The Fort Worth Press - Universal EV Chargers Scales Driver-First DC Fast Charging in 2025, Commissioning 320 Live Ports Across Key U.S. Markets

USD -
AED 3.672497
AFN 64.999819
ALL 81.216919
AMD 362.051328
ANG 1.789785
AOA 917.00025
ARS 1515.25437
AUD 1.437426
AWG 1.80125
AZN 1.697326
BAM 1.739803
BBD 2.01708
BDT 123.195303
BGN 1.747831
BHD 0.378775
BIF 2997.464751
BMD 1
BND 1.281146
BOB 11.69239
BRL 5.065101
BSD 1.001468
BTN 95.050483
BWP 13.720589
BYN 3.015879
BYR 19600
BZD 2.014233
CAD 1.414935
CDF 2313.499181
CHF 0.825932
CLF 0.024881
CLP 979.255437
CNY 6.691203
CNH 6.685309
COP 3173.953654
CRC 455.099408
CUC 1
CUP 24.035938
CVE 98.087444
CZK 21.685496
DJF 178.33919
DKK 6.651198
DOP 61.433083
DZD 133.824668
EGP 53.529689
ERN 15
ETB 163.585998
EUR 0.889897
FJD 2.26765
FKP 0.750253
GBP 0.752078
GEL 2.590432
GGP 0.750253
GHS 11.695058
GIP 0.750253
GMD 73.49623
GNF 8810.21216
GTQ 7.652004
GYD 209.527198
HKD 7.84815
HNL 26.885202
HRK 6.703803
HTG 131.147978
HUF 323.552009
IDR 18053
ILS 3.09465
IMP 0.750253
INR 94.965504
IQD 1518.213762
IRR 1795877.497557
ISK 121.179576
JEP 0.750253
JMD 159.195837
JOD 0.709012
JPY 158.015022
KES 130.098296
KGS 87.449938
KHR 4070.631144
KMF 439.999825
KPW 899.999961
KRW 1334.740045
KWD 0.31082
KYD 0.834586
KZT 453.195748
LAK 22534.359294
LBP 89683.40524
LKR 331.690611
LRD 170.751234
LSL 16.462394
LTL 2.95274
LVL 0.60489
LYD 6.431526
MAD 9.729662
MDL 17.966464
MGA 4507.405595
MKD 54.836988
MMK 2100.071343
MNT 3596.488264
MOP 8.096339
MRU 40.037362
MUR 47.229488
MVR 15.459712
MWK 1736.600987
MXN 18.472997
MYR 4.083203
MZN 63.902819
NAD 16.462394
NGN 1331.2103
NIO 36.854512
NOK 9.427699
NPR 152.081128
NZD 1.770298
OMR 0.382413
PAB 1.001468
PEN 3.444825
PGK 4.547436
PHP 62.985976
PKR 277.237468
PLN 3.894835
PYG 5719.877241
QAR 3.660721
RON 4.7306
RSD 104.461148
RUB 84.13468
RWF 1478.183516
SAR 3.752837
SBD 8.064647
SCR 13.905529
SDG 601.496371
SEK 9.912398
SGD 1.282096
SHP 0.754745
SLE 24.680036
SLL 20969.504398
SOS 572.343548
SRD 37.794503
STD 20697.981008
STN 21.794245
SVC 8.763065
SYP 13001.999685
SZL 16.455989
THB 33.444972
TJS 9.228751
TMT 3.51
TND 2.98768
TOP 2.40776
TRY 49.513801
TTD 6.798915
TWD 32.453598
TZS 2646.44398
UAH 44.920874
UGX 4136.458658
UYU 40.314905
UZS 12073.121914
VES 878.910597
VND 25894.5
VUV 119.385856
WST 2.787824
XAF 583.73441
XAG 0.017551
XAU 0.000240063761
XCD 2.70255
XCG 1.804919
XDR 0.707052
XOF 583.73441
XPF 106.089045
YER 236.150057
ZAR 16.50875
ZMK 9001.193843
ZMW 20.049815
ZWL 321.999592
SSP 5750.775019
MXV 2.085785
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Universal EV Chargers Scales Driver-First DC Fast Charging in 2025, Commissioning 320 Live Ports Across Key U.S. Markets
Universal EV Chargers Scales Driver-First DC Fast Charging in 2025, Commissioning 320 Live Ports Across Key U.S. Markets

Universal EV Chargers Scales Driver-First DC Fast Charging in 2025, Commissioning 320 Live Ports Across Key U.S. Markets

Focused deployments across Illinois, Virginia, Delaware, and North Carolina, combined with flat-fee DC fast charging pilots, position the company for accelerated growth in 2026

Text size:

PLANO, TX / ACCESS Newswire / December 23, 2025 / Universal EV Chargers, a nationwide Charge Point Operator, closed out 2025 by scaling DC fast charging infrastructure through disciplined execution, driver-first site design, and strategic partnerships with hotels, motels, gas stations, convenience stores, and retail locations. During the year, the company commissioned 320 DC fast charging ports (energized and payment-enabled) across 85 locations, with deployments concentrated across Illinois, Virginia, Delaware, and North Carolina, and Illinois accounting for the majority of new installations.

In parallel with network expansion, Universal EV Chargers focused on strengthening the operational systems required to deploy infrastructure reliably and at scale. The company streamlined pre-construction engineering, coordinated earlier with utilities and municipalities, and refined permitting and design workflows to reduce delays and improve predictability across projects.

Scaling DC Fast Charging Through Operational Discipline

In 2025, Universal EV Chargers commissioned 320 live DC fast charging ports by tightening coordination across engineering, construction, and operations teams. By standardizing pre-construction processes and improving logistics planning, materials consistently arrived on site before crews broke ground, reducing downtime and accelerating site activation.

These improvements enabled the company to bring charging locations online more predictably, giving site hosts faster access to revenue-generating infrastructure while maintaining safety, code compliance, and reliability.

Driver-First EV Charging Design and Flat-Fee Pricing Pilots

Universal EV Chargers continued to differentiate its network by designing charging sites around real driver behavior, not just installation convenience. In several locations, the team conducted multiple site surveys and design iterations to improve lighting, visibility, wayfinding, and pull-through access. While these decisions often required additional coordination and engineering effort, they resulted in charging locations that feel intuitive, accessible, and stress-free for drivers.

To further reduce friction, the company launched flat-fee DC fast charging pilots as a product and behavior experiment. Sessions were priced at $15 per session in Illinois and $20 per session in Ohio, simplifying pricing and reducing confusion at the charger. The pilot is designed to study driver adoption patterns, session starts, and support interactions in a simplified pricing environment, with the goal of improving utilization and lowering operational burden for site hosts.

Strategic Partnerships at Everyday Destinations

Growth in 2025 was anchored by partnerships with businesses where drivers already stop - including hotels, motels, gas stations, convenience stores, and retail locations. By focusing on everyday destinations, Universal EV Chargers aligned infrastructure deployment with natural travel patterns, increasing the likelihood that chargers are used consistently and reliably.

This partnership-led approach allows property owners to participate in EV infrastructure growth without added operational complexity, while giving drivers access to fast charging in familiar, well-lit, and high-traffic environments.

EV Charging Software and Platform Readiness

Alongside physical infrastructure, Universal EV Chargers invested in platform capabilities to support a growing network. During the year, the company quadrupled its active mobile app user base, reflecting increased driver adoption across newly commissioned sites.

Universal EV Chargers also advanced its network platform to support broader interoperability and visibility. With progress toward OCPI alignment, the company has enabled broader network visibility, future roaming partnerships, and long-term interoperability across charging ecosystems. Additional enhancements included the rollout of a Site Host Portal, providing property owners with greater transparency into station performance, session activity, and operational insights.

Together, these investments strengthen reliability, reduce manual intervention, and prepare the platform to support continued network expansion.

Earning Public and Private Sector Trust

In 2025, Universal EV Chargers was selected across 86 grant-awarded locations through state and federal EV infrastructure programs, including both NEVI and non-NEVI initiatives. These selections reflect growing confidence in the company's ability to design, deploy, operate, and maintain EV charging infrastructure at scale.

With these awards, Universal EV Chargers ranks among the top five NEVI awardees nationwide, reinforcing its position as a trusted partner for large-scale public and private EV infrastructure deployment.

Looking Ahead to 2026

Building on the operational improvements, partnerships, and platform readiness established in 2025, Universal EV Chargers plans to significantly expand its DC fast charging footprint in 2026. The company's focus remains on disciplined growth and scaling infrastructure without compromising driver experience, reliability, or partner confidence.

Together, these milestones reflect a deliberate approach to building EV infrastructure that works in real-world conditions. By combining live, payment-enabled deployments with driver-first design, simplified pricing experiments, and interoperable platform capabilities, Universal EV Chargers is positioned to improve utilization, deepen trust with partners, and support the next phase of EV adoption.

"EV infrastructure only works if it's built for how people actually travel, stop, and charge," said Hemal Doshi, CEO of Universal EV Chargers. "In 2025, our focus was on disciplined execution - commissioning live, payment-enabled charging, designing sites drivers can use with confidence, and putting systems in place that allow us to grow without breaking reliability. As adoption accelerates, we're committed to scaling with intention, strengthening partnerships, and delivering charging experiences drivers can depend on."

About Universal EV Chargers

Universal EV Chargers is a nationwide Charge Point Operator delivering reliable, driver-first EV charging infrastructure across the United States. The company partners with property owners, businesses, utilities, and public agencies to design, install, operate, and maintain DC fast and Level 2 charging stations supported by integrated software, transparent site host tools, and responsive customer support.

Contact Information:

Megha Thacker
[email protected]

SOURCE: Universal Green Group



View the original press release on ACCESS Newswire

J.Barnes--TFWP