The Fort Worth Press - Geophysics Converge Ahead of Colosseum Deeper Drill Program

USD -
AED 3.672496
AFN 65.999806
ALL 80.065663
AMD 364.508186
ANG 1.789783
AOA 917.00022
ARS 1494.993551
AUD 1.414697
AWG 1.8
AZN 1.701613
BAM 1.689756
BBD 2.014385
BDT 122.018757
BGN 1.696366
BHD 0.377122
BIF 2988.381635
BMD 1
BND 1.277847
BOB 11.57636
BRL 5.2128
BSD 1.000151
BTN 95.647328
BWP 13.500659
BYN 3.042032
BYR 19600
BZD 2.011491
CAD 1.38791
CDF 2270.000115
CHF 0.810845
CLF 0.023463
CLP 923.440076
CNY 6.743299
CNH 6.741275
COP 3104.88
CRC 449.263467
CUC 1
CUP 26.5
CVE 95.26422
CZK 20.87201
DJF 178.102253
DKK 6.44984
DOP 58.749838
DZD 132.909333
EGP 50.536797
ERN 15
ETB 161.789969
EUR 0.86277
FJD 2.210497
FKP 0.738395
GBP 0.738265
GEL 2.605005
GGP 0.738395
GHS 11.051977
GIP 0.738395
GMD 73.999672
GNF 8785.692687
GTQ 7.628839
GYD 209.246268
HKD 7.84389
HNL 26.815845
HRK 6.501403
HTG 130.826022
HUF 315.642037
IDR 17830
ILS 2.99085
IMP 0.738395
INR 95.707199
IQD 1310.230424
IRR 1374575.000079
ISK 122.690146
JEP 0.738395
JMD 158.034569
JOD 0.709008
JPY 159.236503
KES 129.4971
KGS 87.449576
KHR 4046.085458
KMF 426.000436
KPW 900.000294
KRW 1397.419776
KWD 0.30879
KYD 0.83347
KZT 461.929241
LAK 22540.358638
LBP 89562.572897
LKR 331.975446
LRD 181.52836
LSL 16.225328
LTL 2.95274
LVL 0.60489
LYD 6.372767
MAD 9.292836
MDL 17.252581
MGA 4307.838521
MKD 53.155873
MMK 2099.245957
MNT 3597.150887
MOP 8.080143
MRU 40.111452
MUR 46.979692
MVR 15.45959
MWK 1734.310807
MXN 17.05922
MYR 4.063021
MZN 63.904984
NAD 16.225258
NGN 1350.239844
NIO 36.798687
NOK 9.401945
NPR 153.035552
NZD 1.703305
OMR 0.3845
PAB 1.000134
PEN 3.368483
PGK 4.494363
PHP 61.827039
PKR 277.569951
PLN 3.732885
PYG 6034.084282
QAR 3.655881
RON 4.523599
RSD 101.201289
RUB 84.90037
RWF 1473.727865
SAR 3.746587
SBD 8.025811
SCR 13.860891
SDG 601.474966
SEK 9.52765
SGD 1.276725
SHP 0.740866
SLE 24.649879
SLL 20969.499227
SOS 571.623589
SRD 37.966977
STD 20697.981008
STN 21.167221
SVC 8.751096
SYP 13001.999906
SZL 16.213578
THB 33.127958
TJS 9.241263
TMT 3.5
TND 2.929025
TOP 2.40776
TRY 47.931603
TTD 6.782238
TWD 31.901398
TZS 2647.976038
UAH 44.802989
UGX 3730.646945
UYU 40.347315
UZS 11821.830168
VES 771.57685
VND 26178
VUV 118.215486
WST 2.715898
XAF 566.748027
XAG 0.015938
XAU 0.00023
XCD 2.70255
XCG 1.802528
XDR 0.707052
XOF 566.738234
XPF 103.038184
YER 237.10406
ZAR 16.25505
ZMK 9001.202246
ZMW 18.677668
ZWL 321.999592
  • RBGPF

    0.3500

    69

    +0.51%

  • RYCEF

    -0.2500

    20.81

    -1.2%

  • BCC

    -1.7600

    80.18

    -2.2%

  • GSK

    0.8700

    51.15

    +1.7%

  • BTI

    0.6500

    56.38

    +1.15%

  • NGG

    0.8600

    82.15

    +1.05%

  • BP

    0.5600

    43.41

    +1.29%

  • AZN

    3.2100

    160.1

    +2%

  • BCE

    0.0100

    23.36

    +0.04%

  • RELX

    0.9500

    34.51

    +2.75%

  • CMSC

    -0.1200

    21.24

    -0.56%

  • CMSD

    -0.0900

    21.09

    -0.43%

  • RIO

    -0.5200

    96.69

    -0.54%

  • JRI

    -0.0400

    12.44

    -0.32%

  • VOD

    -0.0700

    16.13

    -0.43%

Geophysics Converge Ahead of Colosseum Deeper Drill Program
Geophysics Converge Ahead of Colosseum Deeper Drill Program

Geophysics Converge Ahead of Colosseum Deeper Drill Program

Infill Geophysics Surveys Completed at Colosseum Project

Text size:

SAN BERNARDINO, CALIFORNIA / ACCESS Newswire / February 9, 2026 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is pleased to announce the completion of infill gravity, magnetic and radiometric surveys at its 100%-owned Colosseum Gold and Rare Earth Project in California, USA. This follows the completion of an induced polarisation (IP) survey across the project in December 2025.

All newly acquired geophysical datasets are being integrated to progressively sharpen drill targeting across the key structural corridors identified by earlier programs. This work is expected to transition the Company from broad-based target definition to highly focused drill testing. Diamond core drilling rigs are scheduled to begin arriving on site next week.

Infill Geophysics Program - Scope and Completion

The infill program completed was comprised of:

  • A high-resolution ground gravity survey consisting of 543 stations collected on a 100 m × 100 m grid, providing detailed density coverage across the central project area.

  • A magnetic and radiometric survey at 50m line spacing covering approximately 8.6 km² delivering high-resolution magnetic and radiometric datasets.

The surveys were designed to improve resolution over areas where earlier IP and MT data identified deep chargeability and conductivity features interpreted to be structurally controlled and potentially associated with gold mineralisation and/or REE-bearing carbonatite intrusions.

Dateline's Managing Director, Stephen Baghdadi, commented:

"The data continues to support the presence of a large mineral system, with deep structural and sulphide-hosted features interpreted as mineralising plumbing extending beyond the known near-surface ore zones. The integration of these high-quality geophysical datasets is a deliberate step to sharpen drill targeting and maximise the effectiveness of the forthcoming drilling campaign. With several targets interpreted at depths of approximately 500-1,000 metres, this approach ensures that drilling is highly focused, technically informed and capital-efficient as the Company advances into deeper, more technically demanding drill testing."

Figure 1: Preliminary TMI Magnetics from the recently completed survey at Colosseum. The colours represent variations in magnetic susceptibility within the shallow subsurface. Red and pink zones indicate magnetic highs reflecting magnetite bearing intrusive rocks, altered breccia bodies. Blue zones indicate magnetic lows point to zones of destruction or alteration of magnetite. Encouragingly, the magnetic data is aligned with the magneto-telluric and IP surveys as disclosed to the market on January 27, 2026

Figure 2: Preliminary Bouguer Gravity from the recently completed survey at Colosseum. The red and pink zones indicate higher density rocks, whilst the green and blues indicate lower density rocks (such as sediments). The strong gravity high on the eastern side points to dense intrusive or altered bodies at depth (alkaline intrusive rocks, breccia pipe roots, or carbonatite related material). There also appears to be a sharp N-S gravity gradient that aligns with the Clark Mountain fault.

Figure 3: Preliminary Radiometrics (Total Count) from the recently completed survey at Colosseum. Dose rate represents the combined gamma radiation from potassium, thorium, and uranium in the upper soil and rock profile. Elevated total counts reflect enrichment in potassium, thorium, and uranium associated with alkaline intrusive rocks and hydrothermal alteration, highlighting structural corridors and targets prospective for gold and rare earth mineralisation.

Data Integration and Interpretation

The complete geophysical dataset, including the new infill gravity, magnetic and radiometric data together with previously completed IP and MT surveys, is currently being reviewed and integrated by Mitre Geophysics.

This integrated interpretation is focused on:

  • Refining the geometry and continuity of the structures,

  • Linking deep geophysical responses to mapped geology, structural features and previously identified geochemical and alteration signatures; and

  • Finalising priority drill targets where multiple geophysical datasets converge.

Drilling Update

As previously advised, diamond drill rigs remain scheduled to arrive on site next week. Drill planning is progressing in parallel with the ongoing geophysical interpretation, with the objective of testing the highest-priority targets identified from the integrated dataset.

Further updates will be provided as interpretation is finalised and drilling commences.

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources
YouTube - @dateline.resources

About Dateline Resources Limited

Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline also owns 100% of the high-grade Argos Strontium Project, also located in San Bernardino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr. Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr. Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr. Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

M.McCoy--TFWP