The Fort Worth Press - 2026 Tunkillia Development Drilling Programs Begin

USD -
AED 3.672496
AFN 65.999806
ALL 80.065663
AMD 364.508186
ANG 1.789783
AOA 917.00022
ARS 1494.993551
AUD 1.414697
AWG 1.8
AZN 1.701613
BAM 1.689756
BBD 2.014385
BDT 122.018757
BGN 1.696366
BHD 0.377122
BIF 2988.381635
BMD 1
BND 1.277847
BOB 11.57636
BRL 5.2128
BSD 1.000151
BTN 95.647328
BWP 13.500659
BYN 3.042032
BYR 19600
BZD 2.011491
CAD 1.38791
CDF 2270.000115
CHF 0.810845
CLF 0.023463
CLP 923.440076
CNY 6.743299
CNH 6.741275
COP 3104.88
CRC 449.263467
CUC 1
CUP 26.5
CVE 95.26422
CZK 20.87201
DJF 178.102253
DKK 6.44984
DOP 58.749838
DZD 132.909333
EGP 50.536797
ERN 15
ETB 161.789969
EUR 0.86277
FJD 2.210497
FKP 0.738395
GBP 0.738265
GEL 2.605005
GGP 0.738395
GHS 11.051977
GIP 0.738395
GMD 73.999672
GNF 8785.692687
GTQ 7.628839
GYD 209.246268
HKD 7.84389
HNL 26.815845
HRK 6.501403
HTG 130.826022
HUF 315.642037
IDR 17830
ILS 2.99085
IMP 0.738395
INR 95.707199
IQD 1310.230424
IRR 1374575.000079
ISK 122.690146
JEP 0.738395
JMD 158.034569
JOD 0.709008
JPY 159.236503
KES 129.4971
KGS 87.449576
KHR 4046.085458
KMF 426.000436
KPW 900.000294
KRW 1397.419776
KWD 0.30879
KYD 0.83347
KZT 461.929241
LAK 22540.358638
LBP 89562.572897
LKR 331.975446
LRD 181.52836
LSL 16.225328
LTL 2.95274
LVL 0.60489
LYD 6.372767
MAD 9.292836
MDL 17.252581
MGA 4307.838521
MKD 53.155873
MMK 2099.245957
MNT 3597.150887
MOP 8.080143
MRU 40.111452
MUR 46.979692
MVR 15.45959
MWK 1734.310807
MXN 17.05922
MYR 4.063021
MZN 63.904984
NAD 16.225258
NGN 1350.239844
NIO 36.798687
NOK 9.401945
NPR 153.035552
NZD 1.703305
OMR 0.3845
PAB 1.000134
PEN 3.368483
PGK 4.494363
PHP 61.827039
PKR 277.569951
PLN 3.732885
PYG 6034.084282
QAR 3.655881
RON 4.523599
RSD 101.201289
RUB 84.90037
RWF 1473.727865
SAR 3.746587
SBD 8.025811
SCR 13.860891
SDG 601.474966
SEK 9.52765
SGD 1.276725
SHP 0.740866
SLE 24.649879
SLL 20969.499227
SOS 571.623589
SRD 37.966977
STD 20697.981008
STN 21.167221
SVC 8.751096
SYP 13001.999906
SZL 16.213578
THB 33.127958
TJS 9.241263
TMT 3.5
TND 2.929025
TOP 2.40776
TRY 47.931603
TTD 6.782238
TWD 31.901398
TZS 2647.976038
UAH 44.802989
UGX 3730.646945
UYU 40.347315
UZS 11821.830168
VES 771.57685
VND 26178
VUV 118.215486
WST 2.715898
XAF 566.748027
XAG 0.015938
XAU 0.00023
XCD 2.70255
XCG 1.802528
XDR 0.707052
XOF 566.738234
XPF 103.038184
YER 237.10406
ZAR 16.25505
ZMK 9001.202246
ZMW 18.677668
ZWL 321.999592
  • CMSC

    -0.1200

    21.24

    -0.56%

  • BP

    0.5600

    43.41

    +1.29%

  • CMSD

    -0.0900

    21.09

    -0.43%

  • VOD

    -0.0700

    16.13

    -0.43%

  • NGG

    0.8600

    82.15

    +1.05%

  • JRI

    -0.0400

    12.44

    -0.32%

  • BCE

    0.0100

    23.36

    +0.04%

  • BTI

    0.6500

    56.38

    +1.15%

  • RBGPF

    0.3500

    69

    +0.51%

  • RELX

    0.9500

    34.51

    +2.75%

  • RYCEF

    -0.2500

    20.81

    -1.2%

  • RIO

    -0.5200

    96.69

    -0.54%

  • BCC

    -1.7600

    80.18

    -2.2%

  • AZN

    3.2100

    160.1

    +2%

  • GSK

    0.8700

    51.15

    +1.7%

2026 Tunkillia Development Drilling Programs Begin
2026 Tunkillia Development Drilling Programs Begin

2026 Tunkillia Development Drilling Programs Begin

Targeting Ore Reserves, PFS and ML application by the end of 2026

HIGHLIGHTS

  • May 2025 Optimised Scoping Study (OSS) outlined a compelling Tunkillia development project:1

    • Annual production: ~120,000oz gold and ~250,000oz silver

    • Total LoM operating cash: ~A$2.7 billion (unlevered, pre-tax)

    • Net Present Value (NPV7.5%): ~A$1.4 billion (unlevered, pre-tax)

    • Internal Rate of Return (IRR): ~73.2% (unlevered, pre-tax); and

    • Payback period: ~0.8 years (unlevered, pre-tax)

  • Barton expediting Tunkillia toward Mining Lease (ML) application, with AUD gold and silver prices now over $1,500/oz and $50/oz higher (respectively) than used for OSS revenue estimates1

  • ~900m water drilling has started, targeting potential new water sources near OSS open pits

  • ~28,000m second phase reverse circulation (RC) Resource upgrade drilling to begin March 2026, with ~3,000m Resource, geotechnical & metallurgical diamond drilling (DD) to start in parallel

  • Targeting JORC (2012) Ore Reserves, pre-feasibility study (PFS) & ML application by end of 2026

Text size:

ADELAIDE, AU / ACCESS Newswire / February 2, 2026 / Barton Gold Holdings Limited (ASX:BGD)(OTCQB:BGDFF)(FRA:BGD3) (Barton or Company) is pleased to announce the start of water bore drilling at its South Australian Tunkillia Gold Project (Tunkillia). Underdale Drillers has been engaged to complete a program totalling ~900m drilling for preliminary water testing. Success in locating additional sources of nearby water has the potential to both de-risk and improve project economics.

Barton is also pleased to confirm that Tunkillia's planned second phase JORC (2012) Mineral Resource upgrade drilling will start as planned during March 2026, with ~28,000m RC drilling targeting the conversion of the balance of Tunkillia's OSS modelled open pit mineralisation (beyond S1 / S2) to JORC (2012) 'Indicated' category.2

A ~3,000m diamond drilling (DD) program is planned to run in parallel with phase 2 RC drilling, targeting the infill and expansion of Tunkillia's geotechnical and metallurgical databases in support of further open pit design optimisation, detailed recovery and production modelling, and a PFS and ML application by the end of 2026.

Commenting on Tunkillia's 2026 development drilling programs, Barton MD Alexander Scanlon said:

"The Tunkillia OSS demonstrated the financial and capital leverage available to large-scale bulk processing operations, with the major advantage of a higher-grade 'Starter Pit' that can pay back development costs 2x over in the first year.

"With recent Resource upgrade drilling results further de-risking this profile, we are advancing our other development drilling programs in support of planned JORC Ore Reserves, a PFS, and a Mining Lease application by the end of 2026.

"Following the submission of our Mining Lease application, we will expedite Tunkillia's project finance discussions in parallel with our targeted reinstatement of 'Stage 1' operations at our neighbouring Challenger Gold Project. Our objective is to bring Tunkillia online as soon as possible to realise our gold production target of 150,000oz annually."

Program background

Tunkillia's May 2025 OSS outlined a compelling development profile, with its S1 and S2 pits modelled to produce 365,000oz gold, 923,000oz silver and $1.3bn operating free cash during the first ~27 months alone at an average cash cost of only A$1,429/oz Au.1 These pit could therefore pay back development 3x over in this time. 2026 development drilling programs follow recent 'phase 1' RC upgrade drilling (key detailed results below).2

Fig. 1 - Location of 2025 Phase 1 RC upgrade drilling (green polygon) on main optimised open pit4

Hole ID

Interval

Including:

TKB0257

23m @ 2.25 g/t Au from 62 metres

2m @ 5.45 g/t Au from 69 metres, and

1m @ 7.50 g/t Au from 75 metres, and

1m @ 8.90 g/t Au from 81 metres

TKB0268

22m @ 2.43 g/t Au from 100 metres

1m @ 17.6 g/t Au from 107 metres

TKB0269

28m @ 2.60 g/t Au from 129 metres

2m @ 20.9 g/t Au from 144 metres

TKB0282

27m @ 2.68 g/t Au from 60 metres, and

44m @ 3.68 g/t Au from 103 metres

2m @ 38.7 g/t Au from 73 metres

3m @ 23.5 g/t Au from 123 metres, and

1m @ 18.9 g/t Au from 131 metres, and

2m @ 13.2 g/t Au from 136 metres

TKB0285

47m @ 2.67 g/t Au from 97 metres

16m @ 5.03 g/t Au from 126 metres

TKB0292

41m @ 2.21 g/t Au from 47 metres

7m @ 9.61 g/t Au from 47 metres

TKB0301

10m @ 7.37 g/t Au from 65 metres

1m @ 28.8 g/t Au from 67 metres

TKB0306

10m @ 5.03 g/t Au from 152 metres, and

13m @ 3.75 g/t Au from 165 metres

1m @ 43.2 g/t Au from 154 metres

1m @ 37.1 g/t Au from 165 metres

TKB0375

10m @ 5.21 g/t Au from 45 metres

3m @ 9.70 g/t Au from 49 metres

TKB0376

17m @ 2.23 g/t Au from 53 metres

3m @ 8.97 g/t Au from 58 metres

TKB0390

20m @ 2.72 g/t Au from 44 metres

3m @ 9.33 g/t Au from 50 metres

TKB0422

24m @ 4.49 g/t Au from 127 metres, and

22m @ 3.17 g/t Au from 156 metres

1m @ 15.4 g/t Au from 137 metres, and

5m @ 11.5 g/t Au from 143 metres

8m @ 6.89 g/t Au from 157 metres

TKB0434

22m @ 2.58 g/t Au from 68 metres

1m @ 6.3 g/t Au from 73 metres, and

3m @ 9.2 g/t Au from 75 metres

Table 1 - Key significant assays from Tunkillia Phase 1 Mineral Resource upgrade RC drilling4

Further details of Tunkillia's planned phase 2 RC upgrade drilling and DD drilling will be published in due course.

Authorised by the Board of Directors of Barton Gold Holdings Limited.

For further information, please contact:

Alexander Scanlon
Managing Director
[email protected]
+61 425 226 649

Jade Cook
Company Secretary
[email protected]
+61 8 9322 1587

1 Refer to ASX announcement dated 5 May 2025

2 Refer to ASX announcements dated 2 / 16 December 2025 and 21 January 2026

3 Refer to ASX announcements dated 2 / 16 December 2025 and 21 January 2026

About Barton Gold

Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000ozpa with 2.2Moz Au & 3.1Moz Ag JORC Mineral Resources (79.9Mt @ 0.87g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia.*

Challenger Gold Project

  • 313koz Au + fully permitted Central Gawler Mill (CGM)

Tarcoola Gold Project

  • 20koz Au in fully permitted open pit mine near CGM

  • Tolmer discovery grades up to 84g/t Au & 17,600g/t Ag

Tunkillia Gold Project

  • 1.6Moz Au & 3.1Moz Ag JORC Mineral Resources

  • Competitive 120kozpa gold & 250kozpa silver project

Wudinna Gold Project

  • 279koz Au project located southeast of Tunkillia

  • Significant optionality, adjacent to main highway

Competent Persons Statement & Previously Reported Information

The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 (JORC).

Activity

Competent Person

Membership

Status

Tarcoola Mineral Resource (Stockpiles)

Dr Andrew Fowler (Consultant)

AusIMM

Member

Tarcoola Mineral Resource (Perseverance Mine)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Tarcoola Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tarcoola Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tunkillia Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Mineral Resource

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (above 215mRL)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (below 90mRL)

Mr Dale Sims

AusIMM / AIG

Fellow / Member

Wudinna Mineral Resource (Clarke Deposit)

Ms Justine Tracey

AusIMM

Member

Wudinna Mineral Resource (all other Deposits)

Mrs Christine Standing

AusIMM / AIG

Member / Member

The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. In accordance with ASX Listing Rule 5.19.2, the Company further confirms that the material assumptions underpinning any production targets and the forecast financial information derived therefrom continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.

Cautionary Statement Regarding Forward-Looking Information

This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.

* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 8 September 2025. Total Barton JORC (2012) Mineral Resources include 1,049koz Au (39.7Mt @ 0.82 g/t Au) in Indicated category and 1,186koz Au (40.2Mt @ 0.92 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.

SOURCE: Barton Gold Holdings Limited



View the original press release on ACCESS Newswire

P.McDonald--TFWP