The Fort Worth Press - Dateline Acquires U.S. High-Grade heavy Rare Earths Project

USD -
AED 3.672496
AFN 65.999806
ALL 80.065663
AMD 364.508186
ANG 1.789783
AOA 917.00022
ARS 1494.993551
AUD 1.414697
AWG 1.8
AZN 1.701613
BAM 1.689756
BBD 2.014385
BDT 122.018757
BGN 1.696366
BHD 0.377122
BIF 2988.381635
BMD 1
BND 1.277847
BOB 11.57636
BRL 5.2128
BSD 1.000151
BTN 95.647328
BWP 13.500659
BYN 3.042032
BYR 19600
BZD 2.011491
CAD 1.38791
CDF 2270.000115
CHF 0.810845
CLF 0.023463
CLP 923.440076
CNY 6.743299
CNH 6.741275
COP 3104.88
CRC 449.263467
CUC 1
CUP 26.5
CVE 95.26422
CZK 20.87201
DJF 178.102253
DKK 6.44984
DOP 58.749838
DZD 132.909333
EGP 50.536797
ERN 15
ETB 161.789969
EUR 0.86277
FJD 2.210497
FKP 0.738395
GBP 0.738265
GEL 2.605005
GGP 0.738395
GHS 11.051977
GIP 0.738395
GMD 73.999672
GNF 8785.692687
GTQ 7.628839
GYD 209.246268
HKD 7.84389
HNL 26.815845
HRK 6.501403
HTG 130.826022
HUF 315.642037
IDR 17830
ILS 2.99085
IMP 0.738395
INR 95.707199
IQD 1310.230424
IRR 1374575.000079
ISK 122.690146
JEP 0.738395
JMD 158.034569
JOD 0.709008
JPY 159.236503
KES 129.4971
KGS 87.449576
KHR 4046.085458
KMF 426.000436
KPW 900.000294
KRW 1397.419776
KWD 0.30879
KYD 0.83347
KZT 461.929241
LAK 22540.358638
LBP 89562.572897
LKR 331.975446
LRD 181.52836
LSL 16.225328
LTL 2.95274
LVL 0.60489
LYD 6.372767
MAD 9.292836
MDL 17.252581
MGA 4307.838521
MKD 53.155873
MMK 2099.245957
MNT 3597.150887
MOP 8.080143
MRU 40.111452
MUR 46.979692
MVR 15.45959
MWK 1734.310807
MXN 17.05922
MYR 4.063021
MZN 63.904984
NAD 16.225258
NGN 1350.239844
NIO 36.798687
NOK 9.401945
NPR 153.035552
NZD 1.703305
OMR 0.3845
PAB 1.000134
PEN 3.368483
PGK 4.494363
PHP 61.827039
PKR 277.569951
PLN 3.732885
PYG 6034.084282
QAR 3.655881
RON 4.523599
RSD 101.201289
RUB 84.90037
RWF 1473.727865
SAR 3.746587
SBD 8.025811
SCR 13.860891
SDG 601.474966
SEK 9.52765
SGD 1.276725
SHP 0.740866
SLE 24.649879
SLL 20969.499227
SOS 571.623589
SRD 37.966977
STD 20697.981008
STN 21.167221
SVC 8.751096
SYP 13001.999906
SZL 16.213578
THB 33.127958
TJS 9.241263
TMT 3.5
TND 2.929025
TOP 2.40776
TRY 47.931603
TTD 6.782238
TWD 31.901398
TZS 2647.976038
UAH 44.802989
UGX 3730.646945
UYU 40.347315
UZS 11821.830168
VES 771.57685
VND 26178
VUV 118.215486
WST 2.715898
XAF 566.748027
XAG 0.015938
XAU 0.00023
XCD 2.70255
XCG 1.802528
XDR 0.707052
XOF 566.738234
XPF 103.038184
YER 237.10406
ZAR 16.25505
ZMK 9001.202246
ZMW 18.677668
ZWL 321.999592
  • CMSC

    -0.1200

    21.24

    -0.56%

  • RYCEF

    -0.2500

    20.81

    -1.2%

  • RBGPF

    0.3500

    69

    +0.51%

  • CMSD

    -0.0900

    21.09

    -0.43%

  • BCE

    0.0100

    23.36

    +0.04%

  • NGG

    0.8600

    82.15

    +1.05%

  • VOD

    -0.0700

    16.13

    -0.43%

  • GSK

    0.8700

    51.15

    +1.7%

  • BTI

    0.6500

    56.38

    +1.15%

  • RIO

    -0.5200

    96.69

    -0.54%

  • AZN

    3.2100

    160.1

    +2%

  • BCC

    -1.7600

    80.18

    -2.2%

  • RELX

    0.9500

    34.51

    +2.75%

  • BP

    0.5600

    43.41

    +1.29%

  • JRI

    -0.0400

    12.44

    -0.32%

Dateline Acquires U.S. High-Grade heavy Rare Earths Project
Dateline Acquires U.S. High-Grade heavy Rare Earths Project

Dateline Acquires U.S. High-Grade heavy Rare Earths Project

SAN BERNARDINO, CA / ACCESS Newswire / February 27, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) (Dateline or the Company) is pleased to announce it has strategically acquired a new project, the Music Valley HREE Project (Music Valley), located in Riverside County, California, USA. Music Valley consists of 57 claims totaling 1,140 acres.

Text size:

Highlights

  • Music Valley heavy rare earths (HREE) acquisition: Dateline has secured the Music Valley HREE Project, comprising 57 claims over 1,140 acres in the Music Valley area of California.

  • HREE prospectivity: Historical United States Geological Survey (USGS) work describes HREE mineralization hosted in xenotime within the biotite-rich Pinto Gneiss, with a fractionated HREE signature.

  • Historical grades reported: USGS rock chip results reported 6.69%-15.04% TREO in the region, including high Yttrium and Dysprosium grades.

  • Rock Chip Sampling and Geophysics: The Company intends to undertake mapping, geochemistry and geophysics to define drill targets at Music Valley.

  • Strategic investment: As part of the acquisition terms, Dateline has completed a US$1.0 million investment in Fermi Critical Minerals Inc. (Fermi) intended to accelerate exploration across Fermi's uranium and rare earth portfolio.

  • Scale and pipeline leverage: Fermi has eight projects at different stages of exploration and development, with a pipeline of catalysts across uranium and REE projects in the United States.

Dateline's Managing Director, Stephen Baghdadi, commented:

"Music Valley gives Dateline direct exposure to heavy rare earth mineralization in California with historically reported high-grade TREO results and strong heavy rare earth enrichment.

"Our US$1 million investment in Fermi provides additional leverage to a substantial U.S. uranium and rare earth portfolio, including drill-permitted projects in Wyoming and Colorado.

"This transaction enhances Dateline's exposure to gold, uranium, light and heavy rare earths within the United States at a time when domestic supply chains are increasingly strategic."

Music Valley Heavy Rare Earths Project

The project is located approximately eight miles southeast of Twentynine Palms in Riverside County, California and covers the main geological units and drainages highlighted in historical USGS sampling programs.

Figure 1: Dateline Resources Project Location Plan, California

Strategic Significance

Rare Light rare earth elements (LREEs) such as neodymium and praseodymium are essential to high-performance permanent magnets used in electric vehicles, wind turbines and advanced motors. Heavy rare earth elements (HREEs) such as dysprosium and terbium enhance magnet strength and heat resistance and are critical to defence systems, advanced electronics and next-generation energy technologies, yet global production and processing remain heavily concentrated outside the United States.

With supply chain security now a national priority, HREEs represent a strategic gap in the U.S. critical minerals landscape. Through its California rare earth portfolio, including the Music Valley Heavy Rare Earth Project and the Colosseum, located near the Mountain Pass rare earths mine, Dateline is positioning itself to contribute to both LREE and HREE demand growth while supporting a more secure and diversified domestic supply chain.

Geological Setting

Rare earth mineralization in the broader Music Valley area was first identified in 1954 by USGS geologists. USGS mapping shows the Music Valley area is underlain by Proterozoic to Palaeozoic metasedimentary rocks intruded by granitic and alkaline igneous bodies. These units are overlain locally by Tertiary volcanic and sedimentary sequences. Faulting and fracturing are widespread and control fluid movement and mineral deposition.

USGS studies describe rare earth mineralisation associated with alkaline intrusive rocks, altered volcanic units, and reworked sedimentary materials. Heavy rare earth elements occur within accessory minerals such as xenotime, monazite, and other REE phosphates.

Figure 2: Music Valley Claims outline

USGS Rock Chip and Sample Results

USGS rock chip and sediment sampling across Music Valley returned anomalous total rare earth element values with elevated proportions of heavy rare earths1. Several samples reported enrichment in dysprosium, terbium, yttrium, and ytterbium relative to light rare earth elements. The geochemical signature reflects fractionated rare earth systems consistent with heavy rare earth dominant mineralisation.

Table 1: USGS rock chip sampling results from Pinto Gneiss in the region1

Element

Concentration (wt percent)

Stoichiometric Equivalent (%)1

Yttrium

3.50 - 8.80% Y

4.44 - 11.18% Y2O3

Lanthanum

0.26 - 0.34% La

0.30 - 0.40% La2O3

Cerium

0.47 - 0.94% Ce

0.55 - 1.10% CeO2

Neodymium

0.24 - 0.41% Nd

0.28 - 0.48% Nd2O3

Dysprosium

0.22 - 0.41% Dy

0.25 - 0.47% Dy2O3

Ytterbium

0.46 - 0.75% Yb

0.52 - 0.85% Yb2O3

Thorium

0.31 - 0.49% Th

0.35 - 0.56% ThO2

TOTAL

6.69 - 15.04% TREO

  1. Stoichiometric oxide equivalent calculated by multiplying the wt% of the element by the relevant conversion factor

  2. Sample locations not specified

1 Evans, J.R., 1964, Xenotime mineralization in the southern Music Valley area, Riverside County, California: California Division of Mines and Geology Special Report 79, 24 p.

Exploration Rationale

Dateline's exploration model for the Music Valley HREE Project focuses on:

  • Documented heavy rare earth enrichment from USGS sampling,

  • Favourable alkaline and altered host rocks,

  • Structural controls which concentrate mineralised fluids and sediments, and

  • Potential for near surface mineralisation.

Planned Work

In order to build up a 'stacked evidence' model prior to drilling, the initial work programs will include:

  • Detailed geological mapping,

  • Confirmatory rock chip and soil sampling,

  • Review and integration of historical USGS datasets, and

  • Geophysical surveys to define subsurface targets.

Dateline considers the Music Valley area to be highly prospective and is working to expand the project area through further acquisitions and/or claim staking.

The planned work program at the Music Valley Project will be funded from the existing cash balance of over $53M.

Strategic investment in Fermi Critical Minerals Inc.

As part of the acquisition terms of the Music Valley HREE Project, Dateline has completed a US$1.0 million strategic equity investment in Fermi. Fermi is raising a total of US$4 million from investors. On completion of the capital raise by Fermi, Dateline will own four million shares out of a total of approximately 45 million shares on issue. Fermi intends to use the funds to accelerate exploration across its U.S. mining portfolio, including drilling on priority uranium targets, additional geophysical surveys, systematic sampling on rare earth properties, technical/modelling work and working capital/regulatory advancement.

Further details on the Fermi project portfolio can be found at https://fermiuranium.com/

Transaction Summary - Total outlay of US$1.05M

Component

What Dateline secured

Key attributes

Music Valley HREE Project (California)

100% of the Music Valley claim package

57 claims; 1,140 acres; HREE prospectivity; xenotime-hosted mineralization within Pinto Gneiss; historical USGS results reported up to 15.04% TREO

Strategic equity investment in Fermi Critical Minerals Inc.

(U.S. uranium & REE portfolio)

4 million Fully Paid Ordinary shares in Fermi, exposure to a multi-asset project portfolio

Eight projects 785 federal claims; 11 Wyoming State leases; drill-permitted/near-permitted assets including New Fork Valley & Pitchfork

Additional Gold Upside Potential

The Music Valley area was also historically mined for gold, with dozens of small-scale adits and shafts developed in the area. Most of this activity occurred prior to 1920 so there is only limited information available with regards to tonnes and grade. Whilst rare earths will be the primary target at Music Valley, mapping, rock chip sampling and geochemistry will also assess the gold potential of the region.

Figure 3 shows the historic gold prospects in the Mindat database.

Figure 3: Historical Gold Prospects (source mindat.org)

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline owns 100% of the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

In February 2026, Dateline announced the acquisition of the Music Valley Heavy Rare Earth Project in Riverside County, California. The region has known HREE mineralisation from USGS rock chip sampling, however it has not been subjected to modern exploration techniques.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

L.Holland--TFWP