The Fort Worth Press - Sun Peak Metals Corp Reports up to 16.35 g/t Gold and 180 g/t Silver From Surface Rock-Chip Samples at the Halahila Project, Saudi Arabia

USD -
AED 3.6725
AFN 66.000063
ALL 82.019444
AMD 379.030024
ANG 1.79008
AOA 917.000222
ARS 1452.1415
AUD 1.436864
AWG 1.8
AZN 1.699581
BAM 1.650151
BBD 2.016242
BDT 122.43245
BGN 1.67937
BHD 0.377035
BIF 2964.5
BMD 1
BND 1.271584
BOB 6.942435
BRL 5.261799
BSD 1.001076
BTN 91.544186
BWP 13.176113
BYN 2.86646
BYR 19600
BZD 2.013297
CAD 1.36714
CDF 2154.999935
CHF 0.778795
CLF 0.021919
CLP 865.500352
CNY 6.946501
CNH 6.938895
COP 3622.05
CRC 496.70313
CUC 1
CUP 26.5
CVE 93.874975
CZK 20.59725
DJF 177.719709
DKK 6.327105
DOP 62.950149
DZD 129.934449
EGP 47.089896
ERN 15
ETB 155.250273
EUR 0.84721
FJD 2.206598
FKP 0.729754
GBP 0.731315
GEL 2.694994
GGP 0.729754
GHS 10.954985
GIP 0.729754
GMD 73.55548
GNF 8751.000245
GTQ 7.681242
GYD 209.445862
HKD 7.810703
HNL 26.449908
HRK 6.386897
HTG 131.200378
HUF 322.735497
IDR 16766.2
ILS 3.10084
IMP 0.729754
INR 90.46795
IQD 1310.5
IRR 42125.000158
ISK 123.039932
JEP 0.729754
JMD 157.178897
JOD 0.709014
JPY 155.4575
KES 129.13006
KGS 87.449831
KHR 4025.492445
KMF 418.000086
KPW 900
KRW 1450.029709
KWD 0.30714
KYD 0.834223
KZT 505.528533
LAK 21494.999879
LBP 85549.999924
LKR 310.004134
LRD 185.999884
LSL 16.110186
LTL 2.95274
LVL 0.60489
LYD 6.320108
MAD 9.15875
MDL 16.948552
MGA 4450.000276
MKD 52.248327
MMK 2099.986463
MNT 3564.625242
MOP 8.053239
MRU 39.929374
MUR 45.650252
MVR 15.450036
MWK 1737.000377
MXN 17.388398
MYR 3.958498
MZN 63.749877
NAD 16.109867
NGN 1391.000271
NIO 36.697378
NOK 9.69397
NPR 146.471315
NZD 1.662775
OMR 0.38451
PAB 1.00108
PEN 3.365975
PGK 4.237972
PHP 58.919935
PKR 279.749793
PLN 3.57693
PYG 6656.120146
QAR 3.64125
RON 4.317897
RSD 99.493038
RUB 76.448038
RWF 1453
SAR 3.750185
SBD 8.058101
SCR 14.250149
SDG 601.501494
SEK 8.95644
SGD 1.271315
SHP 0.750259
SLE 24.474994
SLL 20969.499267
SOS 571.503458
SRD 38.025022
STD 20697.981008
STN 21.25
SVC 8.759629
SYP 11059.574895
SZL 16.109942
THB 31.490262
TJS 9.349825
TMT 3.51
TND 2.847497
TOP 2.40776
TRY 43.480099
TTD 6.777673
TWD 31.591702
TZS 2588.490529
UAH 43.112529
UGX 3575.692379
UYU 38.836508
UZS 12249.999719
VES 369.791581
VND 26020
VUV 119.156711
WST 2.710781
XAF 553.468475
XAG 0.012114
XAU 0.000209
XCD 2.70255
XCG 1.80413
XDR 0.687215
XOF 551.505966
XPF 101.749394
YER 238.374969
ZAR 16.066915
ZMK 9001.197925
ZMW 19.646044
ZWL 321.999592
  • SCS

    0.0200

    16.14

    +0.12%

  • RBGPF

    0.1000

    82.5

    +0.12%

  • CMSD

    0.0300

    24.08

    +0.12%

  • GSK

    0.8700

    52.47

    +1.66%

  • BCC

    0.9400

    81.75

    +1.15%

  • BTI

    0.3100

    60.99

    +0.51%

  • RIO

    1.4900

    92.52

    +1.61%

  • JRI

    0.0700

    13.15

    +0.53%

  • CMSC

    -0.0100

    23.75

    -0.04%

  • NGG

    -0.6600

    84.61

    -0.78%

  • RELX

    -0.2700

    35.53

    -0.76%

  • BCE

    -0.0300

    25.83

    -0.12%

  • AZN

    1.3100

    188.41

    +0.7%

  • RYCEF

    0.7000

    16.7

    +4.19%

  • BP

    -0.1800

    37.7

    -0.48%

  • VOD

    0.2600

    14.91

    +1.74%

Sun Peak Metals Corp Reports up to 16.35 g/t Gold and 180 g/t Silver From Surface Rock-Chip Samples at the Halahila Project, Saudi Arabia
Sun Peak Metals Corp Reports up to 16.35 g/t Gold and 180 g/t Silver From Surface Rock-Chip Samples at the Halahila Project, Saudi Arabia

Sun Peak Metals Corp Reports up to 16.35 g/t Gold and 180 g/t Silver From Surface Rock-Chip Samples at the Halahila Project, Saudi Arabia

VANCOUVER, BC / ACCESS Newswire / January 22, 2026 / Sun Peak Metals Corp. (TSXV:PEAK)(OTCQB:SUNPF) ("Sun Peak" or the "Company") reports initial results from a systematic geological mapping, rock-chip, and grab sampling program at its 100%-owned Halahila copper-gold-silver volcanogenic massive sulphide ("VMS") project in the Kingdom of Saudi Arabia ("KSA" or "Saudi Arabia").

Text size:

Halahila Project Highlights:

  • Systematic geological mapping and rock chip sampling from the main VMS gossan outline a mineralized zone exceeding 650 meters of strike length, with widths of up to 30 meters, hosting encouraging gold and silver values (Figure 1, Table 1).

  • 25% of samples (24 of 98) returned >1 g/t gold, with values up to 16.35 g/t gold.

  • 29% of samples (28 of 98) returned >10 g/t silver, with values up to 180 g/t silver.

These results represent the first exploration data since Sun Peak completed its acquisition of Saudi Discovery Company on December 18, 2025. The Company is concurrently advancing exploration at its 100%-owned Al Miyah and Safra projects, with results to be reported separately.

Greg Davis, CEO of Sun Peak Metals, commented: "Our exploration team is highly encouraged by the initial results from the Halahila Project. The Project represents a compelling copper-gold-silver VMS target within the Kutam-Al Masane VMS belt in Saudi Arabia. The target, which is comparable to targets the team previously drilled in East Africa, has strong surface gold and silver values and warrants further, aggressive, and systematic exploration. We are eager to advance the entire property through targeted and regional geophysical programs to better define subsurface controls on mineralization in preparation for drilling this year."

Halahila Project Overview

The 35 km² Halahila Project is situated within the highly prospective Kutam-Al Masane VMS Belt of the southern Asir Terrane in Saudi Arabia. The district hosts several VMS and gold deposits, including the Al Masane copper-zinc mining complex, located 45 km to the north, and the ancient historic Kutam copper mine, located 40 km to the west of Halahila.

Field Evaluation and Sampling

Ongoing fieldwork at Halahila includes: detailed geological mapping and systematic rock-chip and channel sampling of the VMS gossans and associated alteration zones along a greater than 10 kilometer north-south trend. Results indicate extensive VMS-style mineralization and alteration, defining a continuous gold-enriched corridor over approximately 650 meters of strike length and widths up to 30 meters (Figures 1 and 2).

Reported samples were collected from surface exposures within the gold-silver rich oxide (gossan) zone.

Next Steps at Halahila

Sun Peak plans to conduct ground-based time-domain electromagnetic ("TDEM") surveys in Q1 2026 to further define priority drill targets, with an initial drill program anticipated in Q3 2026.

A property wide drone magnetic survey is planned to acquire high-resolution magnetic data to support geological interpretation and mineral exploration targeting of VMS-type Cu-Zn-Au-Ag mineralization.

Drilling will be designed to test the down-dip extension and continuity of the oxide gold mineralization and evaluate the potential for underlying supergene and primary massive sulphide mineralization containing both base and precious metals.

Sun Peak Projects in Saudi Arabia

The Company currently holds 100% ownership of six (6) exploration licenses covering approximately 438 km² located within the highly prospective VMS trends of the Arabian-Nubian Shield in Saudi Arabia. In addition, the Company expects to add approximately 800 km² through the finalization of the Saudi Arabian Ministry of Industry and Minerals ("MIM") Round 9 Auction, which was held in Q4 2025, and the finalization of applications for Massa SW and Massa SE that have been accepted by the MIM and are awaiting grant. Sun Peak closed a $6.7M financing in December 2025 and is fully funded to commence systematic exploration campaigns across its prospective property portfolio.

Figure 1. Halahila target area showing gold-in-rock geochemistry from rock-chip and grab sampling program.

Figure 2. Halahila exploration license location map.

Table 1. Notable rock sample assay results from the Halahila target area.

Sample ID

Sample Type

Gold (g/t)

Silver (g/t)

184633

2M CHIP

16.35

180.3

184632

2M CHIP

6.55

23.8

184621

2M CHIP

5.87

35.1

184622

2M CHIP

5.85

3.7

184639

2M CHIP

5.36

39.6

184638

2M CHIP

4.06

28.8

184645

2M CHIP

3.78

18.2

184636

2M CHIP

3.02

23.5

184630

2M CHIP

2.87

12.8

184641

2M CHIP

2.52

9.3

184627

2M CHIP

2.20

6.7

184647

2M CHIP

1.96

33.8

184651

2M CHIP

1.87

11.6

184623

2M CHIP

1.86

9.7

184649

2M CHIP

1.78

17.1

184624

2M CHIP

1.61

3.6

184653

2M CHIP

1.48

7.9

184625

2M CHIP

1.31

7.4

184801

1M X 1M COMPOSITE CHIP

1.11

16.5

184652

2M CHIP

1.09

40.9

184616

2M CHIP

1.05

6.7

184763

0.5M CHIP

1.04

13.8

184643

2M CHIP

1.02

25.4

184650

2M CHIP

1.00

20.6

184644

2M CHIP

0.97

19.4

184642

2M CHIP

0.83

32.1

184626

2M CHIP

0.79

10.2

184629

2M CHIP

0.75

35.0

184757

GRAB

0.75

0.5

184640

2M CHIP

0.65

17.8

184628

2M CHIP

0.58

16.8

184648

2M CHIP

0.49

25.2

184646

2M CHIP

0.47

18.8

184634

2M CHIP

0.41

45.5

184751

1M CHIP

0.38

12.3

184635

2M CHIP

0.33

15.2

184637

2M CHIP

0.18

12.5

Qualified Person

Arron Albano, P. Geo., is the Qualified Person (QP) overseeing the Company's exploration projects in Saudi Arabia and has reviewed and approved this press release.

Sun Peak's quality assurance and quality control (QA/QC) protocols for rock samples disclosed herein follow industry standard practices. Rock samples are delivered directly to ALS Global Lab or Al-Amri Labs in Jeddah, Kingdom of Saudi Arabia for analysis for gold by fire assay and multi-element analyses, including silver, by inductively coupled plasma (ICP).

ABOUT SUN PEAK METALS CORP.

Sun Peak holds a portfolio of VMS-style exploration projects within the Arabian-Nubian Shield across Saudi Arabia and Ethiopia.

In Saudi Arabia, the Company holds 100% ownership of six (6) exploration licenses covering approximately 438 km² located within the highly prospective VMS trends of the Arabian-Nubian Shield. In addition, the Company expects to add approximately 800 km² through the finalization of the Saudi Arabian MIM Round 9 Auction, which was held in Q4 2025, and the finalization of two exploration license applications that have been accepted by the MIM and are awaiting grant.

In Ethiopia, the Company's Shire Project comprises six exploration licenses totaling approximately 1,450 km² within the Arabian-Nubian Shield, the same geological trend that hosts the Bisha Mine and the Asmara Projects in Eritrea. Two of the licenses (Meli and Terer) are held in joint-venture with Ezana Mining, a private Ethiopian company, while the remaining four licenses are 100%-owned by Sun Peak.

ON BEHALF OF THE BOARD OF DIRECTORS OF SUN PEAK METALS CORP.

Greg Davis,
President, CEO & Director

FOR FURTHER INFORMATION, PLEASE CONTACT:

Greg Davis
(T): +1 (604) 999 1099
(E): [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Disclaimer for Forward-Looking Information

Certain information and statements in this news release may be considered forward-looking information or forward-looking statements for purposes of applicable securities laws (collectively, "forward-looking statements"), which reflect the expectations of management regarding its disclosure and amendments thereto. Forward-looking statements consist of information or statements that are not purely historical, including any information or statements regarding beliefs, plans, expectations or intentions regarding the future. Such information or statements in this news release include, but are not limited to, statements with respect to the goal of making a significant discovery and the development of a large-scale project in Saudi Arabia;potential for exploration potential in Saudia Arabia; the untapped mineral wealth of Saudi Arabia; SDC being successful in acquiring additional licenses; the goal of making a significant discovery and the development of a large-scale project in Ethiopia and identifying other potential properties and opportunities both in Ethiopia, Saudi Arabia and globally. Such statements are subject to risks and uncertainties that may cause actual results, performance or developments to differ materially from those contained in the statements. No assurance can be given that any of the events anticipated by the forward-looking statements will occur or, if they do occur, what benefits Sun Peak will obtain from them. These forward-looking statements reflect management's current views and are based on certain expectations, estimates and assumptions, which may prove to be incorrect. A number of risks and uncertainties could cause actual results to differ materially from those expressed or implied by the forward-looking statements, including without limitation: These assumptions and risks include, but are not limited to, assumptions and risks associated with the risk that the results of the planned exploration programs at the Halahila Project and other projects held by Sun Peak, do not meet expected results, the state of the political stability of Ethiopia, equity financing markets and results of future exploration activities by Sun Peak. These forward-looking statements are made as of the date of this news release and, except as required by applicable securities laws, Sun Peak assumes no obligation to update these forward-looking statements, or to update the reasons why actual results differed from those projected in the forward-looking statements. Additional information about these and other assumptions, risks and uncertainties are set out in the "Risks and Uncertainties" section in the Prospectus filed with Canadian security regulators.

SOURCE: Sun Peak Metals Corp.



View the original press release on ACCESS Newswire

S.Jordan--TFWP