The Fort Worth Press - Noram Adds Additional Critical Mineral to List of High-Value Byproduct Credits in Zeus Project Upgraded PEA

USD -
AED 3.672504
AFN 64.000368
ALL 82.099008
AMD 367.63228
ANG 1.790403
AOA 917.503981
ARS 1492.901385
AUD 1.443002
AWG 1.8025
AZN 1.70397
BAM 1.709092
BBD 2.014681
BDT 123.336392
BGN 1.69088
BHD 0.377157
BIF 2975.313497
BMD 1
BND 1.290864
BOB 6.927077
BRL 5.170399
BSD 1.000306
BTN 95.296893
BWP 13.491502
BYN 2.902259
BYR 19600
BZD 2.011797
CAD 1.41995
CDF 2246.000362
CHF 0.801016
CLF 0.023518
CLP 925.617163
CNY 6.789104
CNH 6.785505
COP 3363.656224
CRC 455.717219
CUC 1
CUP 26.5
CVE 96.35601
CZK 21.144704
DJF 178.127321
DKK 6.535604
DOP 59.256346
DZD 133.361297
EGP 49.283873
ERN 15
ETB 160.4018
EUR 0.873904
FJD 2.26045
FKP 0.748732
GBP 0.746798
GEL 2.63504
GGP 0.748732
GHS 11.363656
GIP 0.748732
GMD 72.503851
GNF 8772.665705
GTQ 7.634028
GYD 209.236685
HKD 7.84465
HNL 26.773277
HRK 6.587504
HTG 130.834098
HUF 308.910388
IDR 17994.4
ILS 2.99865
IMP 0.748732
INR 95.215504
IQD 1310.350854
IRR 1375950.000352
ISK 125.920386
JEP 0.748732
JMD 158.351903
JOD 0.70904
JPY 161.36504
KES 129.3398
KGS 87.447704
KHR 4005.767466
KMF 431.00035
KPW 900.00035
KRW 1529.303789
KWD 0.31029
KYD 0.833661
KZT 473.045834
LAK 22586.621226
LBP 89575.392144
LKR 335.046096
LRD 181.552847
LSL 16.224931
LTL 2.95274
LVL 0.60489
LYD 6.4115
MAD 9.354393
MDL 17.595141
MGA 4240.835409
MKD 53.86027
MMK 2099.691108
MNT 3584.859602
MOP 8.08057
MRU 39.921353
MUR 47.050378
MVR 15.460378
MWK 1734.609167
MXN 17.469104
MYR 4.071039
MZN 63.910377
NAD 16.224931
NGN 1370.080377
NIO 36.806921
NOK 9.841039
NPR 152.475204
NZD 1.75116
OMR 0.385704
PAB 1.000306
PEN 3.403766
PGK 4.394635
PHP 61.501038
PKR 278.103989
PLN 3.75205
PYG 6082.055315
QAR 3.656661
RON 4.568038
RSD 102.570892
RUB 76.986936
RWF 1464.412112
SAR 3.755774
SBD 8.058541
SCR 13.46616
SDG 600.503676
SEK 9.65806
SGD 1.291404
SHP 0.746601
SLE 24.350371
SLL 20969.503664
SOS 571.678245
SRD 37.566038
STD 20697.981008
STN 21.409534
SVC 8.752567
SYP 110.532098
SZL 16.22231
THB 33.325038
TJS 9.2726
TMT 3.51
TND 2.952244
TOP 2.40776
TRY 46.767504
TTD 6.779394
TWD 31.938038
TZS 2626.818718
UAH 44.550181
UGX 3650.980906
UYU 40.232446
UZS 11983.221916
VES 638.90327
VND 26296
VUV 119.804122
WST 2.773179
XAF 573.213615
XAG 0.016021
XAU 0.00024
XCD 2.70255
XCG 1.80277
XDR 0.712894
XOF 573.213615
XPF 104.216367
YER 237.050363
ZAR 16.231504
ZMK 9001.203584
ZMW 18.379866
ZWL 321.999592
  • CMSC

    0.0400

    21.99

    +0.18%

  • VOD

    0.1400

    13.15

    +1.06%

  • NGG

    2.6700

    82.85

    +3.22%

  • RBGPF

    2.5400

    68.15

    +3.73%

  • RIO

    1.0700

    94.42

    +1.13%

  • GSK

    2.3600

    53.66

    +4.4%

  • AZN

    11.2900

    195.15

    +5.79%

  • BTI

    1.2100

    61.77

    +1.96%

  • BCE

    0.4000

    21.42

    +1.87%

  • RYCEF

    0.5400

    19.68

    +2.74%

  • CMSD

    -0.0300

    22.15

    -0.14%

  • BCC

    0.4500

    75.93

    +0.59%

  • RELX

    0.5500

    31.93

    +1.72%

  • JRI

    0.0600

    13

    +0.46%

  • BP

    1.2500

    37.4

    +3.34%

Noram Adds Additional Critical Mineral to List of High-Value Byproduct Credits in Zeus Project Upgraded PEA
Noram Adds Additional Critical Mineral to List of High-Value Byproduct Credits in Zeus Project Upgraded PEA

Noram Adds Additional Critical Mineral to List of High-Value Byproduct Credits in Zeus Project Upgraded PEA

VANCOUVER, BC / ACCESS Newswire / February 25, 2026 / Noram Lithium Corp. ("Noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) is pleased to announce the addition of molybdenum to the significant list of valuable byproduct credits that will be incorporated into the upcoming Preliminary Economic Assessment ("PEA"). The Project now hosts multiple U.S.-designated critical minerals, including lithium, molybdenum, cesium, rubidium, and potash potential.

Text size:

"Preliminary internal modelling suggests that these by-product credits could materially reduce projected operating costs," said Executive Chairman, Sandy MacDougall. "Molybdenum is designated as a critical mineral by the U.S. government due to its importance in defense, infrastructure, aerospace, and advanced manufacturing. As a domestic source of multiple U.S.-designated critical minerals, the Project may also qualify for federal financing, permitting support, and strategic supply chain initiatives. Ultimately, this diversified mineral profile significantly strengthens the long-term economic and strategic value of the Zeus Project."

Primarily used to strengthen steel and high-performance alloys, molybdenum enhances corrosion resistance and heat tolerance in:

  • Defense and aerospace components

  • Energy infrastructure and pipelines

  • LNG facilities

  • Industrial manufacturing systems

  • Advanced power generation

Global molybdenum supply is structurally constrained, with a significant portion produced as a by-product of copper mining. This dynamic can limit rapid supply expansion and supports long-term industrial relevance.
The Company will evaluate the recoverability and economic contribution of molybdenum as part of ongoing metallurgical and economic studies.

The potential recovery of these additional by-products may:

  • Reduce projected lithium production costs through by-product revenue credits

  • Diversify revenue streams across energy transition and industrial markets

  • Improve projected internal rate of return (IRR) and net present value (NPV) in future economic studies

  • Enhance project financing flexibility

  • Increase strategic relevance under evolving U.S. critical mineral policy initiatives

As a domestic source of multiple designated critical minerals, the Zeus Project would be well-positioned for consideration under federal programs supporting supply chain resilience, permitting efficiency, and critical mineral development.

About Noram Lithium Corp.

Noram Lithium Corp. (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) is focusing on advancing its 100%-owned Zeus Lithium Project located in Clayton Valley, Nevada an emerging lithium hub within the United States. With the upsurge in the electric vehicle and energy storage markets the Company aims to become a key participant in the domestic supply of lithium in the United States. The Company is committed to creating shareholder value through the strategic allocation of capital.

Please visit our web site for further information: www.noramlithiumcorp.com.

ON BEHALF OF THE BOARD OF DIRECTORS

Sandy MacDougall
Founder and Executive Chairman
C: 778.999.2159

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding Forward Looking Information

This news release may contain forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements regarding, among other things, plans for ongoing development of the Zeus Lithium Project. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, regulatory approval processes, results of further exploration work, and availability of capital on terms acceptable to the Company. Although Noram believes that the assumptions used in preparing the forward-looking information in this news release are reasonable, including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Noram disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable securities laws.

SOURCE: Noram Lithium Corp.



View the original press release on ACCESS Newswire

C.M.Harper--TFWP