The Fort Worth Press - Dateline Acquires U.S. High-Grade heavy Rare Earths Project

USD -
AED 3.672495
AFN 63.501471
ALL 83.072963
AMD 375.623475
ANG 1.790083
AOA 917.00026
ARS 1390.220498
AUD 1.447534
AWG 1.8
AZN 1.70702
BAM 1.695072
BBD 2.009612
BDT 122.428639
BGN 1.709309
BHD 0.377609
BIF 2964.709145
BMD 1
BND 1.2851
BOB 6.894519
BRL 5.157597
BSD 0.997742
BTN 92.939509
BWP 13.688562
BYN 2.956504
BYR 19600
BZD 2.006665
CAD 1.39245
CDF 2296.000206
CHF 0.798503
CLF 0.023224
CLP 917.000289
CNY 6.885601
CNH 6.883785
COP 3662.46
CRC 464.279833
CUC 1
CUP 26.5
CVE 95.56558
CZK 21.243197
DJF 177.673004
DKK 6.47623
DOP 60.312178
DZD 133.062353
EGP 54.2572
ERN 15
ETB 155.800822
EUR 0.866597
FJD 2.253795
FKP 0.750158
GBP 0.755625
GEL 2.685051
GGP 0.750158
GHS 10.970563
GIP 0.750158
GMD 74.000249
GNF 8752.513347
GTQ 7.632939
GYD 208.828972
HKD 7.83835
HNL 26.504427
HRK 6.530905
HTG 130.952897
HUF 333.138986
IDR 16998
ILS 3.136798
IMP 0.750158
INR 92.598303
IQD 1307.141959
IRR 1319125.000189
ISK 125.149716
JEP 0.750158
JMD 157.303566
JOD 0.708984
JPY 159.617504
KES 129.794813
KGS 87.448802
KHR 3990.137323
KMF 426.999768
KPW 899.994443
KRW 1507.020477
KWD 0.30934
KYD 0.831502
KZT 472.805432
LAK 21970.392969
LBP 89502.03926
LKR 314.804623
LRD 183.088277
LSL 16.955078
LTL 2.95274
LVL 0.60489
LYD 6.380628
MAD 9.374033
MDL 17.55613
MGA 4171.343141
MKD 53.422776
MMK 2099.621061
MNT 3572.314592
MOP 8.055104
MRU 39.637211
MUR 46.940105
MVR 15.460021
MWK 1730.071718
MXN 17.856596
MYR 4.033014
MZN 63.950312
NAD 16.954711
NGN 1378.25967
NIO 36.712196
NOK 9.734315
NPR 148.701282
NZD 1.75133
OMR 0.384545
PAB 0.997734
PEN 3.45194
PGK 4.316042
PHP 60.464505
PKR 278.39991
PLN 3.70718
PYG 6454.29687
QAR 3.638018
RON 4.417499
RSD 101.772347
RUB 80.207393
RWF 1457.240049
SAR 3.754249
SBD 8.038772
SCR 14.425806
SDG 601.000172
SEK 9.43173
SGD 1.28546
SHP 0.750259
SLE 24.650044
SLL 20969.510825
SOS 570.192924
SRD 37.35103
STD 20697.981008
STN 21.233539
SVC 8.730169
SYP 110.548921
SZL 16.948198
THB 32.646041
TJS 9.563492
TMT 3.51
TND 2.941459
TOP 2.40776
TRY 44.5833
TTD 6.768937
TWD 31.972943
TZS 2600.000206
UAH 43.698134
UGX 3743.234401
UYU 40.405091
UZS 12122.393971
VES 473.390498
VND 26342.5
VUV 120.132513
WST 2.770875
XAF 568.506489
XAG 0.013691
XAU 0.000214
XCD 2.70255
XCG 1.798209
XDR 0.70704
XOF 568.516344
XPF 103.361457
YER 238.65028
ZAR 16.94973
ZMK 9001.198572
ZMW 19.281421
ZWL 321.999592
  • RBGPF

    -13.5000

    69

    -19.57%

  • CMSD

    0.1100

    22.26

    +0.49%

  • BCC

    -1.8800

    73.2

    -2.57%

  • NGG

    1.1500

    87.99

    +1.31%

  • JRI

    0.0900

    12.61

    +0.71%

  • GSK

    0.7000

    56.69

    +1.23%

  • BCE

    -0.9300

    24.45

    -3.8%

  • RYCEF

    0.9000

    15.99

    +5.63%

  • CMSC

    0.0500

    22.04

    +0.23%

  • RELX

    0.3600

    33.59

    +1.07%

  • AZN

    2.7600

    203.49

    +1.36%

  • VOD

    0.0800

    15.21

    +0.53%

  • RIO

    -0.3600

    94.45

    -0.38%

  • BTI

    0.3900

    58.28

    +0.67%

  • BP

    0.9500

    47.12

    +2.02%

Dateline Acquires U.S. High-Grade heavy Rare Earths Project
Dateline Acquires U.S. High-Grade heavy Rare Earths Project

Dateline Acquires U.S. High-Grade heavy Rare Earths Project

SAN BERNARDINO, CA / ACCESS Newswire / February 27, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) (Dateline or the Company) is pleased to announce it has strategically acquired a new project, the Music Valley HREE Project (Music Valley), located in Riverside County, California, USA. Music Valley consists of 57 claims totaling 1,140 acres.

Text size:

Highlights

  • Music Valley heavy rare earths (HREE) acquisition: Dateline has secured the Music Valley HREE Project, comprising 57 claims over 1,140 acres in the Music Valley area of California.

  • HREE prospectivity: Historical United States Geological Survey (USGS) work describes HREE mineralization hosted in xenotime within the biotite-rich Pinto Gneiss, with a fractionated HREE signature.

  • Historical grades reported: USGS rock chip results reported 6.69%-15.04% TREO in the region, including high Yttrium and Dysprosium grades.

  • Rock Chip Sampling and Geophysics: The Company intends to undertake mapping, geochemistry and geophysics to define drill targets at Music Valley.

  • Strategic investment: As part of the acquisition terms, Dateline has completed a US$1.0 million investment in Fermi Critical Minerals Inc. (Fermi) intended to accelerate exploration across Fermi's uranium and rare earth portfolio.

  • Scale and pipeline leverage: Fermi has eight projects at different stages of exploration and development, with a pipeline of catalysts across uranium and REE projects in the United States.

Dateline's Managing Director, Stephen Baghdadi, commented:

"Music Valley gives Dateline direct exposure to heavy rare earth mineralization in California with historically reported high-grade TREO results and strong heavy rare earth enrichment.

"Our US$1 million investment in Fermi provides additional leverage to a substantial U.S. uranium and rare earth portfolio, including drill-permitted projects in Wyoming and Colorado.

"This transaction enhances Dateline's exposure to gold, uranium, light and heavy rare earths within the United States at a time when domestic supply chains are increasingly strategic."

Music Valley Heavy Rare Earths Project

The project is located approximately eight miles southeast of Twentynine Palms in Riverside County, California and covers the main geological units and drainages highlighted in historical USGS sampling programs.

Figure 1: Dateline Resources Project Location Plan, California

Strategic Significance

Rare Light rare earth elements (LREEs) such as neodymium and praseodymium are essential to high-performance permanent magnets used in electric vehicles, wind turbines and advanced motors. Heavy rare earth elements (HREEs) such as dysprosium and terbium enhance magnet strength and heat resistance and are critical to defence systems, advanced electronics and next-generation energy technologies, yet global production and processing remain heavily concentrated outside the United States.

With supply chain security now a national priority, HREEs represent a strategic gap in the U.S. critical minerals landscape. Through its California rare earth portfolio, including the Music Valley Heavy Rare Earth Project and the Colosseum, located near the Mountain Pass rare earths mine, Dateline is positioning itself to contribute to both LREE and HREE demand growth while supporting a more secure and diversified domestic supply chain.

Geological Setting

Rare earth mineralization in the broader Music Valley area was first identified in 1954 by USGS geologists. USGS mapping shows the Music Valley area is underlain by Proterozoic to Palaeozoic metasedimentary rocks intruded by granitic and alkaline igneous bodies. These units are overlain locally by Tertiary volcanic and sedimentary sequences. Faulting and fracturing are widespread and control fluid movement and mineral deposition.

USGS studies describe rare earth mineralisation associated with alkaline intrusive rocks, altered volcanic units, and reworked sedimentary materials. Heavy rare earth elements occur within accessory minerals such as xenotime, monazite, and other REE phosphates.

Figure 2: Music Valley Claims outline

USGS Rock Chip and Sample Results

USGS rock chip and sediment sampling across Music Valley returned anomalous total rare earth element values with elevated proportions of heavy rare earths1. Several samples reported enrichment in dysprosium, terbium, yttrium, and ytterbium relative to light rare earth elements. The geochemical signature reflects fractionated rare earth systems consistent with heavy rare earth dominant mineralisation.

Table 1: USGS rock chip sampling results from Pinto Gneiss in the region1

Element

Concentration (wt percent)

Stoichiometric Equivalent (%)1

Yttrium

3.50 - 8.80% Y

4.44 - 11.18% Y2O3

Lanthanum

0.26 - 0.34% La

0.30 - 0.40% La2O3

Cerium

0.47 - 0.94% Ce

0.55 - 1.10% CeO2

Neodymium

0.24 - 0.41% Nd

0.28 - 0.48% Nd2O3

Dysprosium

0.22 - 0.41% Dy

0.25 - 0.47% Dy2O3

Ytterbium

0.46 - 0.75% Yb

0.52 - 0.85% Yb2O3

Thorium

0.31 - 0.49% Th

0.35 - 0.56% ThO2

TOTAL

6.69 - 15.04% TREO

  1. Stoichiometric oxide equivalent calculated by multiplying the wt% of the element by the relevant conversion factor

  2. Sample locations not specified

1 Evans, J.R., 1964, Xenotime mineralization in the southern Music Valley area, Riverside County, California: California Division of Mines and Geology Special Report 79, 24 p.

Exploration Rationale

Dateline's exploration model for the Music Valley HREE Project focuses on:

  • Documented heavy rare earth enrichment from USGS sampling,

  • Favourable alkaline and altered host rocks,

  • Structural controls which concentrate mineralised fluids and sediments, and

  • Potential for near surface mineralisation.

Planned Work

In order to build up a 'stacked evidence' model prior to drilling, the initial work programs will include:

  • Detailed geological mapping,

  • Confirmatory rock chip and soil sampling,

  • Review and integration of historical USGS datasets, and

  • Geophysical surveys to define subsurface targets.

Dateline considers the Music Valley area to be highly prospective and is working to expand the project area through further acquisitions and/or claim staking.

The planned work program at the Music Valley Project will be funded from the existing cash balance of over $53M.

Strategic investment in Fermi Critical Minerals Inc.

As part of the acquisition terms of the Music Valley HREE Project, Dateline has completed a US$1.0 million strategic equity investment in Fermi. Fermi is raising a total of US$4 million from investors. On completion of the capital raise by Fermi, Dateline will own four million shares out of a total of approximately 45 million shares on issue. Fermi intends to use the funds to accelerate exploration across its U.S. mining portfolio, including drilling on priority uranium targets, additional geophysical surveys, systematic sampling on rare earth properties, technical/modelling work and working capital/regulatory advancement.

Further details on the Fermi project portfolio can be found at https://fermiuranium.com/

Transaction Summary - Total outlay of US$1.05M

Component

What Dateline secured

Key attributes

Music Valley HREE Project (California)

100% of the Music Valley claim package

57 claims; 1,140 acres; HREE prospectivity; xenotime-hosted mineralization within Pinto Gneiss; historical USGS results reported up to 15.04% TREO

Strategic equity investment in Fermi Critical Minerals Inc.

(U.S. uranium & REE portfolio)

4 million Fully Paid Ordinary shares in Fermi, exposure to a multi-asset project portfolio

Eight projects 785 federal claims; 11 Wyoming State leases; drill-permitted/near-permitted assets including New Fork Valley & Pitchfork

Additional Gold Upside Potential

The Music Valley area was also historically mined for gold, with dozens of small-scale adits and shafts developed in the area. Most of this activity occurred prior to 1920 so there is only limited information available with regards to tonnes and grade. Whilst rare earths will be the primary target at Music Valley, mapping, rock chip sampling and geochemistry will also assess the gold potential of the region.

Figure 3 shows the historic gold prospects in the Mindat database.

Figure 3: Historical Gold Prospects (source mindat.org)

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline owns 100% of the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

In February 2026, Dateline announced the acquisition of the Music Valley Heavy Rare Earth Project in Riverside County, California. The region has known HREE mineralisation from USGS rock chip sampling, however it has not been subjected to modern exploration techniques.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

L.Holland--TFWP