The Fort Worth Press - Eagle Plains Provides Update on Uranium City Uranium Projects and Announces Hiring of Andrew Wilson as Investor Relations Representative

USD -
AED 3.672496
AFN 65.999806
ALL 80.065663
AMD 364.508186
ANG 1.789783
AOA 917.00022
ARS 1494.993551
AUD 1.414697
AWG 1.8
AZN 1.701613
BAM 1.689756
BBD 2.014385
BDT 122.018757
BGN 1.696366
BHD 0.377122
BIF 2988.381635
BMD 1
BND 1.277847
BOB 11.57636
BRL 5.2128
BSD 1.000151
BTN 95.647328
BWP 13.500659
BYN 3.042032
BYR 19600
BZD 2.011491
CAD 1.38791
CDF 2270.000115
CHF 0.810845
CLF 0.023463
CLP 923.440076
CNY 6.743299
CNH 6.741275
COP 3104.88
CRC 449.263467
CUC 1
CUP 26.5
CVE 95.26422
CZK 20.87201
DJF 178.102253
DKK 6.44984
DOP 58.749838
DZD 132.909333
EGP 50.536797
ERN 15
ETB 161.789969
EUR 0.86277
FJD 2.210497
FKP 0.738395
GBP 0.738265
GEL 2.605005
GGP 0.738395
GHS 11.051977
GIP 0.738395
GMD 73.999672
GNF 8785.692687
GTQ 7.628839
GYD 209.246268
HKD 7.84389
HNL 26.815845
HRK 6.501403
HTG 130.826022
HUF 315.642037
IDR 17830
ILS 2.99085
IMP 0.738395
INR 95.707199
IQD 1310.230424
IRR 1374575.000079
ISK 122.690146
JEP 0.738395
JMD 158.034569
JOD 0.709008
JPY 159.236503
KES 129.4971
KGS 87.449576
KHR 4046.085458
KMF 426.000436
KPW 900.000294
KRW 1397.419776
KWD 0.30879
KYD 0.83347
KZT 461.929241
LAK 22540.358638
LBP 89562.572897
LKR 331.975446
LRD 181.52836
LSL 16.225328
LTL 2.95274
LVL 0.60489
LYD 6.372767
MAD 9.292836
MDL 17.252581
MGA 4307.838521
MKD 53.155873
MMK 2099.245957
MNT 3597.150887
MOP 8.080143
MRU 40.111452
MUR 46.979692
MVR 15.45959
MWK 1734.310807
MXN 17.05922
MYR 4.063021
MZN 63.904984
NAD 16.225258
NGN 1350.239844
NIO 36.798687
NOK 9.401945
NPR 153.035552
NZD 1.703305
OMR 0.3845
PAB 1.000134
PEN 3.368483
PGK 4.494363
PHP 61.827039
PKR 277.569951
PLN 3.732885
PYG 6034.084282
QAR 3.655881
RON 4.523599
RSD 101.201289
RUB 84.90037
RWF 1473.727865
SAR 3.746587
SBD 8.025811
SCR 13.860891
SDG 601.474966
SEK 9.52765
SGD 1.276725
SHP 0.740866
SLE 24.649879
SLL 20969.499227
SOS 571.623589
SRD 37.966977
STD 20697.981008
STN 21.167221
SVC 8.751096
SYP 13001.999906
SZL 16.213578
THB 33.127958
TJS 9.241263
TMT 3.5
TND 2.929025
TOP 2.40776
TRY 47.931603
TTD 6.782238
TWD 31.901398
TZS 2647.976038
UAH 44.802989
UGX 3730.646945
UYU 40.347315
UZS 11821.830168
VES 771.57685
VND 26178
VUV 118.215486
WST 2.715898
XAF 566.748027
XAG 0.015938
XAU 0.00023
XCD 2.70255
XCG 1.802528
XDR 0.707052
XOF 566.738234
XPF 103.038184
YER 237.10406
ZAR 16.25505
ZMK 9001.202246
ZMW 18.677668
ZWL 321.999592
  • RBGPF

    0.3500

    69

    +0.51%

  • CMSC

    -0.1200

    21.24

    -0.56%

  • BCC

    -1.7600

    80.18

    -2.2%

  • CMSD

    -0.0900

    21.09

    -0.43%

  • BCE

    0.0100

    23.36

    +0.04%

  • NGG

    0.8600

    82.15

    +1.05%

  • RIO

    -0.5200

    96.69

    -0.54%

  • RELX

    0.9500

    34.51

    +2.75%

  • GSK

    0.8700

    51.15

    +1.7%

  • JRI

    -0.0400

    12.44

    -0.32%

  • RYCEF

    -0.2500

    20.81

    -1.2%

  • AZN

    3.2100

    160.1

    +2%

  • VOD

    -0.0700

    16.13

    -0.43%

  • BTI

    0.6500

    56.38

    +1.15%

  • BP

    0.5600

    43.41

    +1.29%

Eagle Plains Provides Update on Uranium City Uranium Projects and Announces Hiring of Andrew Wilson as Investor Relations Representative
Eagle Plains Provides Update on Uranium City Uranium Projects and Announces Hiring of Andrew Wilson as Investor Relations Representative

Eagle Plains Provides Update on Uranium City Uranium Projects and Announces Hiring of Andrew Wilson as Investor Relations Representative

CRANBROOK, BC / ACCESS Newswire / February 19, 2026 / Eagle Plains Resources Ltd. (TSXV:EPL)(OTCQB:EGPLF) ("EPL" or "Eagle Plains") has offered to Xcite Resources Inc.(TSX-V:XRI) ("XRI or Xcite"), and Xcite has accepted, seven dispositions recently acquired by staking in the Uranium City area, northern Saskatchewan. The dispositions fall within an Area of Mutual Interest ("AMI") and as such, will become included in the Don Lake, Smitty and Beaver River projects respectively. The Don Lake - Smitty projects are now contiguous with an additional 2649ha of claims bringing the total area to 4055ha. The Beaver River project has added 1578ha, for a total of 3033ha.

Text size:

In December 2023 Eagle Plains granted Xcite the exclusive right to earn up to an 80% interest in the Gulch, Lorado, Beaver River, Black Bay, Don Lake, and Smitty projects. The six projects comprising the Xcite option agreements cover forty Saskatchewan Mineral Deposit Index (SMDI) occurrences and four past-producing uranium mines.

The Uranium City projects are included in a formal Exploration Agreement between Eagle Plains and the Ya'thi Néné Lands and Resource Office ("YNLR"), representing the Athabasca Denesułiné First Nations of Hatchet Lake, Black Lake, and Fond du Lac, the Northern Hamlet of Stony Rapids, and the Northern Settlements of Uranium City, Wollaston Lake and Camsell Portage.

See Uranium City project map here

Don Lake - Smitty

The new tenures at the Don Lake - Smitty area cover 14 SMDI uranium occurrences, including the past producing Beta Gamma mine and two mineralized zones that have been bulk sampled. The more significant occurrences are described below.

Mineralization at Don Lake - Smitty is described as Beaverlodge type, with structurally controlled, high grade mineralization in veins and breccia-fills within basement rocks. Mineralization often occurs at geological contacts and consists of structures filled with hematite, chlorite and graphite associated with pitchblende (an ore mineral of uranium).

The Beta Gamma Mine (SMDI 1394) was first staked in 1948, to cover the prospective Heron Shear Zone. Trenching and shallow diamond drilling located two mineralized zones approximately 75 meters apart. The No.1 Zone was defined over a distance of approximately 244m with a width averaging 1m, with the No.2 Zone averaging about 1m in width over a distance of 335m. (AF 74N10-081). Between 1953 - 1955, underground development, including a three-compartment shaft between the No.1 and No.2 Zones, was completed. The mine was subsequently closed in July 1955, but was reopened in 1958 - 1959, with approximately 150 tons of mineralized material at a reported grade of 0.22% - 0.77% U3O8 shipped to the Lorado mill. (AF 74N10-0161). Resampling of historical trenches by Pelican Minerals Inc. in 2013 returned grab samples from trace amounts up to 0.77% U3O8 (Sample 085126) (MAW00451).

In 1968, SMDI 1476 Tobe Mines Uranium Occurrence 26-1 was discovered and tested by eleven short diamond drill holes totalling 178m, with the best intercept 0.07% U3O8 over 0.9 m from 5.8 - 6.7m in DDH 26-107. (AF 74N10-0161). Later in 1968, a 54 kg bulk sample of surface vein material was shipped to the Eldorado Nuclear Mill with an estimated grade of 60% U3O8. (SMDI 1476).

SMDI 1399 Consolidated Beta Gamma Mines Uranium Occurrences 6E and 6W; and Uranium Zone No. 5, discovered in the early 1950's, are occurrences of pitchblende in vertical, narrow breccia zones. In 1959, a 10-ton bulk sample of selected mineralized material from the Occurrence 6E was shipped to the Lorado mill. (SMDI 1399).

The West Uranium Showing SMDI 1398, was discovered by Basalt Uranium and Exploration in 1953. The fracture hosted pitchblende mineralization is exposed on surface for approximately 61m. Between 1953-54, 5 diamond drillholes were completed on the zone, with the best intercept 3.2% U3O8 over 37cm.

(AF 74N10-0054). In 1970, Saco Mining located and trenched a second showing in the area. Chip samples from the East Zone trenches included 4.3% U3O8 over 25.4cm and 1.3% U3O8 over 40.7cm. (AF 74N10-0410).

The SMDI 2113 Radiometric Anomaly No. 86 area was first explored in 1969 but mineralization was not discovered until 1975 by Fosago Exploration, who undertook scintillometer prospecting, geological mapping, radiometric surveying, trenching, sampling, rotary drilling and percussion drilling (AF 74N10-0472). Diamond drilling results were inconclusive, but a 50m length, 1.5m width, 3m depth trench exposed pitchblende mineralization in shears and breccia zones. Resampling of the trenches by Pelican Minerals Inc. in 2013 returned grab samples from trace amounts up to 1.89% U3O8 (Sample 085254) and 1.46% U3O8 (Sample 85255) (MAW00451).

SMDI 1411 Aurora Yellowknife Uranium Showing 50-CC2-146

The showing was located in 1950 during a geological investigation. Ten grab samples taken at equal intervals along a 17m length fracture containing erratically disseminated pitchblende returned from 0.01% to 18.20% U3O8 (AF 74N10-0056).

Permitting update

Eagle Plains has made applications with the Saskatchewan Ministry of Environment for Class 2 Exploration Permits for each of the Uranium City projects. The permits include provisions for ground-based geophysics, temporary work camps and diamond drilling.

Geophysics Update

The final deliverables from the 2025 Geotech Airborne Geophysical Surveys VTEM Plus survey have been received. A total of 697line km of survey was completed. The data has been sent to Condor Consulting Inc. for modelling and interpretation and the results will be used to refine drill targets and to identify areas for ground truthing.

Option Agreement

Under the terms of the option agreements, Xcite may earn an 80% interest in each individual property by completing CDN$3,200,000 in exploration expenditures, issuing 750,000 common shares of Xcite and making cash payments to Eagle Plains of CDN$55,000 over four years, for an aggregate of CDN$19,200,000 in exploration expenditures, 4,500,000 shares and $330,000 in cash to Eagle Plains. Upon Xcite fulfilling the terms of any or all of the earn-in agreements, an 80/20 joint venture will be formed, with Eagle Plains retaining a carried interest in all expenditures until delivery by Xcite or its assigns of a bankable feasibility study. During the option earn in period, XRI will be appointed as operator, and EPL will manage the exploration programs under the direction of a joint technical committee. The projects are owned 100% by EPL, which will retain an underlying 2% NSR royalty on the each of the properties.

Eagle Plains has been active in the uranium exploration space since 2006, with a number of projects ranging from early-stage grassroots to drill-ready and are distributed throughout the prospective Athabasca Basin including the Patterson Lake South (PLS), Beaverlodge, and Dufferin-Centennial camps. EPL is seeking to advance its uranium portfolio through collaborative partnerships.

Athabasca Basin History and Mineralization

The Beaver River, Black Bay,Don Lake, Gulch, Lorado, and Smitty projects are located in the Beaverlodge District near Uranium City in the Lake Athabasca region of Saskatchewan. Occurrences of uranium mineralization are abundant in the Uranium City area and have been explored and documented since the 1940s. The Beaverlodge camp was the first uranium producer in Canada, with historic production of approximately 70.25 million pounds of U3O8 between 1950-1982, from ore grades averaging 0.23% U3O8. The two largest producers were the Eldorado Beaverlodge (Ace-Fay-Verna) mine and the Gunnar uranium mine. The Beaverlodge area has seen limited uranium focused exploration since the early 1990's.

Rock grab samples and bulk samples are selective samples by nature and as such are not necessarily representative of the mineralization hosted across the property. Some of the above results were taken directly from the SMDI descriptions and assessment reports (SMAD) filed with the Saskatchewan government. Management cautions that historical results were collected and reported by past operators and have not been verified nor confirmed by a Qualified Person, but form a basis for ongoing work on the subject properties. Eagle Plains' management cautions that past results or discoveries on proximate land are not necessarily indicative of the results that may be achieved on the subject properties.

Investor Relations Update

Eagle Plains is pleased to announce that Andrew Wilson has been appointed Investor Relations Representative. Mr. Wilson has recently completed a 90-day probation period and has assumed a full-time position with Eagle Plains, based in Cranbrook, BC, as of February 17, 2026.

Pursuant to his employment contract, Mr. Wilson will receive a monthly salary of $5,400. The Company intends to grant Mr. Wilson stock options in accordance with the Company's stock option plan and Exchange policies. Mr. Wilson currently holds 2,240 common shares of the Company.

As the primary point of contact for Eagle Plains, Mr. Wilson's duties will include being familiar and compliant with the regulations governing disclosure of information for publicly traded companies, communicating corporate strategies and information updates, explaining the results of ongoing exploration activities, creating information materials, developing and maintaining corporate websites, managing service providers including news filing services, website designers and graphic designers, and developing marketing budgets.

Mr. Wilson holds a Bachelor of Arts in Political Science from the University of British Columbia and brings a background in energy-sector business development and executive leadership within a member-based business organization. Most recently he served as General Manager of the Kimberley & District Chamber of Commerce.

Qualified Person

Technical information in this News Release has been reviewed and approved by C.C. Downie, P.Geo., a director and officer of Eagle Plains, hereby identified as the "Qualified Person" under N.I. 43-101.

About Eagle Plains Resources

Based in Cranbrook, B.C., Eagle Plains is a well-funded, prolific project generator that continues to conduct research, acquire and explore mineral projects throughout western Canada, with a focus on critical metals integral to an increasingly electrified, decarbonized economy.

The Company was formed in 1992 and is the fourth-oldest listed issuer on the TSX-V (and the only one of these four that has not seen a roll-back or restructuring of its shares). Eagle Plains has continued to deliver shareholder value over the years and through numerous spin outs has transferred over $110,000,000 in value directly to its shareholders, with Copper Canyon Resources and Taiga Gold Corp. being notable examples. Eagle Plains latest spinout, Eagle Royalties Ltd. (CSE:"ER") was listed on May 24, 2023, and on October 30, 2025, ER shareholders overwhelmingly approved a three-cornered amalgamation that resulted in a reverse takeover of Eagle Royalties by Summit Royalty Corp. The resulting issuer is named Summit Royalties Ltd. and trades under the symbol SUM on the TSX Venture Exchange with a market capitalization of over $100M.

On October 2, 2024, Eagle Plains announced the formation of a separate division within the Company that will give Eagle Plains' shareholders direct exposure to strategic opportunities in Canadian green energy transition. As a wholly owned subsidiary of Eagle Plains, Osprey Power Inc. ("OP") will focus on identifying and advancing innovative and diverse clean energy project portfolios in target markets throughout Canada, with an initial focus on Western Canada.

Eagle Plains' core business is acquiring grassroots critical- and precious-metal exploration properties. The Company is committed to steadily enhancing shareholder value by advancing our diverse portfolio of projects toward discovery through collaborative partnerships and development of a highly experienced technical team.

Expenditures from 2010-2024 on Eagle Plains-related projects exceed $41M, the majority of which was funded by third-party partners. This exploration work resulted in approximately 50,000m of diamond-drilling and extensive ground-based exploration work facilitating the advancement of numerous projects at various stages of development.

Throughout the exploration process, our mission is to help maintain prosperous communities by exploring for and discovering resource opportunities while building lasting relationships through honest and respectful business practices.

On behalf of the Board of Directors of Eagle Plains

"C.C. (Chuck) Downie" P.Geo
President and CEO

For further information on EPL, please contact Mike Labach at 1 866 HUNT ORE (486 8673)
Email: [email protected] or visit our website at https://www.eagleplains.com

Cautionary Note Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

SOURCE: Eagle Plains Resources Ltd.



View the original press release on ACCESS Newswire

S.Jones--TFWP