The Fort Worth Press - Inventus Provides Operational Update as Trench 1 Bulk Sample Processing Underway and Drilling Continues at the Pardo "River of Gold" Project

USD -
AED 3.672495
AFN 63.501471
ALL 83.072963
AMD 375.623475
ANG 1.790083
AOA 917.00026
ARS 1390.220498
AUD 1.447534
AWG 1.8
AZN 1.70702
BAM 1.695072
BBD 2.009612
BDT 122.428639
BGN 1.709309
BHD 0.377609
BIF 2964.709145
BMD 1
BND 1.2851
BOB 6.894519
BRL 5.157597
BSD 0.997742
BTN 92.939509
BWP 13.688562
BYN 2.956504
BYR 19600
BZD 2.006665
CAD 1.39245
CDF 2296.000206
CHF 0.798503
CLF 0.023224
CLP 917.000289
CNY 6.885601
CNH 6.883785
COP 3662.46
CRC 464.279833
CUC 1
CUP 26.5
CVE 95.56558
CZK 21.243197
DJF 177.673004
DKK 6.47623
DOP 60.312178
DZD 133.062353
EGP 54.2572
ERN 15
ETB 155.800822
EUR 0.866597
FJD 2.253795
FKP 0.750158
GBP 0.755625
GEL 2.685051
GGP 0.750158
GHS 10.970563
GIP 0.750158
GMD 74.000249
GNF 8752.513347
GTQ 7.632939
GYD 208.828972
HKD 7.83835
HNL 26.504427
HRK 6.530905
HTG 130.952897
HUF 333.138986
IDR 16998
ILS 3.136798
IMP 0.750158
INR 92.598303
IQD 1307.141959
IRR 1319125.000189
ISK 125.149716
JEP 0.750158
JMD 157.303566
JOD 0.708984
JPY 159.617504
KES 129.794813
KGS 87.448802
KHR 3990.137323
KMF 426.999768
KPW 899.994443
KRW 1507.020477
KWD 0.30934
KYD 0.831502
KZT 472.805432
LAK 21970.392969
LBP 89502.03926
LKR 314.804623
LRD 183.088277
LSL 16.955078
LTL 2.95274
LVL 0.60489
LYD 6.380628
MAD 9.374033
MDL 17.55613
MGA 4171.343141
MKD 53.422776
MMK 2099.621061
MNT 3572.314592
MOP 8.055104
MRU 39.637211
MUR 46.940105
MVR 15.460021
MWK 1730.071718
MXN 17.856596
MYR 4.033014
MZN 63.950312
NAD 16.954711
NGN 1378.25967
NIO 36.712196
NOK 9.734315
NPR 148.701282
NZD 1.75133
OMR 0.384545
PAB 0.997734
PEN 3.45194
PGK 4.316042
PHP 60.464505
PKR 278.39991
PLN 3.70718
PYG 6454.29687
QAR 3.638018
RON 4.417499
RSD 101.772347
RUB 80.207393
RWF 1457.240049
SAR 3.754249
SBD 8.038772
SCR 14.425806
SDG 601.000172
SEK 9.43173
SGD 1.28546
SHP 0.750259
SLE 24.650044
SLL 20969.510825
SOS 570.192924
SRD 37.35103
STD 20697.981008
STN 21.233539
SVC 8.730169
SYP 110.548921
SZL 16.948198
THB 32.646041
TJS 9.563492
TMT 3.51
TND 2.941459
TOP 2.40776
TRY 44.5833
TTD 6.768937
TWD 31.972943
TZS 2600.000206
UAH 43.698134
UGX 3743.234401
UYU 40.405091
UZS 12122.393971
VES 473.390498
VND 26342.5
VUV 120.132513
WST 2.770875
XAF 568.506489
XAG 0.013691
XAU 0.000214
XCD 2.70255
XCG 1.798209
XDR 0.70704
XOF 568.516344
XPF 103.361457
YER 238.65028
ZAR 16.94973
ZMK 9001.198572
ZMW 19.281421
ZWL 321.999592
  • RBGPF

    -13.5000

    69

    -19.57%

  • JRI

    0.0900

    12.61

    +0.71%

  • BCC

    -1.8800

    73.2

    -2.57%

  • NGG

    1.1500

    87.99

    +1.31%

  • AZN

    2.7600

    203.49

    +1.36%

  • BTI

    0.3900

    58.28

    +0.67%

  • BCE

    -0.9300

    24.45

    -3.8%

  • GSK

    0.7000

    56.69

    +1.23%

  • CMSC

    0.0500

    22.04

    +0.23%

  • RIO

    -0.3600

    94.45

    -0.38%

  • RELX

    0.3600

    33.59

    +1.07%

  • CMSD

    0.1100

    22.26

    +0.49%

  • VOD

    0.0800

    15.21

    +0.53%

  • RYCEF

    0.9000

    15.99

    +5.63%

  • BP

    0.9500

    47.12

    +2.02%

Inventus Provides Operational Update as Trench 1 Bulk Sample Processing Underway and Drilling Continues at the Pardo "River of Gold" Project
Inventus Provides Operational Update as Trench 1 Bulk Sample Processing Underway and Drilling Continues at the Pardo "River of Gold" Project

Inventus Provides Operational Update as Trench 1 Bulk Sample Processing Underway and Drilling Continues at the Pardo "River of Gold" Project

TORONTO, ON / ACCESS Newswire / January 27, 2026 / Inventus Mining Corp. (TSXV:IVS) ("Inventus" or the "Company")is pleased announce that processing of the Trench 1 bulk sample is underway at its 100%-owned Pardo "River of Gold" Project, located 65 km northeast of Sudbury, Ontario.

Text size:

Highlights

  • Trench 1bulk sample processing is currently underway at McEwen Inc.'s Stock Mill

  • An additional seven (7) drill holes have been completed subsequent to the Company's January 22, 2026 news release, for a total of 47 drill holes with assay results pending

  • Trench 1 Northbulk sample advancing, with waste successfully blasted and removed and extract of the gold mineralization expected to commence shortly

  • Bulk sampling and drilling continue to advance in parallel, supporting grade validation, metallurgical performance, and near-surface continuity

Bulk Sampling Update

The Company confirms that processing of 5,000 tonnes of the 10,128-tonne Trench 1 bulk sample is currently underway at McEwen Inc.'s Stock Mill. This material was extracted under the Company's 50,000-tonne bulk sample permit, of which only 10,000 tonnes have been processed to date, and represents a key milestone intended to de-risk development assumptions, support grade validation and metallurgical performance, and generate operational cash flow.

In addition, the 10,000-tonneTrench 1 North bulk sample is advancing on time and within budget with waste material now blasted and removed, fully exposing the gold mineralization for extraction and processing. Drilling and blasting of the mineralized material is expected to commence shortly, after which material will be crushed on site, and transported for processing.

Drilling Update

Phase 2 drilling at Pardo continues to expand and define the flat-lying gold mineralization. Since the Company's January 22, 2026 news release, an additional seven (7) drill holes have been completed, further testing continuity in preparation for an initial resource estimate on the property.

Drilling continues to follow a staged approach, beginning with wider-spaced step-out drilling to confirm mineralization, followed by infill drilling for grade estimation and grade-control drilling in advance of future extraction. Assay results from 47 recently completed drill holes are pending and will be reported once received.

Wesley Whymark, President and Head of Exploration, comments:"With Trench 1 processing now underway and Trench 1 North advanced to the extraction phase, we are executing our bulk sampling strategy on time and in budget. At the same time, continued drilling is strengthening our understanding of grade continuity and will support an initial resource estimate for the property. These activities collectively represent an important step in advancing Pardo toward potential development and production."

For further information visit www.inventusmining.com, or contact:

Mr. Wesley Whymark
President, Head of Exploration and Director
Inventus Mining Corp.
E-mail: [email protected]
Phone: 705-822-3005

Mr. Ed Baer
Investor Relations
Inventus Mining
Phone: 416-804-0512

Social Media Accounts

X
LinkedIn
YouTube

About Inventus Mining Corp.

Inventus is a mineral exploration and development company focused on the world-class mining district of Sudbury, Ontario. We have a 100% interest in our principal assets, the Pardo Paleoplacer Gold Project and the Sudbury 2.0 Critical Mineral Project, located northeast of Sudbury. The Pardo Gold Project is the first important paleoplacer gold discovery in North America. Inventus has approximately 207.9 million common shares outstanding.

Qualified Person

The Qualified Person responsible for the technical content of this news release is Inventus' President and Head of Exploration, Wesley Whymark, P.Geo., who has reviewed and approved the technical disclosure in this news release on behalf of the Company.

Forward-Looking Statements

This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "if", "yet", "potential", "undetermined", "objective", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to the failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR+. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither TSX venture exchange nor its regulation services provider (as that term is defined in the policies of the TSX venture exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Inventus Mining Corp.



View the original press release on ACCESS Newswire

S.Palmer--TFWP