The Fort Worth Press - CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

USD -
AED 3.672502
AFN 66.374624
ALL 82.891062
AMD 382.105484
ANG 1.790055
AOA 916.999807
ARS 1445.826396
AUD 1.509662
AWG 1.80125
AZN 1.695795
BAM 1.678236
BBD 2.018646
BDT 122.628476
BGN 1.677703
BHD 0.377014
BIF 2961.256275
BMD 1
BND 1.297979
BOB 6.925579
BRL 5.310804
BSD 1.002244
BTN 90.032049
BWP 13.315657
BYN 2.90153
BYR 19600
BZD 2.015729
CAD 1.394875
CDF 2230.000049
CHF 0.80302
CLF 0.023394
CLP 917.730085
CNY 7.07165
CNH 7.067097
COP 3796.99
CRC 491.421364
CUC 1
CUP 26.5
CVE 94.616395
CZK 20.76375
DJF 178.481789
DKK 6.40673
DOP 63.686561
DZD 129.897998
EGP 47.520501
ERN 15
ETB 156.280403
EUR 0.857898
FJD 2.261501
FKP 0.750125
GBP 0.749325
GEL 2.700162
GGP 0.750125
GHS 11.416779
GIP 0.750125
GMD 73.000063
GNF 8709.00892
GTQ 7.677291
GYD 209.68946
HKD 7.78475
HNL 26.389336
HRK 6.462901
HTG 131.282447
HUF 328.445496
IDR 16651.7
ILS 3.235525
IMP 0.750125
INR 89.888095
IQD 1312.956662
IRR 42124.999835
ISK 127.820348
JEP 0.750125
JMD 160.623651
JOD 0.708969
JPY 154.622993
KES 129.250164
KGS 87.45021
KHR 4014.227424
KMF 422.000349
KPW 899.992858
KRW 1470.020022
KWD 0.306802
KYD 0.83526
KZT 506.587952
LAK 21742.171042
LBP 89752.828464
LKR 309.374155
LRD 176.902912
LSL 17.013777
LTL 2.95274
LVL 0.60489
LYD 5.447985
MAD 9.247548
MDL 17.048443
MGA 4457.716053
MKD 52.892165
MMK 2099.902882
MNT 3550.784265
MOP 8.035628
MRU 39.710999
MUR 46.070267
MVR 15.409735
MWK 1737.95151
MXN 18.2142
MYR 4.114026
MZN 63.897023
NAD 17.013777
NGN 1450.250279
NIO 36.881624
NOK 10.095799
NPR 144.049872
NZD 1.732802
OMR 0.384503
PAB 1.002325
PEN 3.37046
PGK 4.251065
PHP 58.991026
PKR 283.139992
PLN 3.631841
PYG 6950.492756
QAR 3.663323
RON 4.367199
RSD 100.707975
RUB 76.00652
RWF 1458.303837
SAR 3.753008
SBD 8.223823
SCR 14.340982
SDG 601.504905
SEK 9.41351
SGD 1.29484
SHP 0.750259
SLE 22.999887
SLL 20969.498139
SOS 571.823287
SRD 38.643498
STD 20697.981008
STN 21.023817
SVC 8.769634
SYP 11056.894377
SZL 17.008825
THB 31.89005
TJS 9.210862
TMT 3.5
TND 2.941946
TOP 2.40776
TRY 42.517902
TTD 6.795179
TWD 31.297984
TZS 2449.999928
UAH 42.259148
UGX 3553.316915
UYU 39.265994
UZS 11939.350775
VES 248.585902
VND 26365
VUV 122.113889
WST 2.800321
XAF 562.862377
XAG 0.017154
XAU 0.000237
XCD 2.70255
XCG 1.806356
XDR 0.70002
XOF 562.867207
XPF 102.334841
YER 238.414547
ZAR 16.960985
ZMK 9001.19956
ZMW 23.026725
ZWL 321.999592
  • BCC

    -2.3000

    74.26

    -3.1%

  • JRI

    0.0500

    13.75

    +0.36%

  • SCS

    -0.1200

    16.23

    -0.74%

  • RBGPF

    0.0000

    78.35

    0%

  • NGG

    -0.5800

    75.91

    -0.76%

  • RYCEF

    0.4600

    14.67

    +3.14%

  • AZN

    -0.8200

    90.03

    -0.91%

  • CMSC

    0.0400

    23.48

    +0.17%

  • RIO

    -0.5500

    73.73

    -0.75%

  • CMSD

    -0.0300

    23.32

    -0.13%

  • VOD

    0.0500

    12.64

    +0.4%

  • GSK

    -0.4000

    48.57

    -0.82%

  • BCE

    0.0400

    23.22

    +0.17%

  • RELX

    0.3500

    40.54

    +0.86%

  • BTI

    0.5300

    58.04

    +0.91%

  • BP

    -0.0100

    37.23

    -0.03%

CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates
CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

VANCOUVER, BRITISH COLUMBIA / ACCESS Newswire / November 26, 2025 / CoTec Holdings Corp. (TSXV:CTH)(OTCQB:CTHCF) ("CoTec" or the "Company") is pleased to note that its ~16.5% investment, MagIron LLC ("MagIron"), today announced the successful completion of its comprehensive independent pilot plant test work program conducted in partnership with the University of Minnesota, Natural Resources Research Institute ("NRRI") at Coleraine, Minnesota. The test work forms a key component of MagIron's ongoing feasibility study for the restart of Plant 4 in Grand Rapids, Minnesota.

Text size:

The independent pilot-scale program has confirmed the technical viability of MagIron's new and innovative process flowsheet and demonstrates exceptional iron recovery rates and concentrate quality, consistent with previous bench-scale results conducted since 2022. The flotation pilot plant, while making direct reduction ("DR") grade concentrate of 68.3% total Fe (post-LOI), achieved an 83.5% iron recovery. Meanwhile, the flotation pilot plant, while making blast furnace ("BF") grade concentrate of 66.4% total Fe (post-LOI), achieved an iron recovery of 85.9%. The original Plant 4 previously produced BF grade concentrate at an iron recovery of 40.0%. On a comparable basis, the new Plant 4 flow sheet iron recovery is slightly more than double that of the prior facility. These results validate MagIron's ability to produce DR-grade iron oxide concentrate, supporting the Company's strategy to supply high-grade feedstock for the growing Electric Arc Furnace ("EAF") steel sector.

Fe grade (% Fe)

Iron recovery rate (%)

Pre-LOI

Post-LOI

DR Grade concentrate

83.5%

66.4%

68.3%

BF Grade concentrate

85.9%

64.5%

66.4%

Data from the pilot plant and bench testing campaign forms the foundation of the forthcoming National Instrument 43-101 ("NI 43-101") compliant Mineral Resource and Reserve estimate and will be incorporated into the independent feasibility study being completed by Behre Dolbear, which is expected to be finalised shortly.

Julian Treger, CEO of CoTec commented: "The completion of the pilot plant study and its exciting results are a major step forward for MagIron towards the execution of its strategy to re-start these assets. We remain very bullish on MagIron and are confident that they could become a major player in the US steel industry. As a large shareholder, MagIron's success will further improve the substantial value proposition of CoTec."

Larry Lehtinen, CEO of MagIron, commented: "The successful completion of our bench testing and pilot plant programs marks another major milestone in the restart of Plant 4. The results confirm that MagIron's new process, has the potential to deliver outstanding recovery and product quality metrics. These findings reinforce the robustness of our flowsheet and provide critical validation as we advance our feasibility study and prepare to publish our NI 43-101 compliant resource and reserve statement in the coming weeks."

For further details on MagIron and today's announcement, please visit www.magironusa.com.

About CoTec Holdings Corp.

CoTec Holdings Corp. (TSX-V: CTH, OTCQB: CTHCF) is redefining the future of resource extraction and recycling. Focused on rare earth magnets and strategic materials, CoTec integrates breakthrough technologies with strategic assets to unlock secure, sustainable, and low-cost supply chains.

CoTec's mission is clear: accelerate the energy transition while strengthening strategic critical mineral supply chains for the countries we operate in. By investing in and deploying disruptive technologies, the Company delivers capital-efficient, scalable solutions that transform marginal assets, tailings, waste streams, and recycled products into high-value critical minerals.

From its HyProMag USA magnet recycling joint venture in Texas, to iron tailings reprocessing in Québec, to next-generation copper and iron solutions backed by global majors, CoTec is building a diversified portfolio with long-term growth, rapid cash flow potential, and high barriers to entry. The result is a game-changing platform at the intersection of technology, sustainability, and strategic materials.

For more information, please visit www.cotec.ca.

For further information, please contact:
Braam Jonker - (604) 992-5600

Forward-Looking Information Cautionary Statement

Statements in this press release regarding the Company and its investments which are not historical facts are "forward-looking statements" which involve risks and uncertainties, including statements relating to the MagIron investment, as well as management's expectations with respect to the MagIron investment and other current and potential future investments of CoTec, and the benefits to the Company which may be implied from such statements.

Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements due to known and unknown risks and uncertainties affecting the Company, including but not limited to: resource and reserve risks; environmental risks and costs; permitting and regulatory risks; labor costs and shortages; uncertain supply and price fluctuations in materials; increases in energy costs; labor disputes and work stoppages; equipment leasing and availability; heavy equipment demand and availability; contractor and subcontractor performance; worksite safety issues; project delays and cost overruns; extreme weather events; and social, transport, or geopolitical disruptions.

For further details regarding risks and uncertainties facing the Company, please refer to "Risk Factors" in the Company's filing statement dated April 6, 2022, a copy of which may be found under the Company's profile on SEDAR+ (www.sedarplus.ca). The Company assumes no obligation to update forward-looking statements in this press release except as required by law. Readers should not place undue reliance on the forward-looking statements and information contained in this news release and are encouraged to read the Company's continuous disclosure documents available on SEDAR+ (www.sedarplus.ca).

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

SOURCE: CoTec Holdings Corp.



View the original press release on ACCESS Newswire

M.T.Smith--TFWP