The Fort Worth Press - Presentation to Swiss Mining Institute Conference

USD -
AED 3.67315
AFN 65.503991
ALL 83.072963
AMD 376.980403
ANG 1.790083
AOA 917.000367
ARS 1392.459104
AUD 1.450958
AWG 1.80025
AZN 1.70397
BAM 1.695072
BBD 2.009612
BDT 122.428639
BGN 1.709309
BHD 0.380504
BIF 2970
BMD 1
BND 1.2851
BOB 6.894519
BRL 5.154104
BSD 0.997742
BTN 92.939509
BWP 13.688562
BYN 2.956504
BYR 19600
BZD 2.006665
CAD 1.39441
CDF 2305.000362
CHF 0.800665
CLF 0.023306
CLP 920.250396
CNY 6.88265
CNH 6.887235
COP 3665
CRC 464.279833
CUC 1
CUP 26.5
CVE 95.56558
CZK 21.283504
DJF 177.720393
DKK 6.48699
DOP 60.850393
DZD 132.91504
EGP 54.345804
ERN 15
ETB 155.800822
EUR 0.868104
FJD 2.253804
FKP 0.755399
GBP 0.757525
GEL 2.68504
GGP 0.755399
GHS 11.00504
GIP 0.755399
GMD 74.000355
GNF 8752.513347
GTQ 7.632939
GYD 208.828972
HKD 7.83745
HNL 26.504427
HRK 6.539104
HTG 130.952897
HUF 334.380388
IDR 17002.65
ILS 3.130375
IMP 0.755399
INR 92.706904
IQD 1307.141959
IRR 1319125.000352
ISK 125.370386
JEP 0.755399
JMD 157.303566
JOD 0.70904
JPY 159.63404
KES 129.803801
KGS 87.450384
KHR 3990.137323
KMF 427.00035
KPW 899.984966
KRW 1510.820383
KWD 0.30934
KYD 0.831502
KZT 472.805432
LAK 21970.392969
LBP 89502.03926
LKR 314.804623
LRD 183.088277
LSL 16.955078
LTL 2.95274
LVL 0.60489
LYD 6.380628
MAD 9.374033
MDL 17.55613
MGA 4171.343141
MKD 53.422776
MMK 2099.725508
MNT 3578.768806
MOP 8.055104
MRU 39.637211
MUR 46.940378
MVR 15.460378
MWK 1730.071718
MXN 17.873804
MYR 4.031039
MZN 63.950377
NAD 16.954711
NGN 1378.130377
NIO 36.712196
NOK 9.791125
NPR 148.701282
NZD 1.75693
OMR 0.384545
PAB 0.997734
PEN 3.45194
PGK 4.316042
PHP 60.401038
PKR 278.39991
PLN 3.71365
PYG 6454.29687
QAR 3.638018
RON 4.423904
RSD 101.772347
RUB 80.332711
RWF 1457.240049
SAR 3.754249
SBD 8.038772
SCR 14.425806
SDG 601.000339
SEK 9.477695
SGD 1.286904
SHP 0.750259
SLE 24.650371
SLL 20969.510825
SOS 570.192924
SRD 37.351038
STD 20697.981008
STN 21.233539
SVC 8.730169
SYP 111.309257
SZL 16.948198
THB 32.680369
TJS 9.563492
TMT 3.51
TND 2.941459
TOP 2.40776
TRY 44.586255
TTD 6.768937
TWD 31.979038
TZS 2600.000335
UAH 43.698134
UGX 3743.234401
UYU 40.405091
UZS 12122.393971
VES 473.390504
VND 26340
VUV 119.350864
WST 2.77386
XAF 568.506489
XAG 0.013693
XAU 0.000214
XCD 2.70255
XCG 1.798209
XDR 0.70704
XOF 568.516344
XPF 103.361457
YER 238.650363
ZAR 17.006904
ZMK 9001.203584
ZMW 19.281421
ZWL 321.999592
  • RBGPF

    -13.5000

    69

    -19.57%

  • CMSD

    0.1100

    22.26

    +0.49%

  • BTI

    0.3900

    58.28

    +0.67%

  • NGG

    1.1500

    87.99

    +1.31%

  • BCE

    -0.9300

    24.45

    -3.8%

  • BCC

    -1.8800

    73.2

    -2.57%

  • RYCEF

    0.9000

    15.99

    +5.63%

  • CMSC

    0.0500

    22.04

    +0.23%

  • GSK

    0.7000

    56.69

    +1.23%

  • RELX

    0.3600

    33.59

    +1.07%

  • JRI

    0.0900

    12.61

    +0.71%

  • RIO

    -0.3600

    94.45

    -0.38%

  • VOD

    0.0800

    15.21

    +0.53%

  • AZN

    2.7600

    203.49

    +1.36%

  • BP

    0.9500

    47.12

    +2.02%

Presentation to Swiss Mining Institute Conference
Presentation to Swiss Mining Institute Conference

Presentation to Swiss Mining Institute Conference

ADELAIDE, AU / ACCESS Newswire / November 20, 2025 / Barton Gold Holdings Limited (ASX:BGD) (Barton or the Company) advises that the attached presentation is due to be presented today at the Swiss Mining Institute.

Text size:

A copy of this presentation can be accessed on the ASX website, the investor section of Barton's website, or directly by clicking here.

Authorised by the Managing Director of Barton Gold Holdings Limited.

For further information, please contact:

Alexander Scanlon
Managing Director
[email protected]
+61 425 226 649

Jade Cook
Company Secretary
[email protected]
+61 8 9322 1587

About Barton Gold

Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000ozpa with 2.2Moz Au & 3.1Moz Ag JORC Mineral Resources (79.9Mt @ 0.87g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia.*

Challenger Gold Project

  • 313koz Au + fully permitted Central Gawler Mill ( CGM )

Tarcoola Gold Project

  • 20koz Au in fully permitted open pit mine near CGM

  • Tolmer discovery grades up to 84g/t Au & 17,600g/t Ag

Tunkillia Gold Project

  • 1.6Moz Au & 3.1Moz Ag JORC Mineral Resources

  • Competitive 120kozpa gold & 250kozpa silver project

Wudinna Gold Project

  • 279koz Au project located southeast of Tunkillia

  • Significant optionality, adjacent to main highway

Competent Persons Statement & Previously Reported Information

The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 (JORC).

Activity

Competent Person

Membership

Status

Tarcoola Mineral Resource (Stockpiles)

Dr Andrew Fowler (Consultant)

AusIMM

Member

Tarcoola Mineral Resource (Perseverance Mine)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Tarcoola Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tarcoola Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Exploration Results (until 15 Nov 2021)

Mr Colin Skidmore (Consultant)

AIG

Member

Tunkillia Exploration Results (after 15 Nov 2021)

Mr Marc Twining (Employee)

AusIMM

Member

Tunkillia Mineral Resource

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (above 215mRL)

Mr Ian Taylor (Consultant)

AusIMM

Fellow

Challenger Mineral Resource (below 90mRL)

Mr Dale Sims

AusIMM / AIG

Fellow / Member

Wudinna Mineral Resource (Clarke Deposit)

Ms Justine Tracey

AusIMM

Member

Wudinna Mineral Resource (all other Deposits)

Mrs Christine Standing

AusIMM / AIG

Member / Member

The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. In accordance with ASX Listing Rule 5.19.2, the Company further confirms that the material assumptions underpinning any production targets and the forecast financial information derived therefrom continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.

Cautionary Statement Regarding Forward-Looking Information

This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.

* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 8 September 2025. Total Barton JORC (2012) Mineral Resources include 1,049koz Au (39.7Mt @ 0.82 g/t Au) in Indicated category and 1,186koz Au (40.2Mt @ 0.92 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.

SOURCE: Barton Gold Holdings Limited



View the original press release on ACCESS Newswire

W.Lane--TFWP