The Fort Worth Press - CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

USD -
AED 3.672497
AFN 63.000241
ALL 82.171465
AMD 368.348897
ANG 1.79046
AOA 918.000389
ARS 1398.488498
AUD 1.402652
AWG 1.80225
AZN 1.702334
BAM 1.686369
BBD 2.01471
BDT 122.938169
BGN 1.66992
BHD 0.377402
BIF 3020.685136
BMD 1
BND 1.280857
BOB 6.911715
BRL 5.029503
BSD 1.000285
BTN 96.802814
BWP 13.565621
BYN 2.74451
BYR 19600
BZD 2.011778
CAD 1.375785
CDF 2252.50141
CHF 0.790105
CLF 0.022951
CLP 903.339761
CNY 6.815035
CNH 6.806945
COP 3794.6
CRC 452.072394
CUC 1
CUP 26.5
CVE 95.074886
CZK 20.965798
DJF 178.130146
DKK 6.44231
DOP 58.86512
DZD 133.019018
EGP 53.394199
ERN 15
ETB 162.413668
EUR 0.86205
FJD 2.206102
FKP 0.746313
GBP 0.746145
GEL 2.670307
GGP 0.746313
GHS 11.553153
GIP 0.746313
GMD 72.999863
GNF 8768.980056
GTQ 7.62565
GYD 209.188029
HKD 7.832795
HNL 26.605275
HRK 6.493303
HTG 130.939755
HUF 311.467
IDR 17702
ILS 2.9233
IMP 0.746313
INR 96.81545
IQD 1310.346017
IRR 1320950.000336
ISK 123.620207
JEP 0.746313
JMD 158.255516
JOD 0.709019
JPY 159.029504
KES 129.570073
KGS 87.44985
KHR 4025.798219
KMF 424.000072
KPW 899.971581
KRW 1505.610135
KWD 0.30932
KYD 0.833614
KZT 471.964269
LAK 21911.241022
LBP 89576.467748
LKR 344.602809
LRD 183.053536
LSL 16.605103
LTL 2.95274
LVL 0.60489
LYD 6.365917
MAD 9.237263
MDL 17.385344
MGA 4199.970684
MKD 53.148469
MMK 2099.263265
MNT 3579.713688
MOP 8.070738
MRU 39.951887
MUR 47.41059
MVR 15.402442
MWK 1734.481837
MXN 17.368402
MYR 3.969304
MZN 63.909628
NAD 16.605103
NGN 1372.909756
NIO 36.809022
NOK 9.27905
NPR 154.884158
NZD 1.71029
OMR 0.384497
PAB 1.000285
PEN 3.424041
PGK 4.36121
PHP 61.698032
PKR 278.657234
PLN 3.66772
PYG 6163.290997
QAR 3.637963
RON 4.511497
RSD 101.201969
RUB 71.15218
RWF 1463.566052
SAR 3.752456
SBD 8.032258
SCR 14.092325
SDG 600.498241
SEK 9.377065
SGD 1.280295
SHP 0.746601
SLE 24.604613
SLL 20969.502105
SOS 571.667536
SRD 37.227501
STD 20697.981008
STN 21.124878
SVC 8.752597
SYP 110.544495
SZL 16.593807
THB 32.679506
TJS 9.292705
TMT 3.5
TND 2.933944
TOP 2.40776
TRY 45.597335
TTD 6.780655
TWD 31.621099
TZS 2605.00299
UAH 44.286108
UGX 3775.74864
UYU 40.326961
UZS 12083.430335
VES 517.3145
VND 26373
VUV 118.270619
WST 2.715865
XAF 565.592316
XAG 0.013231
XAU 0.000222
XCD 2.70255
XCG 1.802771
XDR 0.702153
XOF 565.592316
XPF 102.830734
YER 238.650163
ZAR 16.593197
ZMK 9001.197693
ZMW 18.930478
ZWL 321.999592
  • RYCEF

    0.0600

    15.45

    +0.39%

  • RBGPF

    0.7200

    63.23

    +1.14%

  • BCE

    0.1600

    23.98

    +0.67%

  • RIO

    -2.4100

    100.92

    -2.39%

  • BCC

    -2.1300

    65.47

    -3.25%

  • RELX

    -0.3800

    33.58

    -1.13%

  • NGG

    0.3100

    84.15

    +0.37%

  • CMSC

    -0.1800

    22.8

    -0.79%

  • CMSD

    -0.2100

    22.75

    -0.92%

  • JRI

    -0.2300

    12.47

    -1.84%

  • VOD

    0.1500

    15.15

    +0.99%

  • GSK

    0.7900

    51.05

    +1.55%

  • BTI

    -0.2900

    66.06

    -0.44%

  • BP

    0.4500

    46.14

    +0.98%

  • AZN

    0.7200

    184.64

    +0.39%

CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates
CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

VANCOUVER, BRITISH COLUMBIA / ACCESS Newswire / November 26, 2025 / CoTec Holdings Corp. (TSXV:CTH)(OTCQB:CTHCF) ("CoTec" or the "Company") is pleased to note that its ~16.5% investment, MagIron LLC ("MagIron"), today announced the successful completion of its comprehensive independent pilot plant test work program conducted in partnership with the University of Minnesota, Natural Resources Research Institute ("NRRI") at Coleraine, Minnesota. The test work forms a key component of MagIron's ongoing feasibility study for the restart of Plant 4 in Grand Rapids, Minnesota.

Text size:

The independent pilot-scale program has confirmed the technical viability of MagIron's new and innovative process flowsheet and demonstrates exceptional iron recovery rates and concentrate quality, consistent with previous bench-scale results conducted since 2022. The flotation pilot plant, while making direct reduction ("DR") grade concentrate of 68.3% total Fe (post-LOI), achieved an 83.5% iron recovery. Meanwhile, the flotation pilot plant, while making blast furnace ("BF") grade concentrate of 66.4% total Fe (post-LOI), achieved an iron recovery of 85.9%. The original Plant 4 previously produced BF grade concentrate at an iron recovery of 40.0%. On a comparable basis, the new Plant 4 flow sheet iron recovery is slightly more than double that of the prior facility. These results validate MagIron's ability to produce DR-grade iron oxide concentrate, supporting the Company's strategy to supply high-grade feedstock for the growing Electric Arc Furnace ("EAF") steel sector.

Fe grade (% Fe)

Iron recovery rate (%)

Pre-LOI

Post-LOI

DR Grade concentrate

83.5%

66.4%

68.3%

BF Grade concentrate

85.9%

64.5%

66.4%

Data from the pilot plant and bench testing campaign forms the foundation of the forthcoming National Instrument 43-101 ("NI 43-101") compliant Mineral Resource and Reserve estimate and will be incorporated into the independent feasibility study being completed by Behre Dolbear, which is expected to be finalised shortly.

Julian Treger, CEO of CoTec commented: "The completion of the pilot plant study and its exciting results are a major step forward for MagIron towards the execution of its strategy to re-start these assets. We remain very bullish on MagIron and are confident that they could become a major player in the US steel industry. As a large shareholder, MagIron's success will further improve the substantial value proposition of CoTec."

Larry Lehtinen, CEO of MagIron, commented: "The successful completion of our bench testing and pilot plant programs marks another major milestone in the restart of Plant 4. The results confirm that MagIron's new process, has the potential to deliver outstanding recovery and product quality metrics. These findings reinforce the robustness of our flowsheet and provide critical validation as we advance our feasibility study and prepare to publish our NI 43-101 compliant resource and reserve statement in the coming weeks."

For further details on MagIron and today's announcement, please visit www.magironusa.com.

About CoTec Holdings Corp.

CoTec Holdings Corp. (TSX-V: CTH, OTCQB: CTHCF) is redefining the future of resource extraction and recycling. Focused on rare earth magnets and strategic materials, CoTec integrates breakthrough technologies with strategic assets to unlock secure, sustainable, and low-cost supply chains.

CoTec's mission is clear: accelerate the energy transition while strengthening strategic critical mineral supply chains for the countries we operate in. By investing in and deploying disruptive technologies, the Company delivers capital-efficient, scalable solutions that transform marginal assets, tailings, waste streams, and recycled products into high-value critical minerals.

From its HyProMag USA magnet recycling joint venture in Texas, to iron tailings reprocessing in Québec, to next-generation copper and iron solutions backed by global majors, CoTec is building a diversified portfolio with long-term growth, rapid cash flow potential, and high barriers to entry. The result is a game-changing platform at the intersection of technology, sustainability, and strategic materials.

For more information, please visit www.cotec.ca.

For further information, please contact:
Braam Jonker - (604) 992-5600

Forward-Looking Information Cautionary Statement

Statements in this press release regarding the Company and its investments which are not historical facts are "forward-looking statements" which involve risks and uncertainties, including statements relating to the MagIron investment, as well as management's expectations with respect to the MagIron investment and other current and potential future investments of CoTec, and the benefits to the Company which may be implied from such statements.

Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements due to known and unknown risks and uncertainties affecting the Company, including but not limited to: resource and reserve risks; environmental risks and costs; permitting and regulatory risks; labor costs and shortages; uncertain supply and price fluctuations in materials; increases in energy costs; labor disputes and work stoppages; equipment leasing and availability; heavy equipment demand and availability; contractor and subcontractor performance; worksite safety issues; project delays and cost overruns; extreme weather events; and social, transport, or geopolitical disruptions.

For further details regarding risks and uncertainties facing the Company, please refer to "Risk Factors" in the Company's filing statement dated April 6, 2022, a copy of which may be found under the Company's profile on SEDAR+ (www.sedarplus.ca). The Company assumes no obligation to update forward-looking statements in this press release except as required by law. Readers should not place undue reliance on the forward-looking statements and information contained in this news release and are encouraged to read the Company's continuous disclosure documents available on SEDAR+ (www.sedarplus.ca).

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

SOURCE: CoTec Holdings Corp.



View the original press release on ACCESS Newswire

M.T.Smith--TFWP