The Fort Worth Press - Geophysics Converge Ahead of Colosseum Deeper Drill Program

USD -
AED 3.672504
AFN 64.000368
ALL 82.099008
AMD 367.63228
ANG 1.790403
AOA 917.503981
ARS 1492.901385
AUD 1.443002
AWG 1.8025
AZN 1.70397
BAM 1.709092
BBD 2.014681
BDT 123.336392
BGN 1.69088
BHD 0.377157
BIF 2975.313497
BMD 1
BND 1.290864
BOB 6.927077
BRL 5.170399
BSD 1.000306
BTN 95.296893
BWP 13.491502
BYN 2.902259
BYR 19600
BZD 2.011797
CAD 1.41995
CDF 2246.000362
CHF 0.801016
CLF 0.023518
CLP 925.617163
CNY 6.789104
CNH 6.785505
COP 3363.656224
CRC 455.717219
CUC 1
CUP 26.5
CVE 96.35601
CZK 21.144704
DJF 178.127321
DKK 6.535604
DOP 59.256346
DZD 133.361297
EGP 49.283873
ERN 15
ETB 160.4018
EUR 0.873904
FJD 2.26045
FKP 0.748732
GBP 0.746798
GEL 2.63504
GGP 0.748732
GHS 11.363656
GIP 0.748732
GMD 72.503851
GNF 8772.665705
GTQ 7.634028
GYD 209.236685
HKD 7.84465
HNL 26.773277
HRK 6.587504
HTG 130.834098
HUF 308.910388
IDR 17994.4
ILS 2.99865
IMP 0.748732
INR 95.215504
IQD 1310.350854
IRR 1375950.000352
ISK 125.920386
JEP 0.748732
JMD 158.351903
JOD 0.70904
JPY 161.36504
KES 129.3398
KGS 87.447704
KHR 4005.767466
KMF 431.00035
KPW 900.00035
KRW 1529.303789
KWD 0.31029
KYD 0.833661
KZT 473.045834
LAK 22586.621226
LBP 89575.392144
LKR 335.046096
LRD 181.552847
LSL 16.224931
LTL 2.95274
LVL 0.60489
LYD 6.4115
MAD 9.354393
MDL 17.595141
MGA 4240.835409
MKD 53.86027
MMK 2099.691108
MNT 3584.859602
MOP 8.08057
MRU 39.921353
MUR 47.050378
MVR 15.460378
MWK 1734.609167
MXN 17.469104
MYR 4.071039
MZN 63.910377
NAD 16.224931
NGN 1370.080377
NIO 36.806921
NOK 9.841039
NPR 152.475204
NZD 1.75116
OMR 0.385704
PAB 1.000306
PEN 3.403766
PGK 4.394635
PHP 61.501038
PKR 278.103989
PLN 3.75205
PYG 6082.055315
QAR 3.656661
RON 4.568038
RSD 102.570892
RUB 76.986936
RWF 1464.412112
SAR 3.755774
SBD 8.058541
SCR 13.46616
SDG 600.503676
SEK 9.65806
SGD 1.291404
SHP 0.746601
SLE 24.350371
SLL 20969.503664
SOS 571.678245
SRD 37.566038
STD 20697.981008
STN 21.409534
SVC 8.752567
SYP 110.532098
SZL 16.22231
THB 33.325038
TJS 9.2726
TMT 3.51
TND 2.952244
TOP 2.40776
TRY 46.767504
TTD 6.779394
TWD 31.938038
TZS 2626.818718
UAH 44.550181
UGX 3650.980906
UYU 40.232446
UZS 11983.221916
VES 638.90327
VND 26296
VUV 119.804122
WST 2.773179
XAF 573.213615
XAG 0.016021
XAU 0.00024
XCD 2.70255
XCG 1.80277
XDR 0.712894
XOF 573.213615
XPF 104.216367
YER 237.050363
ZAR 16.231504
ZMK 9001.203584
ZMW 18.379866
ZWL 321.999592
  • CMSC

    0.0400

    21.99

    +0.18%

  • RELX

    0.5500

    31.93

    +1.72%

  • RIO

    1.0700

    94.42

    +1.13%

  • GSK

    2.3600

    53.66

    +4.4%

  • CMSD

    -0.0300

    22.15

    -0.14%

  • BCE

    0.4000

    21.42

    +1.87%

  • BCC

    0.4500

    75.93

    +0.59%

  • NGG

    2.6700

    82.85

    +3.22%

  • JRI

    0.0600

    13

    +0.46%

  • AZN

    11.2900

    195.15

    +5.79%

  • VOD

    0.1400

    13.15

    +1.06%

  • RBGPF

    2.5400

    68.15

    +3.73%

  • BP

    1.2500

    37.4

    +3.34%

  • RYCEF

    0.5400

    19.68

    +2.74%

  • BTI

    1.2100

    61.77

    +1.96%

Geophysics Converge Ahead of Colosseum Deeper Drill Program
Geophysics Converge Ahead of Colosseum Deeper Drill Program

Geophysics Converge Ahead of Colosseum Deeper Drill Program

Infill Geophysics Surveys Completed at Colosseum Project

Text size:

SAN BERNARDINO, CALIFORNIA / ACCESS Newswire / February 9, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is pleased to announce the completion of infill gravity, magnetic and radiometric surveys at its 100%-owned Colosseum Gold and Rare Earth Project in California, USA. This follows the completion of an induced polarisation (IP) survey across the project in December 2025.

All newly acquired geophysical datasets are being integrated to progressively sharpen drill targeting across the key structural corridors identified by earlier programs. This work is expected to transition the Company from broad-based target definition to highly focused drill testing. Diamond core drilling rigs are scheduled to begin arriving on site next week.

Infill Geophysics Program - Scope and Completion

The infill program completed was comprised of:

  • A high-resolution ground gravity survey consisting of 543 stations collected on a 100 m × 100 m grid, providing detailed density coverage across the central project area.

  • A magnetic and radiometric survey at 50m line spacing covering approximately 8.6 km² delivering high-resolution magnetic and radiometric datasets.

The surveys were designed to improve resolution over areas where earlier IP and MT data identified deep chargeability and conductivity features interpreted to be structurally controlled and potentially associated with gold mineralisation and/or REE-bearing carbonatite intrusions.

Dateline's Managing Director, Stephen Baghdadi, commented:

"The data continues to support the presence of a large mineral system, with deep structural and sulphide-hosted features interpreted as mineralising plumbing extending beyond the known near-surface ore zones. The integration of these high-quality geophysical datasets is a deliberate step to sharpen drill targeting and maximise the effectiveness of the forthcoming drilling campaign. With several targets interpreted at depths of approximately 500-1,000 metres, this approach ensures that drilling is highly focused, technically informed and capital-efficient as the Company advances into deeper, more technically demanding drill testing."

Figure 1: Preliminary TMI Magnetics from the recently completed survey at Colosseum. The colours represent variations in magnetic susceptibility within the shallow subsurface. Red and pink zones indicate magnetic highs reflecting magnetite bearing intrusive rocks, altered breccia bodies. Blue zones indicate magnetic lows point to zones of destruction or alteration of magnetite. Encouragingly, the magnetic data is aligned with the magneto-telluric and IP surveys as disclosed to the market on January 27, 2026

Figure 2: Preliminary Bouguer Gravity from the recently completed survey at Colosseum. The red and pink zones indicate higher density rocks, whilst the green and blues indicate lower density rocks (such as sediments). The strong gravity high on the eastern side points to dense intrusive or altered bodies at depth (alkaline intrusive rocks, breccia pipe roots, or carbonatite related material). There also appears to be a sharp N-S gravity gradient that aligns with the Clark Mountain fault.

Figure 3: Preliminary Radiometrics (Total Count) from the recently completed survey at Colosseum. Dose rate represents the combined gamma radiation from potassium, thorium, and uranium in the upper soil and rock profile. Elevated total counts reflect enrichment in potassium, thorium, and uranium associated with alkaline intrusive rocks and hydrothermal alteration, highlighting structural corridors and targets prospective for gold and rare earth mineralisation.

Data Integration and Interpretation

The complete geophysical dataset, including the new infill gravity, magnetic and radiometric data together with previously completed IP and MT surveys, is currently being reviewed and integrated by Mitre Geophysics.

This integrated interpretation is focused on:

  • Refining the geometry and continuity of the structures,

  • Linking deep geophysical responses to mapped geology, structural features and previously identified geochemical and alteration signatures; and

  • Finalising priority drill targets where multiple geophysical datasets converge.

Drilling Update

As previously advised, diamond drill rigs remain scheduled to arrive on site next week. Drill planning is progressing in parallel with the ongoing geophysical interpretation, with the objective of testing the highest-priority targets identified from the integrated dataset.

Further updates will be provided as interpretation is finalised and drilling commences.

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline also owns 100% of the high-grade Argos Strontium Project, also located in San Bernardino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

M.McCoy--TFWP