoic to Palaeozoic metasedimentary rocks intruded by granitic and alkaline igneous bodies. These units are overlain locally by Tertiary volcanic and sedimentary sequences. Faulting and fracturing are widespread and control fluid movement and mineral deposition.

USGS studies describe rare earth mineralisation associated with alkaline intrusive rocks, altered volcanic units, and reworked sedimentary materials. Heavy rare earth elements occur within accessory minerals such as xenotime, monazite, and other REE phosphates.

Figure 2: Music Valley Claims outline

USGS Rock Chip and Sample Results

USGS rock chip and sediment sampling across Music Valley returned anomalous total rare earth element values with elevated proportions of heavy rare earths1. Several samples reported enrichment in dysprosium, terbium, yttrium, and ytterbium relative to light rare earth elements. The geochemical signature reflects fractionated rare earth systems consistent with heavy rare earth dominant mineralisation.

Table 1: USGS rock chip sampling results from Pinto Gneiss in the region1

Element

Concentration (wt percent)

Stoichiometric Equivalent (%)1

Yttrium

3.50 - 8.80% Y

4.44 - 11.18% Y2O3

Lanthanum

0.26 - 0.34% La

0.30 - 0.40% La2O3

Cerium

0.47 - 0.94% Ce

0.55 - 1.10% CeO2

Neodymium

0.24 - 0.41% Nd

0.28 - 0.48% Nd2O3

Dysprosium

0.22 - 0.41% Dy

0.25 - 0.47% Dy2O3

Ytterbium

0.46 - 0.75% Yb

0.52 - 0.85% Yb2O3

Thorium

0.31 - 0.49% Th

0.35 - 0.56% ThO2

TOTAL

6.69 - 15.04% TREO

  1. Stoichiometric oxide equivalent calculated by multiplying the wt% of the element by the relevant conversion factor

  2. Sample locations not specified

1 Evans, J.R., 1964, Xenotime mineralization in the southern Music Valley area, Riverside County, California: California Division of Mines and Geology Special Report 79, 24 p.

Exploration Rationale

Dateline's exploration model for the Music Valley HREE Project focuses on:

  • Documented heavy rare earth enrichment from USGS sampling,

  • Favourable alkaline and altered host rocks,

  • Structural controls which concentrate mineralised fluids and sediments, and

  • Potential for near surface mineralisation.

Planned Work

In order to build up a 'stacked evidence' model prior to drilling, the initial work programs will include:

  • Detailed geological mapping,

  • Confirmatory rock chip and soil sampling,

  • Review and integration of historical USGS datasets, and

  • Geophysical surveys to define subsurface targets.

Dateline considers the Music Valley area to be highly prospective and is working to expand the project area through further acquisitions and/or claim staking.

The planned work program at the Music Valley Project will be funded from the existing cash balance of over $53M.

Strategic investment in Fermi Critical Minerals Inc.

As part of the acquisition terms of the Music Valley HREE Project, Dateline has completed a US$1.0 million strategic equity investment in Fermi. Fermi is raising a total of US$4 million from investors. On completion of the capital raise by Fermi, Dateline will own four million shares out of a total of approximately 45 million shares on issue. Fermi intends to use the funds to accelerate exploration across its U.S. mining portfolio, including drilling on priority uranium targets, additional geophysical surveys, systematic sampling on rare earth properties, technical/modelling work and working capital/regulatory advancement.

Further details on the Fermi project portfolio can be found at https://fermiuranium.com/

Transaction Summary - Total outlay of US$1.05M

Component

What Dateline secured

Key attributes

Music Valley HREE Project (California)

100% of the Music Valley claim package

57 claims; 1,140 acres; HREE prospectivity; xenotime-hosted mineralization within Pinto Gneiss; historical USGS results reported up to 15.04% TREO

Strategic equity investment in Fermi Critical Minerals Inc.

(U.S. uranium & REE portfolio)

4 million Fully Paid Ordinary shares in Fermi, exposure to a multi-asset project portfolio

Eight projects 785 federal claims; 11 Wyoming State leases; drill-permitted/near-permitted assets including New Fork Valley & Pitchfork

Additional Gold Upside Potential

The Music Valley area was also historically mined for gold, with dozens of small-scale adits and shafts developed in the area. Most of this activity occurred prior to 1920 so there is only limited information available with regards to tonnes and grade. Whilst rare earths will be the primary target at Music Valley, mapping, rock chip sampling and geochemistry will also assess the gold potential of the region.

Figure 3 shows the historic gold prospects in the Mindat database.

Figure 3: Historical Gold Prospects (source mindat.org)

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline owns 100% of the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

In February 2026, Dateline announced the acquisition of the Music Valley Heavy Rare Earth Project in Riverside County, California. The region has known HREE mineralisation from USGS rock chip sampling, however it has not been subjected to modern exploration techniques.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

L.Holland--TFWP