The Fort Worth Press - Resource Upgrade Drilling Begins on Challenger Open Pits

USD -
AED 3.672981
AFN 66.000171
ALL 82.019997
AMD 379.02976
ANG 1.79008
AOA 916.999904
ARS 1451.994901
AUD 1.43829
AWG 1.8
AZN 1.694157
BAM 1.650151
BBD 2.016242
BDT 122.43245
BGN 1.67937
BHD 0.376966
BIF 2964.5
BMD 1
BND 1.271584
BOB 6.942435
BRL 5.257897
BSD 1.001076
BTN 91.544186
BWP 13.176113
BYN 2.86646
BYR 19600
BZD 2.013297
CAD 1.367005
CDF 2154.999546
CHF 0.77952
CLF 0.021922
CLP 865.610144
CNY 6.946501
CNH 6.940985
COP 3613.38
CRC 496.70313
CUC 1
CUP 26.5
CVE 93.874961
CZK 20.602967
DJF 177.720388
DKK 6.332825
DOP 62.950123
DZD 129.967015
EGP 47.081867
ERN 15
ETB 155.249858
EUR 0.847981
FJD 2.23125
FKP 0.729754
GBP 0.731695
GEL 2.69501
GGP 0.729754
GHS 10.95505
GIP 0.729754
GMD 73.525034
GNF 8751.000082
GTQ 7.681242
GYD 209.445862
HKD 7.80986
HNL 26.450481
HRK 6.390901
HTG 131.200378
HUF 323.15983
IDR 16767.3
ILS 3.10084
IMP 0.729754
INR 90.410303
IQD 1310.5
IRR 42125.000158
ISK 123.209759
JEP 0.729754
JMD 157.178897
JOD 0.708991
JPY 155.592501
KES 129.129928
KGS 87.45041
KHR 4025.497068
KMF 417.999723
KPW 900
KRW 1452.069641
KWD 0.30718
KYD 0.834223
KZT 505.528533
LAK 21494.999979
LBP 85549.99973
LKR 310.004134
LRD 186.000109
LSL 16.109496
LTL 2.95274
LVL 0.60489
LYD 6.319959
MAD 9.15875
MDL 16.948552
MGA 4449.999742
MKD 52.270703
MMK 2099.986463
MNT 3564.625242
MOP 8.053239
MRU 39.930025
MUR 45.549721
MVR 15.450202
MWK 1737.00034
MXN 17.396615
MYR 3.9415
MZN 63.749849
NAD 16.109846
NGN 1391.169997
NIO 36.703014
NOK 9.696325
NPR 146.471315
NZD 1.665185
OMR 0.384497
PAB 1.00108
PEN 3.365984
PGK 4.238019
PHP 58.845981
PKR 279.749591
PLN 3.58084
PYG 6656.120146
QAR 3.64125
RON 4.321202
RSD 99.575033
RUB 76.449719
RWF 1453
SAR 3.750233
SBD 8.058101
SCR 14.250149
SDG 601.503025
SEK 8.965695
SGD 1.272135
SHP 0.750259
SLE 24.475014
SLL 20969.499267
SOS 571.498421
SRD 38.024962
STD 20697.981008
STN 21.25
SVC 8.759629
SYP 11059.574895
SZL 16.110107
THB 31.593954
TJS 9.349825
TMT 3.51
TND 2.847502
TOP 2.40776
TRY 43.465705
TTD 6.777673
TWD 31.594989
TZS 2588.490252
UAH 43.112529
UGX 3575.692379
UYU 38.836508
UZS 12250.000214
VES 369.79158
VND 26020
VUV 119.156711
WST 2.710781
XAF 553.468475
XAG 0.012518
XAU 0.000214
XCD 2.70255
XCG 1.80413
XDR 0.687215
XOF 551.49985
XPF 101.749774
YER 238.375011
ZAR 16.08659
ZMK 9001.201531
ZMW 19.646044
ZWL 321.999592
  • SCS

    0.0200

    16.14

    +0.12%

  • RBGPF

    0.1000

    82.5

    +0.12%

  • CMSC

    -0.0100

    23.75

    -0.04%

  • RYCEF

    0.7000

    16.7

    +4.19%

  • VOD

    0.2600

    14.91

    +1.74%

  • NGG

    -0.6600

    84.61

    -0.78%

  • CMSD

    0.0300

    24.08

    +0.12%

  • RELX

    -0.2700

    35.53

    -0.76%

  • BCE

    -0.0300

    25.83

    -0.12%

  • RIO

    1.4900

    92.52

    +1.61%

  • BCC

    0.9400

    81.75

    +1.15%

  • JRI

    0.0700

    13.15

    +0.53%

  • AZN

    1.3100

    188.41

    +0.7%

  • BTI

    0.3100

    60.99

    +0.51%

  • GSK

    0.8700

    52.47

    +1.66%

  • BP

    -0.1800

    37.7

    -0.48%

Resource Upgrade Drilling Begins on Challenger Open Pits
Resource Upgrade Drilling Begins on Challenger Open Pits

Resource Upgrade Drilling Begins on Challenger Open Pits

Targeting Initial 'Stage 1' Ore Reserves and DFS by 30 June 2026

HIGHLIGHTS

  • DFS underway following dual Challenger JORC (2012) Mineral Resources upgrades to 313koz Au[1]

  • Up to 8,000m reverse circulation (RC) drilling to target Challenger 'Main', 'Challenger West' (CW) open pits, plus open pit targets at 'Challenger South-Southwest' (CSSW) and 'Challenger 3'1

  • DFS objective to establish viable, simplified 'baseline' Stage 1 operation to underwrite restart of CGM and maximise Challenger, Tarcoola, Wudinna & Tolmer development optionality

  • Discussions underway with credit, minerals trading, and other investment groups interested to finance Stage 1 operations; targeting JORC (2012) Ore Reserves and a DFS by 30 June 2026

 

Text size:

ADELAIDE, AU / ACCESS Newswire / February 1, 2026 / Barton Gold Holdings Limited (ASX:BGD)(OTCQB:BGDFF)(FRA:BGD3) (Barton or Company) is pleased to announce the start of JORC upgrade drilling at its South Australian Challenger Gold Project (Challenger), which is adjacent to its wholly-owned Central Gawler Mill (CGM). Kennedy Drilling has been engaged for the program.

Up to 8,000m RC drilling will target conversion of easily accessible mineralisation on existing open pits and other near-surface targets to JORC (2012) 'Indicated' categories, for the potential conversion of these materials to JORC (2012) Ore Reserves subject to the completion of an ongoing Definitive Feasibility Study (DFS).

The design concept of the DFS is to commence an initial 3 - 4 year Stage 1 'baseline' operation utilising only historical higher-grade tailings from tailings storage facility 1 (TSF1) and limited, near-surface materials without disturbing Challenger's historical high-grade underground mine, its mineralisation or its infrastructure access.

The objective of the DFS is to establish relatively low-risk, simplified development plan to restart the CGM, bring Barton to 'producer' status, and maximise 'Stage 1' development optionality during the next 3 - 10 years. This model also has the benefit of deferring the technical risk and cost of underground operations to a future date, following the de-risking of 'Stage 1' operations, and providing further time to optimise development plans.

Reinstatement of the CGM also materially enhances the development optionality of Barton's several 'regional enhancement' assets such as the Tarcoola Gold Project (Tarcoola), the Wudinna Gold Project (Wudinna) and high-grade Tolmer silver prospect (Tolmer) all of which could potentially be processed through the CGM.[2]

Commenting on Challenger's Resource upgrade drilling programs, Barton MD Alexander Scanlon said:

"Recent Challenger Resource updates demonstrate considerable on-pit and near-surface gold mineralisation adjacent to our Central Gawler Mill. Our objective is to commence an initial 'baseline' operation which minimises both cost and risk, while maximising development optionality for the Challenger underground mine, Tarcoola, Tolmer and Wudinna.

"We have now moved straight to a DFS for reinstatement of the CGM - the region's only existing gold mill - to enhance this broader optionality and also to capitalise on record gold and silver prices. We are targeting initial 'Stage 1' Ore Reserves and a DFS by 30 June 2026, and project financing shortly thereafter. In parallel, we are rapidly advancing our neighbouring large-scale Tunkillia Gold Project, targeting a Mining Lease application by the end of 2026."

Program background

During September 2025 Barton published a new Challenger JORC (2012) Mineral Resources Estimate (MRE) of 313koz Au (10.6Mt @ 0.92 g/t), with almost all MRE mineralisation located in, on, or adjacent to, existing serviceable open pit and underground development.[3]

All mineralisation is adjacent to the Company's Central Gawler Mill (CGM). The updated MRE excludes various lower-grade stockpiles and higher-grade mill residuals (eg. ball mill rejects) which are located on the Run of Mine (ROM) pad. These materials will likely form a component of early mill feed as the hard rock crushing and grinding circuits are recommissioned for the start of Phase 2 (fresh rock) operations.

Figure 1 - Challenger site map with locations of key infrastructure and JORC (2012) MRE deposits 3

Authorised by the Board of Directors of Barton Gold Holdings Limited.

For further information, please contact:

Alexander Scanlon
Managing Director
[email protected]
+61 425 226 649

Jade Cook
Company Secretary
[email protected]
+61 8 9322 1587

About Barton Gold

Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000ozpa with 2.2Moz Au & 3.1Moz Ag JORC Mineral Resources (79.9Mt @ 0.87g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia.*

Challenger Gold Project

  • 313koz Au + fully permitted Central Gawler Mill (CGM)

Tarcoola Gold Project

  • 20koz Au in fully permitted open pit mine near CGM

  • Tolmer discovery grades up to 84g/t Au & 17,600g/t Ag

Tunkillia Gold Project

  • 1.6Moz Au & 3.1Moz Ag JORC Mineral Resources

  • Competitive 120kozpa gold & 250kozpa silver project

Wudinna Gold Project

  • 279koz Au project located southeast of Tunkillia

  • Significant optionality, adjacent to main highway

Competent Persons Statement & Previously Reported Information

The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 (JORC).

Activity

Competent Person

Membership

Status

Tarcoola Mineral Resource (Stockpiles)

Dr Andrew Fowler (Consultant)

AusIMM

Member

Tarcoola Mineral Resource (Perseverance Mine)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Tarcoola Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tarcoola Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tunkillia Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Mineral Resource

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (above 215mRL)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (below 90mRL)

Mr Dale Sims

AusIMM / AIG

Fellow / Member

Wudinna Mineral Resource (Clarke Deposit)

Ms Justine Tracey

AusIMM

Member

Wudinna Mineral Resource (all other Deposits)

Mrs Christine Standing

AusIMM / AIG

Member / Member

The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. In accordance with ASX Listing Rule 5.19.2, the Company further confirms that the material assumptions underpinning any production targets and the forecast financial information derived therefrom continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.

Cautionary Statement Regarding Forward-Looking Information

This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.

[1] Refer to ASX announcements dated 30 June and 8 / 28 September 2025

[2] Refer to Prospectus and ASX announcements dated 27 March, 15 April, 30 June, 2 / 8 / 25 July, 5 / 6 August and 10 / 23 September 2025

[3] Refer to ASX announcement dated 10 September 2025

* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 8 September 2025. Total Barton JORC (2012) Mineral Resources include 1,049koz Au (39.7Mt @ 0.82 g/t Au) in Indicated category and 1,186koz Au (40.2Mt @ 0.92 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.

SOURCE: Barton Gold Holdings Limited



View the original press release on ACCESS Newswire

S.Jordan--TFWP