The Fort Worth Press - CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

USD -
AED 3.672504
AFN 64.000368
ALL 82.099008
AMD 367.63228
ANG 1.790403
AOA 917.503981
ARS 1492.901385
AUD 1.443002
AWG 1.8025
AZN 1.70397
BAM 1.709092
BBD 2.014681
BDT 123.336392
BGN 1.69088
BHD 0.377157
BIF 2975.313497
BMD 1
BND 1.290864
BOB 6.927077
BRL 5.170399
BSD 1.000306
BTN 95.296893
BWP 13.491502
BYN 2.902259
BYR 19600
BZD 2.011797
CAD 1.41995
CDF 2246.000362
CHF 0.801016
CLF 0.023518
CLP 925.617163
CNY 6.789104
CNH 6.785505
COP 3363.656224
CRC 455.717219
CUC 1
CUP 26.5
CVE 96.35601
CZK 21.144704
DJF 178.127321
DKK 6.535604
DOP 59.256346
DZD 133.361297
EGP 49.283873
ERN 15
ETB 160.4018
EUR 0.873904
FJD 2.26045
FKP 0.748895
GBP 0.746798
GEL 2.63504
GGP 0.748895
GHS 11.363656
GIP 0.748895
GMD 72.503851
GNF 8772.665705
GTQ 7.634028
GYD 209.236685
HKD 7.84465
HNL 26.773277
HRK 6.587504
HTG 130.834098
HUF 308.910388
IDR 17994.4
ILS 2.99865
IMP 0.748895
INR 95.215504
IQD 1310.350854
IRR 1375950.000352
ISK 125.920386
JEP 0.748895
JMD 158.351903
JOD 0.70904
JPY 161.36504
KES 129.3398
KGS 87.447704
KHR 4005.767466
KMF 431.00035
KPW 900.00035
KRW 1528.775039
KWD 0.31029
KYD 0.833661
KZT 473.045834
LAK 22586.621226
LBP 89575.392144
LKR 335.046096
LRD 181.552847
LSL 16.224931
LTL 2.95274
LVL 0.60489
LYD 6.4115
MAD 9.354393
MDL 17.595141
MGA 4240.835409
MKD 53.86027
MMK 2099.883338
MNT 3582.147735
MOP 8.08057
MRU 39.921353
MUR 47.050378
MVR 15.460378
MWK 1734.609167
MXN 17.469104
MYR 4.071039
MZN 63.910377
NAD 16.224931
NGN 1370.080377
NIO 36.806921
NOK 9.841039
NPR 152.475204
NZD 1.75116
OMR 0.385704
PAB 1.000306
PEN 3.403766
PGK 4.394635
PHP 61.501038
PKR 278.103989
PLN 3.75205
PYG 6082.055315
QAR 3.656661
RON 4.568038
RSD 102.570892
RUB 76.986936
RWF 1464.412112
SAR 3.755774
SBD 8.058541
SCR 13.46616
SDG 600.503676
SEK 9.65806
SGD 1.291404
SHP 0.746601
SLE 24.350371
SLL 20969.503664
SOS 571.678245
SRD 37.566038
STD 20697.981008
STN 21.409534
SVC 8.752567
SYP 110.532098
SZL 16.22231
THB 33.325038
TJS 9.2726
TMT 3.51
TND 2.952244
TOP 2.40776
TRY 46.767504
TTD 6.779394
TWD 31.938038
TZS 2626.818718
UAH 44.550181
UGX 3650.980906
UYU 40.232446
UZS 11983.221916
VES 638.90327
VND 26296
VUV 118.93159
WST 2.77318
XAF 573.213615
XAG 0.016021
XAU 0.00024
XCD 2.70255
XCG 1.80277
XDR 0.712894
XOF 573.213615
XPF 104.216367
YER 237.050363
ZAR 16.231504
ZMK 9001.203584
ZMW 18.379866
ZWL 321.999592
  • CMSC

    0.0400

    21.99

    +0.18%

  • NGG

    2.6700

    82.85

    +3.22%

  • RELX

    0.5500

    31.93

    +1.72%

  • RBGPF

    2.5400

    68.15

    +3.73%

  • GSK

    2.3600

    53.66

    +4.4%

  • AZN

    11.2900

    195.15

    +5.79%

  • RIO

    1.0700

    94.42

    +1.13%

  • RYCEF

    0.5400

    19.68

    +2.74%

  • BTI

    1.2100

    61.77

    +1.96%

  • CMSD

    -0.0300

    22.15

    -0.14%

  • BCE

    0.4000

    21.42

    +1.87%

  • JRI

    0.0600

    13

    +0.46%

  • BCC

    0.4500

    75.93

    +0.59%

  • BP

    1.2500

    37.4

    +3.34%

  • VOD

    0.1400

    13.15

    +1.06%

CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates
CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

CoTec Investment Magiron Completes Pilot Plant Tests, Achieving Exceptional Recovery Rates

VANCOUVER, BRITISH COLUMBIA / ACCESS Newswire / November 26, 2025 / CoTec Holdings Corp. (TSXV:CTH)(OTCQB:CTHCF) ("CoTec" or the "Company") is pleased to note that its ~16.5% investment, MagIron LLC ("MagIron"), today announced the successful completion of its comprehensive independent pilot plant test work program conducted in partnership with the University of Minnesota, Natural Resources Research Institute ("NRRI") at Coleraine, Minnesota. The test work forms a key component of MagIron's ongoing feasibility study for the restart of Plant 4 in Grand Rapids, Minnesota.

Text size:

The independent pilot-scale program has confirmed the technical viability of MagIron's new and innovative process flowsheet and demonstrates exceptional iron recovery rates and concentrate quality, consistent with previous bench-scale results conducted since 2022. The flotation pilot plant, while making direct reduction ("DR") grade concentrate of 68.3% total Fe (post-LOI), achieved an 83.5% iron recovery. Meanwhile, the flotation pilot plant, while making blast furnace ("BF") grade concentrate of 66.4% total Fe (post-LOI), achieved an iron recovery of 85.9%. The original Plant 4 previously produced BF grade concentrate at an iron recovery of 40.0%. On a comparable basis, the new Plant 4 flow sheet iron recovery is slightly more than double that of the prior facility. These results validate MagIron's ability to produce DR-grade iron oxide concentrate, supporting the Company's strategy to supply high-grade feedstock for the growing Electric Arc Furnace ("EAF") steel sector.

Fe grade (% Fe)

Iron recovery rate (%)

Pre-LOI

Post-LOI

DR Grade concentrate

83.5%

66.4%

68.3%

BF Grade concentrate

85.9%

64.5%

66.4%

Data from the pilot plant and bench testing campaign forms the foundation of the forthcoming National Instrument 43-101 ("NI 43-101") compliant Mineral Resource and Reserve estimate and will be incorporated into the independent feasibility study being completed by Behre Dolbear, which is expected to be finalised shortly.

Julian Treger, CEO of CoTec commented: "The completion of the pilot plant study and its exciting results are a major step forward for MagIron towards the execution of its strategy to re-start these assets. We remain very bullish on MagIron and are confident that they could become a major player in the US steel industry. As a large shareholder, MagIron's success will further improve the substantial value proposition of CoTec."

Larry Lehtinen, CEO of MagIron, commented: "The successful completion of our bench testing and pilot plant programs marks another major milestone in the restart of Plant 4. The results confirm that MagIron's new process, has the potential to deliver outstanding recovery and product quality metrics. These findings reinforce the robustness of our flowsheet and provide critical validation as we advance our feasibility study and prepare to publish our NI 43-101 compliant resource and reserve statement in the coming weeks."

For further details on MagIron and today's announcement, please visit www.magironusa.com.

About CoTec Holdings Corp.

CoTec Holdings Corp. (TSX-V: CTH, OTCQB: CTHCF) is redefining the future of resource extraction and recycling. Focused on rare earth magnets and strategic materials, CoTec integrates breakthrough technologies with strategic assets to unlock secure, sustainable, and low-cost supply chains.

CoTec's mission is clear: accelerate the energy transition while strengthening strategic critical mineral supply chains for the countries we operate in. By investing in and deploying disruptive technologies, the Company delivers capital-efficient, scalable solutions that transform marginal assets, tailings, waste streams, and recycled products into high-value critical minerals.

From its HyProMag USA magnet recycling joint venture in Texas, to iron tailings reprocessing in Québec, to next-generation copper and iron solutions backed by global majors, CoTec is building a diversified portfolio with long-term growth, rapid cash flow potential, and high barriers to entry. The result is a game-changing platform at the intersection of technology, sustainability, and strategic materials.

For more information, please visit www.cotec.ca.

For further information, please contact:
Braam Jonker - (604) 992-5600

Forward-Looking Information Cautionary Statement

Statements in this press release regarding the Company and its investments which are not historical facts are "forward-looking statements" which involve risks and uncertainties, including statements relating to the MagIron investment, as well as management's expectations with respect to the MagIron investment and other current and potential future investments of CoTec, and the benefits to the Company which may be implied from such statements.

Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements due to known and unknown risks and uncertainties affecting the Company, including but not limited to: resource and reserve risks; environmental risks and costs; permitting and regulatory risks; labor costs and shortages; uncertain supply and price fluctuations in materials; increases in energy costs; labor disputes and work stoppages; equipment leasing and availability; heavy equipment demand and availability; contractor and subcontractor performance; worksite safety issues; project delays and cost overruns; extreme weather events; and social, transport, or geopolitical disruptions.

For further details regarding risks and uncertainties facing the Company, please refer to "Risk Factors" in the Company's filing statement dated April 6, 2022, a copy of which may be found under the Company's profile on SEDAR+ (www.sedarplus.ca). The Company assumes no obligation to update forward-looking statements in this press release except as required by law. Readers should not place undue reliance on the forward-looking statements and information contained in this news release and are encouraged to read the Company's continuous disclosure documents available on SEDAR+ (www.sedarplus.ca).

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

SOURCE: CoTec Holdings Corp.



View the original press release on ACCESS Newswire

M.T.Smith--TFWP