The Fort Worth Press - 2026 Tunkillia Development Drilling Programs Begin

USD -
AED 3.672495
AFN 63.501471
ALL 83.072963
AMD 375.623475
ANG 1.790083
AOA 917.00026
ARS 1390.220498
AUD 1.447534
AWG 1.8
AZN 1.70702
BAM 1.695072
BBD 2.009612
BDT 122.428639
BGN 1.709309
BHD 0.377609
BIF 2964.709145
BMD 1
BND 1.2851
BOB 6.894519
BRL 5.157597
BSD 0.997742
BTN 92.939509
BWP 13.688562
BYN 2.956504
BYR 19600
BZD 2.006665
CAD 1.39245
CDF 2296.000206
CHF 0.798503
CLF 0.023224
CLP 917.000289
CNY 6.885601
CNH 6.883785
COP 3662.46
CRC 464.279833
CUC 1
CUP 26.5
CVE 95.56558
CZK 21.243197
DJF 177.673004
DKK 6.47623
DOP 60.312178
DZD 133.062353
EGP 54.2572
ERN 15
ETB 155.800822
EUR 0.866597
FJD 2.253795
FKP 0.750158
GBP 0.755625
GEL 2.685051
GGP 0.750158
GHS 10.970563
GIP 0.750158
GMD 74.000249
GNF 8752.513347
GTQ 7.632939
GYD 208.828972
HKD 7.83835
HNL 26.504427
HRK 6.530905
HTG 130.952897
HUF 333.138986
IDR 16998
ILS 3.136798
IMP 0.750158
INR 92.598303
IQD 1307.141959
IRR 1319125.000189
ISK 125.149716
JEP 0.750158
JMD 157.303566
JOD 0.708984
JPY 159.617504
KES 129.794813
KGS 87.448802
KHR 3990.137323
KMF 426.999768
KPW 899.994443
KRW 1507.020477
KWD 0.30934
KYD 0.831502
KZT 472.805432
LAK 21970.392969
LBP 89502.03926
LKR 314.804623
LRD 183.088277
LSL 16.955078
LTL 2.95274
LVL 0.60489
LYD 6.380628
MAD 9.374033
MDL 17.55613
MGA 4171.343141
MKD 53.422776
MMK 2099.621061
MNT 3572.314592
MOP 8.055104
MRU 39.637211
MUR 46.940105
MVR 15.460021
MWK 1730.071718
MXN 17.856596
MYR 4.033014
MZN 63.950312
NAD 16.954711
NGN 1378.25967
NIO 36.712196
NOK 9.734315
NPR 148.701282
NZD 1.75133
OMR 0.384545
PAB 0.997734
PEN 3.45194
PGK 4.316042
PHP 60.464505
PKR 278.39991
PLN 3.70718
PYG 6454.29687
QAR 3.638018
RON 4.417499
RSD 101.772347
RUB 80.207393
RWF 1457.240049
SAR 3.754249
SBD 8.038772
SCR 14.425806
SDG 601.000172
SEK 9.43173
SGD 1.28546
SHP 0.750259
SLE 24.650044
SLL 20969.510825
SOS 570.192924
SRD 37.35103
STD 20697.981008
STN 21.233539
SVC 8.730169
SYP 110.548921
SZL 16.948198
THB 32.646041
TJS 9.563492
TMT 3.51
TND 2.941459
TOP 2.40776
TRY 44.5833
TTD 6.768937
TWD 31.972943
TZS 2600.000206
UAH 43.698134
UGX 3743.234401
UYU 40.405091
UZS 12122.393971
VES 473.390498
VND 26342.5
VUV 120.132513
WST 2.770875
XAF 568.506489
XAG 0.013691
XAU 0.000214
XCD 2.70255
XCG 1.798209
XDR 0.70704
XOF 568.516344
XPF 103.361457
YER 238.65028
ZAR 16.94973
ZMK 9001.198572
ZMW 19.281421
ZWL 321.999592
  • RBGPF

    -13.5000

    69

    -19.57%

  • RELX

    0.3600

    33.59

    +1.07%

  • GSK

    0.7000

    56.69

    +1.23%

  • NGG

    1.1500

    87.99

    +1.31%

  • AZN

    2.7600

    203.49

    +1.36%

  • RYCEF

    0.9000

    15.99

    +5.63%

  • CMSC

    0.0500

    22.04

    +0.23%

  • BTI

    0.3900

    58.28

    +0.67%

  • BCE

    -0.9300

    24.45

    -3.8%

  • RIO

    -0.3600

    94.45

    -0.38%

  • BCC

    -1.8800

    73.2

    -2.57%

  • BP

    0.9500

    47.12

    +2.02%

  • VOD

    0.0800

    15.21

    +0.53%

  • JRI

    0.0900

    12.61

    +0.71%

  • CMSD

    0.1100

    22.26

    +0.49%

2026 Tunkillia Development Drilling Programs Begin
2026 Tunkillia Development Drilling Programs Begin

2026 Tunkillia Development Drilling Programs Begin

Targeting Ore Reserves, PFS and ML application by the end of 2026

HIGHLIGHTS

  • May 2025 Optimised Scoping Study (OSS) outlined a compelling Tunkillia development project:1

    • Annual production: ~120,000oz gold and ~250,000oz silver

    • Total LoM operating cash: ~A$2.7 billion (unlevered, pre-tax)

    • Net Present Value (NPV7.5%): ~A$1.4 billion (unlevered, pre-tax)

    • Internal Rate of Return (IRR): ~73.2% (unlevered, pre-tax); and

    • Payback period: ~0.8 years (unlevered, pre-tax)

  • Barton expediting Tunkillia toward Mining Lease (ML) application, with AUD gold and silver prices now over $1,500/oz and $50/oz higher (respectively) than used for OSS revenue estimates1

  • ~900m water drilling has started, targeting potential new water sources near OSS open pits

  • ~28,000m second phase reverse circulation (RC) Resource upgrade drilling to begin March 2026, with ~3,000m Resource, geotechnical & metallurgical diamond drilling (DD) to start in parallel

  • Targeting JORC (2012) Ore Reserves, pre-feasibility study (PFS) & ML application by end of 2026

Text size:

ADELAIDE, AU / ACCESS Newswire / February 2, 2026 / Barton Gold Holdings Limited (ASX:BGD)(OTCQB:BGDFF)(FRA:BGD3) (Barton or Company) is pleased to announce the start of water bore drilling at its South Australian Tunkillia Gold Project (Tunkillia). Underdale Drillers has been engaged to complete a program totalling ~900m drilling for preliminary water testing. Success in locating additional sources of nearby water has the potential to both de-risk and improve project economics.

Barton is also pleased to confirm that Tunkillia's planned second phase JORC (2012) Mineral Resource upgrade drilling will start as planned during March 2026, with ~28,000m RC drilling targeting the conversion of the balance of Tunkillia's OSS modelled open pit mineralisation (beyond S1 / S2) to JORC (2012) 'Indicated' category.2

A ~3,000m diamond drilling (DD) program is planned to run in parallel with phase 2 RC drilling, targeting the infill and expansion of Tunkillia's geotechnical and metallurgical databases in support of further open pit design optimisation, detailed recovery and production modelling, and a PFS and ML application by the end of 2026.

Commenting on Tunkillia's 2026 development drilling programs, Barton MD Alexander Scanlon said:

"The Tunkillia OSS demonstrated the financial and capital leverage available to large-scale bulk processing operations, with the major advantage of a higher-grade 'Starter Pit' that can pay back development costs 2x over in the first year.

"With recent Resource upgrade drilling results further de-risking this profile, we are advancing our other development drilling programs in support of planned JORC Ore Reserves, a PFS, and a Mining Lease application by the end of 2026.

"Following the submission of our Mining Lease application, we will expedite Tunkillia's project finance discussions in parallel with our targeted reinstatement of 'Stage 1' operations at our neighbouring Challenger Gold Project. Our objective is to bring Tunkillia online as soon as possible to realise our gold production target of 150,000oz annually."

Program background

Tunkillia's May 2025 OSS outlined a compelling development profile, with its S1 and S2 pits modelled to produce 365,000oz gold, 923,000oz silver and $1.3bn operating free cash during the first ~27 months alone at an average cash cost of only A$1,429/oz Au.1 These pit could therefore pay back development 3x over in this time. 2026 development drilling programs follow recent 'phase 1' RC upgrade drilling (key detailed results below).2

Fig. 1 - Location of 2025 Phase 1 RC upgrade drilling (green polygon) on main optimised open pit4

Hole ID

Interval

Including:

TKB0257

23m @ 2.25 g/t Au from 62 metres

2m @ 5.45 g/t Au from 69 metres, and

1m @ 7.50 g/t Au from 75 metres, and

1m @ 8.90 g/t Au from 81 metres

TKB0268

22m @ 2.43 g/t Au from 100 metres

1m @ 17.6 g/t Au from 107 metres

TKB0269

28m @ 2.60 g/t Au from 129 metres

2m @ 20.9 g/t Au from 144 metres

TKB0282

27m @ 2.68 g/t Au from 60 metres, and

44m @ 3.68 g/t Au from 103 metres

2m @ 38.7 g/t Au from 73 metres

3m @ 23.5 g/t Au from 123 metres, and

1m @ 18.9 g/t Au from 131 metres, and

2m @ 13.2 g/t Au from 136 metres

TKB0285

47m @ 2.67 g/t Au from 97 metres

16m @ 5.03 g/t Au from 126 metres

TKB0292

41m @ 2.21 g/t Au from 47 metres

7m @ 9.61 g/t Au from 47 metres

TKB0301

10m @ 7.37 g/t Au from 65 metres

1m @ 28.8 g/t Au from 67 metres

TKB0306

10m @ 5.03 g/t Au from 152 metres, and

13m @ 3.75 g/t Au from 165 metres

1m @ 43.2 g/t Au from 154 metres

1m @ 37.1 g/t Au from 165 metres

TKB0375

10m @ 5.21 g/t Au from 45 metres

3m @ 9.70 g/t Au from 49 metres

TKB0376

17m @ 2.23 g/t Au from 53 metres

3m @ 8.97 g/t Au from 58 metres

TKB0390

20m @ 2.72 g/t Au from 44 metres

3m @ 9.33 g/t Au from 50 metres

TKB0422

24m @ 4.49 g/t Au from 127 metres, and

22m @ 3.17 g/t Au from 156 metres

1m @ 15.4 g/t Au from 137 metres, and

5m @ 11.5 g/t Au from 143 metres

8m @ 6.89 g/t Au from 157 metres

TKB0434

22m @ 2.58 g/t Au from 68 metres

1m @ 6.3 g/t Au from 73 metres, and

3m @ 9.2 g/t Au from 75 metres

Table 1 - Key significant assays from Tunkillia Phase 1 Mineral Resource upgrade RC drilling4

Further details of Tunkillia's planned phase 2 RC upgrade drilling and DD drilling will be published in due course.

Authorised by the Board of Directors of Barton Gold Holdings Limited.

For further information, please contact:

Alexander Scanlon
Managing Director
[email protected]
+61 425 226 649

Jade Cook
Company Secretary
[email protected]
+61 8 9322 1587

1 Refer to ASX announcement dated 5 May 2025

2 Refer to ASX announcements dated 2 / 16 December 2025 and 21 January 2026

3 Refer to ASX announcements dated 2 / 16 December 2025 and 21 January 2026

About Barton Gold

Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000ozpa with 2.2Moz Au & 3.1Moz Ag JORC Mineral Resources (79.9Mt @ 0.87g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia.*

Challenger Gold Project

  • 313koz Au + fully permitted Central Gawler Mill (CGM)

Tarcoola Gold Project

  • 20koz Au in fully permitted open pit mine near CGM

  • Tolmer discovery grades up to 84g/t Au & 17,600g/t Ag

Tunkillia Gold Project

  • 1.6Moz Au & 3.1Moz Ag JORC Mineral Resources

  • Competitive 120kozpa gold & 250kozpa silver project

Wudinna Gold Project

  • 279koz Au project located southeast of Tunkillia

  • Significant optionality, adjacent to main highway

Competent Persons Statement & Previously Reported Information

The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 (JORC).

Activity

Competent Person

Membership

Status

Tarcoola Mineral Resource (Stockpiles)

Dr Andrew Fowler (Consultant)

AusIMM

Member

Tarcoola Mineral Resource (Perseverance Mine)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Tarcoola Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tarcoola Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tunkillia Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Mineral Resource

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (above 215mRL)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (below 90mRL)

Mr Dale Sims

AusIMM / AIG

Fellow / Member

Wudinna Mineral Resource (Clarke Deposit)

Ms Justine Tracey

AusIMM

Member

Wudinna Mineral Resource (all other Deposits)

Mrs Christine Standing

AusIMM / AIG

Member / Member

The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. In accordance with ASX Listing Rule 5.19.2, the Company further confirms that the material assumptions underpinning any production targets and the forecast financial information derived therefrom continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.

Cautionary Statement Regarding Forward-Looking Information

This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.

* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 8 September 2025. Total Barton JORC (2012) Mineral Resources include 1,049koz Au (39.7Mt @ 0.82 g/t Au) in Indicated category and 1,186koz Au (40.2Mt @ 0.92 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.

SOURCE: Barton Gold Holdings Limited



View the original press release on ACCESS Newswire

P.McDonald--TFWP