The Fort Worth Press - Geophysics Converge Ahead of Colosseum Deeper Drill Program

USD -
AED 3.672497
AFN 65.498954
ALL 81.051571
AMD 375.859332
ANG 1.79008
AOA 916.501883
ARS 1416.465399
AUD 1.414317
AWG 1.8
AZN 1.701507
BAM 1.642701
BBD 2.007895
BDT 121.837729
BGN 1.67937
BHD 0.376961
BIF 2949.857215
BMD 1
BND 1.265076
BOB 6.903242
BRL 5.195199
BSD 0.996892
BTN 90.375901
BWP 13.137914
BYN 2.873173
BYR 19600
BZD 2.004955
CAD 1.355585
CDF 2215.000071
CHF 0.766904
CLF 0.021602
CLP 852.980108
CNY 6.922502
CNH 6.90796
COP 3673.08
CRC 494.204603
CUC 1
CUP 26.5
CVE 92.612579
CZK 20.339104
DJF 177.523938
DKK 6.27213
DOP 62.758273
DZD 129.513985
EGP 46.910512
ERN 15
ETB 155.496052
EUR 0.83951
FJD 2.19255
FKP 0.735168
GBP 0.730965
GEL 2.689597
GGP 0.735168
GHS 10.970939
GIP 0.735168
GMD 73.502553
GNF 8751.926558
GTQ 7.647373
GYD 208.567109
HKD 7.81617
HNL 26.333781
HRK 6.32799
HTG 130.732404
HUF 316.336499
IDR 16804
ILS 3.08989
IMP 0.735168
INR 90.57175
IQD 1305.980178
IRR 42125.000158
ISK 121.719873
JEP 0.735168
JMD 155.929783
JOD 0.709033
JPY 155.317498
KES 128.949541
KGS 87.450149
KHR 4020.661851
KMF 414.000336
KPW 899.993603
KRW 1457.064978
KWD 0.307097
KYD 0.830758
KZT 492.323198
LAK 21424.491853
LBP 89570.078396
LKR 308.550311
LRD 185.426737
LSL 15.97833
LTL 2.95274
LVL 0.60489
LYD 6.302705
MAD 9.117504
MDL 16.932639
MGA 4376.784814
MKD 51.736295
MMK 2099.674626
MNT 3566.287566
MOP 8.025869
MRU 39.586763
MUR 45.679467
MVR 15.459819
MWK 1728.624223
MXN 17.1953
MYR 3.925499
MZN 63.759895
NAD 15.97833
NGN 1355.730153
NIO 36.687385
NOK 9.59125
NPR 144.601881
NZD 1.656025
OMR 0.384503
PAB 0.996892
PEN 3.348144
PGK 4.337309
PHP 58.449505
PKR 278.761885
PLN 3.53354
PYG 6573.156392
QAR 3.634035
RON 4.272597
RSD 98.540052
RUB 77.000688
RWF 1455.48463
SAR 3.75043
SBD 8.054878
SCR 14.633028
SDG 601.486468
SEK 8.92825
SGD 1.26485
SHP 0.750259
SLE 24.52503
SLL 20969.499267
SOS 568.704855
SRD 37.971503
STD 20697.981008
STN 20.57786
SVC 8.723333
SYP 11059.574895
SZL 15.970939
THB 31.149714
TJS 9.336094
TMT 3.5
TND 2.879712
TOP 2.40776
TRY 43.600996
TTD 6.753738
TWD 31.536503
TZS 2576.097015
UAH 42.973963
UGX 3548.630942
UYU 38.224264
UZS 12265.141398
VES 384.79041
VND 25875
VUV 119.675943
WST 2.73072
XAF 550.946582
XAG 0.012216
XAU 0.000198
XCD 2.70255
XCG 1.796657
XDR 0.685201
XOF 550.946582
XPF 100.167141
YER 238.350334
ZAR 15.90663
ZMK 9001.202449
ZMW 18.8468
ZWL 321.999592
  • RBGPF

    0.1000

    82.5

    +0.12%

  • SCS

    0.0200

    16.14

    +0.12%

  • RYCEF

    0.5300

    17.41

    +3.04%

  • CMSC

    0.0750

    23.585

    +0.32%

  • GSK

    -1.2200

    59.01

    -2.07%

  • RIO

    3.4400

    96.85

    +3.55%

  • CMSD

    0.0200

    23.97

    +0.08%

  • NGG

    0.3300

    88.39

    +0.37%

  • RELX

    0.1000

    29.48

    +0.34%

  • BCC

    -2.0100

    89.02

    -2.26%

  • BCE

    0.5400

    25.62

    +2.11%

  • BTI

    -1.6500

    61.15

    -2.7%

  • JRI

    -0.1600

    12.81

    -1.25%

  • VOD

    0.3700

    15.48

    +2.39%

  • BP

    0.2100

    39.22

    +0.54%

  • AZN

    -5.0200

    188.01

    -2.67%

Geophysics Converge Ahead of Colosseum Deeper Drill Program
Geophysics Converge Ahead of Colosseum Deeper Drill Program

Geophysics Converge Ahead of Colosseum Deeper Drill Program

Infill Geophysics Surveys Completed at Colosseum Project

Text size:

SAN BERNARDINO, CALIFORNIA / ACCESS Newswire / February 9, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is pleased to announce the completion of infill gravity, magnetic and radiometric surveys at its 100%-owned Colosseum Gold and Rare Earth Project in California, USA. This follows the completion of an induced polarisation (IP) survey across the project in December 2025.

All newly acquired geophysical datasets are being integrated to progressively sharpen drill targeting across the key structural corridors identified by earlier programs. This work is expected to transition the Company from broad-based target definition to highly focused drill testing. Diamond core drilling rigs are scheduled to begin arriving on site next week.

Infill Geophysics Program - Scope and Completion

The infill program completed was comprised of:

  • A high-resolution ground gravity survey consisting of 543 stations collected on a 100 m × 100 m grid, providing detailed density coverage across the central project area.

  • A magnetic and radiometric survey at 50m line spacing covering approximately 8.6 km² delivering high-resolution magnetic and radiometric datasets.

The surveys were designed to improve resolution over areas where earlier IP and MT data identified deep chargeability and conductivity features interpreted to be structurally controlled and potentially associated with gold mineralisation and/or REE-bearing carbonatite intrusions.

Dateline's Managing Director, Stephen Baghdadi, commented:

"The data continues to support the presence of a large mineral system, with deep structural and sulphide-hosted features interpreted as mineralising plumbing extending beyond the known near-surface ore zones. The integration of these high-quality geophysical datasets is a deliberate step to sharpen drill targeting and maximise the effectiveness of the forthcoming drilling campaign. With several targets interpreted at depths of approximately 500-1,000 metres, this approach ensures that drilling is highly focused, technically informed and capital-efficient as the Company advances into deeper, more technically demanding drill testing."

Figure 1: Preliminary TMI Magnetics from the recently completed survey at Colosseum. The colours represent variations in magnetic susceptibility within the shallow subsurface. Red and pink zones indicate magnetic highs reflecting magnetite bearing intrusive rocks, altered breccia bodies. Blue zones indicate magnetic lows point to zones of destruction or alteration of magnetite. Encouragingly, the magnetic data is aligned with the magneto-telluric and IP surveys as disclosed to the market on January 27, 2026

Figure 2: Preliminary Bouguer Gravity from the recently completed survey at Colosseum. The red and pink zones indicate higher density rocks, whilst the green and blues indicate lower density rocks (such as sediments). The strong gravity high on the eastern side points to dense intrusive or altered bodies at depth (alkaline intrusive rocks, breccia pipe roots, or carbonatite related material). There also appears to be a sharp N-S gravity gradient that aligns with the Clark Mountain fault.

Figure 3: Preliminary Radiometrics (Total Count) from the recently completed survey at Colosseum. Dose rate represents the combined gamma radiation from potassium, thorium, and uranium in the upper soil and rock profile. Elevated total counts reflect enrichment in potassium, thorium, and uranium associated with alkaline intrusive rocks and hydrothermal alteration, highlighting structural corridors and targets prospective for gold and rare earth mineralisation.

Data Integration and Interpretation

The complete geophysical dataset, including the new infill gravity, magnetic and radiometric data together with previously completed IP and MT surveys, is currently being reviewed and integrated by Mitre Geophysics.

This integrated interpretation is focused on:

  • Refining the geometry and continuity of the structures,

  • Linking deep geophysical responses to mapped geology, structural features and previously identified geochemical and alteration signatures; and

  • Finalising priority drill targets where multiple geophysical datasets converge.

Drilling Update

As previously advised, diamond drill rigs remain scheduled to arrive on site next week. Drill planning is progressing in parallel with the ongoing geophysical interpretation, with the objective of testing the highest-priority targets identified from the integrated dataset.

Further updates will be provided as interpretation is finalised and drilling commences.

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline also owns 100% of the high-grade Argos Strontium Project, also located in San Bernardino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

M.McCoy--TFWP