The Fort Worth Press - CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

USD -
AED 3.6725
AFN 64.999454
ALL 81.216919
AMD 362.051328
ANG 1.789785
AOA 916.999838
ARS 1522.745168
AUD 1.435421
AWG 1.80125
AZN 1.70432
BAM 1.739803
BBD 2.01708
BDT 123.195303
BGN 1.747831
BHD 0.378775
BIF 2997.464751
BMD 1
BND 1.281146
BOB 11.69239
BRL 5.065098
BSD 1.001468
BTN 95.050483
BWP 13.720589
BYN 3.015879
BYR 19600
BZD 2.014233
CAD 1.412065
CDF 2313.468877
CHF 0.825695
CLF 0.024881
CLP 979.255437
CNY 6.691205
CNH 6.68528
COP 3173.953654
CRC 455.099408
CUC 1
CUP 24.035938
CVE 98.087444
CZK 21.756002
DJF 178.33919
DKK 6.683675
DOP 61.433083
DZD 133.824668
EGP 53.792394
ERN 15
ETB 163.585998
EUR 0.894175
FJD 2.26765
FKP 0.750253
GBP 0.75131
GEL 2.589642
GGP 0.750253
GHS 11.695058
GIP 0.750253
GMD 73.458051
GNF 8810.21216
GTQ 7.652004
GYD 209.527198
HKD 7.847875
HNL 26.885202
HRK 6.703794
HTG 131.147978
HUF 324.970499
IDR 18053
ILS 3.09465
IMP 0.750253
INR 94.965495
IQD 1518.213762
IRR 1795877.499323
ISK 121.179731
JEP 0.750253
JMD 159.195837
JOD 0.708991
JPY 157.902199
KES 130.098296
KGS 87.449944
KHR 4070.631144
KMF 440.000123
KPW 899.999961
KRW 1334.739814
KWD 0.31082
KYD 0.834586
KZT 453.195748
LAK 22534.359294
LBP 89683.40524
LKR 331.690611
LRD 170.751234
LSL 16.462394
LTL 2.95274
LVL 0.60489
LYD 6.431526
MAD 9.729662
MDL 17.966464
MGA 4507.405595
MKD 54.836988
MMK 2100.071343
MNT 3596.488264
MOP 8.096339
MRU 40.037362
MUR 47.229668
MVR 15.459767
MWK 1736.600987
MXN 18.472665
MYR 4.083204
MZN 63.899361
NAD 16.462394
NGN 1331.210065
NIO 36.854512
NOK 9.46656
NPR 152.081128
NZD 1.767941
OMR 0.382413
PAB 1.001468
PEN 3.444825
PGK 4.547436
PHP 62.985968
PKR 277.237468
PLN 3.907535
PYG 5719.877241
QAR 3.660721
RON 4.730601
RSD 104.461148
RUB 84.54834
RWF 1478.183516
SAR 3.752837
SBD 8.064647
SCR 13.905529
SDG 601.498789
SEK 9.95633
SGD 1.280497
SHP 0.754745
SLE 24.679936
SLL 20969.504398
SOS 572.343548
SRD 37.794501
STD 20697.981008
STN 21.794245
SVC 8.763065
SYP 13001.999685
SZL 16.455989
THB 33.444981
TJS 9.228751
TMT 3.51
TND 2.98768
TOP 2.40776
TRY 49.526505
TTD 6.798915
TWD 32.4536
TZS 2646.44398
UAH 44.920874
UGX 4136.458658
UYU 40.314905
UZS 12073.121914
VES 878.910602
VND 25894.5
VUV 119.385856
WST 2.787824
XAF 586.54035
XAG 0.017551
XAU 0.000240063761
XCD 2.70255
XCG 1.804919
XDR 0.707052
XOF 586.54035
XPF 106.089045
YER 236.149507
ZAR 16.49995
ZMK 9001.201083
ZMW 20.049815
ZWL 321.999592
SSP 5750.775019
MXV 2.085747
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates
CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

VANCOUVER, BRITISH COLUMBIA / ACCESS Newswire / November 26, 2025 / CoTec Holdings Corp. (TSXV:CTH)(OTCQB:CTHCF) ("CoTec" or the "Company") is pleased to note that its ~16.5% investment, MagIron LLC ("MagIron"), today announced the successful completion of its comprehensive independent pilot plant test work program conducted in partnership with the University of Minnesota, Natural Resources Research Institute ("NRRI") at Coleraine, Minnesota. The test work forms a key component of MagIron's ongoing feasibility study for the restart of Plant 4 in Grand Rapids, Minnesota.

Text size:

The independent pilot-scale program has confirmed the technical viability of MagIron's new and innovative process flowsheet and demonstrates exceptional iron recovery rates and concentrate quality, consistent with previous bench-scale results conducted since 2022. The flotation pilot plant, while making direct reduction ("DR") grade concentrate of 68.3% total Fe (post-LOI), achieved an 83.5% iron recovery. Meanwhile, the flotation pilot plant, while making blast furnace ("BF") grade concentrate of 66.4% total Fe (post-LOI), achieved an iron recovery of 85.9%. The original Plant 4 previously produced BF grade concentrate at an iron recovery of 40.0%. On a comparable basis, the new Plant 4 flow sheet iron recovery is slightly more than double that of the prior facility. These results validate MagIron's ability to produce DR-grade iron oxide concentrate, supporting the Company's strategy to supply high-grade feedstock for the growing Electric Arc Furnace ("EAF") steel sector.

Fe grade (% Fe)

Iron recovery rate (%)

Pre-LOI

Post-LOI

DR Grade concentrate

83.5%

66.4%

68.3%

BF Grade concentrate

85.9%

64.5%

66.4%

Data from the pilot plant and bench testing campaign forms the foundation of the forthcoming National Instrument 43-101 ("NI 43-101") compliant Mineral Resource and Reserve estimate and will be incorporated into the independent feasibility study being completed by Behre Dolbear, which is expected to be finalised shortly.

Julian Treger, CEO of CoTec commented: "The completion of the pilot plant study and its exciting results are a major step forward for MagIron towards the execution of its strategy to re-start these assets. We remain very bullish on MagIron and are confident that they could become a major player in the US steel industry. As a large shareholder, MagIron's success will further improve the substantial value proposition of CoTec."

Larry Lehtinen, CEO of MagIron, commented: "The successful completion of our bench testing and pilot plant programs marks another major milestone in the restart of Plant 4. The results confirm that MagIron's new process, has the potential to deliver outstanding recovery and product quality metrics. These findings reinforce the robustness of our flowsheet and provide critical validation as we advance our feasibility study and prepare to publish our NI 43-101 compliant resource and reserve statement in the coming weeks."

For further details on MagIron and today's announcement, please visit www.magironusa.com.

About CoTec Holdings Corp.

CoTec Holdings Corp. (TSX-V: CTH, OTCQB: CTHCF) is redefining the future of resource extraction and recycling. Focused on rare earth magnets and strategic materials, CoTec integrates breakthrough technologies with strategic assets to unlock secure, sustainable, and low-cost supply chains.

CoTec's mission is clear: accelerate the energy transition while strengthening strategic critical mineral supply chains for the countries we operate in. By investing in and deploying disruptive technologies, the Company delivers capital-efficient, scalable solutions that transform marginal assets, tailings, waste streams, and recycled products into high-value critical minerals.

From its HyProMag USA magnet recycling joint venture in Texas, to iron tailings reprocessing in Québec, to next-generation copper and iron solutions backed by global majors, CoTec is building a diversified portfolio with long-term growth, rapid cash flow potential, and high barriers to entry. The result is a game-changing platform at the intersection of technology, sustainability, and strategic materials.

For more information, please visit www.cotec.ca.

For further information, please contact:
Braam Jonker - (604) 992-5600

Forward-Looking Information Cautionary Statement

Statements in this press release regarding the Company and its investments which are not historical facts are "forward-looking statements" which involve risks and uncertainties, including statements relating to the MagIron investment, as well as management's expectations with respect to the MagIron investment and other current and potential future investments of CoTec, and the benefits to the Company which may be implied from such statements.

Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements due to known and unknown risks and uncertainties affecting the Company, including but not limited to: resource and reserve risks; environmental risks and costs; permitting and regulatory risks; labor costs and shortages; uncertain supply and price fluctuations in materials; increases in energy costs; labor disputes and work stoppages; equipment leasing and availability; heavy equipment demand and availability; contractor and subcontractor performance; worksite safety issues; project delays and cost overruns; extreme weather events; and social, transport, or geopolitical disruptions.

For further details regarding risks and uncertainties facing the Company, please refer to "Risk Factors" in the Company's filing statement dated April 6, 2022, a copy of which may be found under the Company's profile on SEDAR+ (www.sedarplus.ca). The Company assumes no obligation to update forward-looking statements in this press release except as required by law. Readers should not place undue reliance on the forward-looking statements and information contained in this news release and are encouraged to read the Company's continuous disclosure documents available on SEDAR+ (www.sedarplus.ca).

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

SOURCE: CoTec Holdings Corp.



View the original press release on ACCESS Newswire

M.T.Smith--TFWP