The Fort Worth Press - Dateline Acquires U.S. High-Grade heavy Rare Earths Project

USD -
AED 3.672504
AFN 64.000368
ALL 82.099008
AMD 367.63228
ANG 1.790403
AOA 917.503981
ARS 1492.901385
AUD 1.443002
AWG 1.8025
AZN 1.70397
BAM 1.709092
BBD 2.014681
BDT 123.336392
BGN 1.69088
BHD 0.377157
BIF 2975.313497
BMD 1
BND 1.290864
BOB 6.927077
BRL 5.170399
BSD 1.000306
BTN 95.296893
BWP 13.491502
BYN 2.902259
BYR 19600
BZD 2.011797
CAD 1.41995
CDF 2246.000362
CHF 0.803085
CLF 0.023434
CLP 925.617163
CNY 6.789104
CNH 6.785505
COP 3363.656224
CRC 455.717219
CUC 1
CUP 26.5
CVE 96.35601
CZK 21.144704
DJF 178.127321
DKK 6.535604
DOP 59.256346
DZD 133.361297
EGP 49.283873
ERN 15
ETB 160.4018
EUR 0.873904
FJD 2.26045
FKP 0.748732
GBP 0.748727
GEL 2.63504
GGP 0.748732
GHS 11.363656
GIP 0.748732
GMD 72.503851
GNF 8772.665705
GTQ 7.634028
GYD 209.236685
HKD 7.84465
HNL 26.773277
HRK 6.587504
HTG 130.834098
HUF 308.910388
IDR 17994.4
ILS 2.99865
IMP 0.748732
INR 95.215504
IQD 1310.350854
IRR 1375950.000352
ISK 125.920386
JEP 0.748732
JMD 158.351903
JOD 0.70904
JPY 161.370385
KES 129.3398
KGS 87.447704
KHR 4005.767466
KMF 431.00035
KPW 900.00035
KRW 1528.775039
KWD 0.31029
KYD 0.833661
KZT 473.045834
LAK 22586.621226
LBP 89575.392144
LKR 335.046096
LRD 181.552847
LSL 16.224931
LTL 2.95274
LVL 0.60489
LYD 6.4115
MAD 9.354393
MDL 17.595141
MGA 4240.835409
MKD 53.86027
MMK 2099.691108
MNT 3584.859602
MOP 8.08057
MRU 39.921353
MUR 47.050378
MVR 15.460378
MWK 1734.609167
MXN 17.469104
MYR 4.071039
MZN 63.910377
NAD 16.224931
NGN 1370.080377
NIO 36.806921
NOK 9.841039
NPR 152.475204
NZD 1.752235
OMR 0.385704
PAB 1.000306
PEN 3.403766
PGK 4.394635
PHP 61.501038
PKR 278.103989
PLN 3.75205
PYG 6082.055315
QAR 3.656661
RON 4.568038
RSD 102.570892
RUB 77.145891
RWF 1464.412112
SAR 3.748374
SBD 8.058541
SCR 13.46616
SDG 600.503676
SEK 9.65806
SGD 1.291404
SHP 0.746601
SLE 24.350371
SLL 20969.503664
SOS 571.678245
SRD 37.566038
STD 20697.981008
STN 21.409534
SVC 8.752567
SYP 110.532098
SZL 16.22231
THB 33.325038
TJS 9.2726
TMT 3.51
TND 2.952244
TOP 2.40776
TRY 46.767504
TTD 6.779394
TWD 31.938038
TZS 2626.818718
UAH 44.550181
UGX 3650.980906
UYU 40.232446
UZS 11983.221916
VES 638.90327
VND 26296
VUV 119.804122
WST 2.773179
XAF 573.213615
XAG 0.016021
XAU 0.00024
XCD 2.70255
XCG 1.80277
XDR 0.712894
XOF 573.213615
XPF 104.216367
YER 237.050363
ZAR 16.231504
ZMK 9001.203584
ZMW 18.379866
ZWL 321.999592
  • CMSC

    0.0400

    21.99

    +0.18%

  • CMSD

    -0.0300

    22.15

    -0.14%

  • NGG

    2.6700

    82.85

    +3.22%

  • BTI

    1.2100

    61.77

    +1.96%

  • RIO

    1.0700

    94.42

    +1.13%

  • AZN

    11.2900

    195.15

    +5.79%

  • RYCEF

    0.5400

    19.68

    +2.74%

  • RBGPF

    2.5400

    68.15

    +3.73%

  • BCE

    0.4000

    21.42

    +1.87%

  • BCC

    0.4500

    75.93

    +0.59%

  • GSK

    2.3600

    53.66

    +4.4%

  • RELX

    0.5500

    31.93

    +1.72%

  • JRI

    0.0600

    13

    +0.46%

  • VOD

    0.1400

    13.15

    +1.06%

  • BP

    1.2500

    37.4

    +3.34%

Dateline Acquires U.S. High-Grade heavy Rare Earths Project
Dateline Acquires U.S. High-Grade heavy Rare Earths Project

Dateline Acquires U.S. High-Grade heavy Rare Earths Project

SAN BERNARDINO, CA / ACCESS Newswire / February 27, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) (Dateline or the Company) is pleased to announce it has strategically acquired a new project, the Music Valley HREE Project (Music Valley), located in Riverside County, California, USA. Music Valley consists of 57 claims totaling 1,140 acres.

Text size:

Highlights

  • Music Valley heavy rare earths (HREE) acquisition: Dateline has secured the Music Valley HREE Project, comprising 57 claims over 1,140 acres in the Music Valley area of California.

  • HREE prospectivity: Historical United States Geological Survey (USGS) work describes HREE mineralization hosted in xenotime within the biotite-rich Pinto Gneiss, with a fractionated HREE signature.

  • Historical grades reported: USGS rock chip results reported 6.69%-15.04% TREO in the region, including high Yttrium and Dysprosium grades.

  • Rock Chip Sampling and Geophysics: The Company intends to undertake mapping, geochemistry and geophysics to define drill targets at Music Valley.

  • Strategic investment: As part of the acquisition terms, Dateline has completed a US$1.0 million investment in Fermi Critical Minerals Inc. (Fermi) intended to accelerate exploration across Fermi's uranium and rare earth portfolio.

  • Scale and pipeline leverage: Fermi has eight projects at different stages of exploration and development, with a pipeline of catalysts across uranium and REE projects in the United States.

Dateline's Managing Director, Stephen Baghdadi, commented:

"Music Valley gives Dateline direct exposure to heavy rare earth mineralization in California with historically reported high-grade TREO results and strong heavy rare earth enrichment.

"Our US$1 million investment in Fermi provides additional leverage to a substantial U.S. uranium and rare earth portfolio, including drill-permitted projects in Wyoming and Colorado.

"This transaction enhances Dateline's exposure to gold, uranium, light and heavy rare earths within the United States at a time when domestic supply chains are increasingly strategic."

Music Valley Heavy Rare Earths Project

The project is located approximately eight miles southeast of Twentynine Palms in Riverside County, California and covers the main geological units and drainages highlighted in historical USGS sampling programs.

Figure 1: Dateline Resources Project Location Plan, California

Strategic Significance

Rare Light rare earth elements (LREEs) such as neodymium and praseodymium are essential to high-performance permanent magnets used in electric vehicles, wind turbines and advanced motors. Heavy rare earth elements (HREEs) such as dysprosium and terbium enhance magnet strength and heat resistance and are critical to defence systems, advanced electronics and next-generation energy technologies, yet global production and processing remain heavily concentrated outside the United States.

With supply chain security now a national priority, HREEs represent a strategic gap in the U.S. critical minerals landscape. Through its California rare earth portfolio, including the Music Valley Heavy Rare Earth Project and the Colosseum, located near the Mountain Pass rare earths mine, Dateline is positioning itself to contribute to both LREE and HREE demand growth while supporting a more secure and diversified domestic supply chain.

Geological Setting

Rare earth mineralization in the broader Music Valley area was first identified in 1954 by USGS geologists. USGS mapping shows the Music Valley area is underlain by Proterozoic to Palaeozoic metasedimentary rocks intruded by granitic and alkaline igneous bodies. These units are overlain locally by Tertiary volcanic and sedimentary sequences. Faulting and fracturing are widespread and control fluid movement and mineral deposition.

USGS studies describe rare earth mineralisation associated with alkaline intrusive rocks, altered volcanic units, and reworked sedimentary materials. Heavy rare earth elements occur within accessory minerals such as xenotime, monazite, and other REE phosphates.

Figure 2: Music Valley Claims outline

USGS Rock Chip and Sample Results

USGS rock chip and sediment sampling across Music Valley returned anomalous total rare earth element values with elevated proportions of heavy rare earths1. Several samples reported enrichment in dysprosium, terbium, yttrium, and ytterbium relative to light rare earth elements. The geochemical signature reflects fractionated rare earth systems consistent with heavy rare earth dominant mineralisation.

Table 1: USGS rock chip sampling results from Pinto Gneiss in the region1

Element

Concentration (wt percent)

Stoichiometric Equivalent (%)1

Yttrium

3.50 - 8.80% Y

4.44 - 11.18% Y2O3

Lanthanum

0.26 - 0.34% La

0.30 - 0.40% La2O3

Cerium

0.47 - 0.94% Ce

0.55 - 1.10% CeO2

Neodymium

0.24 - 0.41% Nd

0.28 - 0.48% Nd2O3

Dysprosium

0.22 - 0.41% Dy

0.25 - 0.47% Dy2O3

Ytterbium

0.46 - 0.75% Yb

0.52 - 0.85% Yb2O3

Thorium

0.31 - 0.49% Th

0.35 - 0.56% ThO2

TOTAL

6.69 - 15.04% TREO

  1. Stoichiometric oxide equivalent calculated by multiplying the wt% of the element by the relevant conversion factor

  2. Sample locations not specified

1 Evans, J.R., 1964, Xenotime mineralization in the southern Music Valley area, Riverside County, California: California Division of Mines and Geology Special Report 79, 24 p.

Exploration Rationale

Dateline's exploration model for the Music Valley HREE Project focuses on:

  • Documented heavy rare earth enrichment from USGS sampling,

  • Favourable alkaline and altered host rocks,

  • Structural controls which concentrate mineralised fluids and sediments, and

  • Potential for near surface mineralisation.

Planned Work

In order to build up a 'stacked evidence' model prior to drilling, the initial work programs will include:

  • Detailed geological mapping,

  • Confirmatory rock chip and soil sampling,

  • Review and integration of historical USGS datasets, and

  • Geophysical surveys to define subsurface targets.

Dateline considers the Music Valley area to be highly prospective and is working to expand the project area through further acquisitions and/or claim staking.

The planned work program at the Music Valley Project will be funded from the existing cash balance of over $53M.

Strategic investment in Fermi Critical Minerals Inc.

As part of the acquisition terms of the Music Valley HREE Project, Dateline has completed a US$1.0 million strategic equity investment in Fermi. Fermi is raising a total of US$4 million from investors. On completion of the capital raise by Fermi, Dateline will own four million shares out of a total of approximately 45 million shares on issue. Fermi intends to use the funds to accelerate exploration across its U.S. mining portfolio, including drilling on priority uranium targets, additional geophysical surveys, systematic sampling on rare earth properties, technical/modelling work and working capital/regulatory advancement.

Further details on the Fermi project portfolio can be found at https://fermiuranium.com/

Transaction Summary - Total outlay of US$1.05M

Component

What Dateline secured

Key attributes

Music Valley HREE Project (California)

100% of the Music Valley claim package

57 claims; 1,140 acres; HREE prospectivity; xenotime-hosted mineralization within Pinto Gneiss; historical USGS results reported up to 15.04% TREO

Strategic equity investment in Fermi Critical Minerals Inc.

(U.S. uranium & REE portfolio)

4 million Fully Paid Ordinary shares in Fermi, exposure to a multi-asset project portfolio

Eight projects 785 federal claims; 11 Wyoming State leases; drill-permitted/near-permitted assets including New Fork Valley & Pitchfork

Additional Gold Upside Potential

The Music Valley area was also historically mined for gold, with dozens of small-scale adits and shafts developed in the area. Most of this activity occurred prior to 1920 so there is only limited information available with regards to tonnes and grade. Whilst rare earths will be the primary target at Music Valley, mapping, rock chip sampling and geochemistry will also assess the gold potential of the region.

Figure 3 shows the historic gold prospects in the Mindat database.

Figure 3: Historical Gold Prospects (source mindat.org)

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline owns 100% of the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

In February 2026, Dateline announced the acquisition of the Music Valley Heavy Rare Earth Project in Riverside County, California. The region has known HREE mineralisation from USGS rock chip sampling, however it has not been subjected to modern exploration techniques.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

L.Holland--TFWP