The Fort Worth Press - AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project

USD -
AED 3.672499
AFN 64.999746
ALL 81.216919
AMD 362.051328
ANG 1.789785
AOA 916.999737
ARS 1517.025022
AUD 1.434701
AWG 1.80125
AZN 1.674966
BAM 1.739803
BBD 2.01708
BDT 123.195303
BGN 1.747831
BHD 0.378775
BIF 2997.464751
BMD 1
BND 1.281146
BOB 11.69239
BRL 5.065102
BSD 1.001468
BTN 95.050483
BWP 13.720589
BYN 3.015879
BYR 19600
BZD 2.014233
CAD 1.411995
CDF 2313.500625
CHF 0.82387
CLF 0.024881
CLP 979.260336
CNY 6.691203
CNH 6.684399
COP 3176.37
CRC 455.099408
CUC 1
CUP 24.035938
CVE 98.087444
CZK 21.6652
DJF 178.33919
DKK 6.657165
DOP 61.433083
DZD 133.824668
EGP 53.606297
ERN 15
ETB 163.585998
EUR 0.89045
FJD 2.26765
FKP 0.750253
GBP 0.749985
GEL 2.590156
GGP 0.750253
GHS 11.695058
GIP 0.750253
GMD 73.495888
GNF 8810.21216
GTQ 7.652004
GYD 209.527198
HKD 7.847655
HNL 26.885202
HRK 6.710984
HTG 131.147978
HUF 323.428498
IDR 18054
ILS 3.09465
IMP 0.750253
INR 94.97855
IQD 1518.213762
IRR 1795877.503759
ISK 121.290065
JEP 0.750253
JMD 159.195837
JOD 0.709042
JPY 157.823499
KES 130.019783
KGS 87.449637
KHR 4070.631144
KMF 440.000081
KPW 899.999961
KRW 1334.74007
KWD 0.31082
KYD 0.834586
KZT 453.195748
LAK 22534.359294
LBP 89683.40524
LKR 331.690611
LRD 170.751234
LSL 16.462394
LTL 2.95274
LVL 0.60489
LYD 6.431526
MAD 9.729662
MDL 17.966464
MGA 4507.405595
MKD 54.836988
MMK 2100.071343
MNT 3596.488264
MOP 8.096339
MRU 40.037362
MUR 47.220273
MVR 15.45965
MWK 1736.600987
MXN 18.44911
MYR 4.081095
MZN 63.896031
NAD 16.462394
NGN 1333.36012
NIO 36.854512
NOK 9.432155
NPR 152.081128
NZD 1.766941
OMR 0.382413
PAB 1.001468
PEN 3.444825
PGK 4.547436
PHP 62.975027
PKR 277.237468
PLN 3.892639
PYG 5719.877241
QAR 3.660721
RON 4.744401
RSD 104.461148
RUB 84.217087
RWF 1478.183516
SAR 3.752837
SBD 8.064647
SCR 13.905529
SDG 601.501313
SEK 9.910345
SGD 1.279395
SHP 0.754745
SLE 24.679966
SLL 20969.504398
SOS 572.343548
SRD 37.794499
STD 20697.981008
STN 21.794245
SVC 8.763065
SYP 13001.999685
SZL 16.455989
THB 33.440221
TJS 9.228751
TMT 3.51
TND 2.98768
TOP 2.40776
TRY 49.52654
TTD 6.798915
TWD 32.401963
TZS 2639.950505
UAH 44.920874
UGX 4136.458658
UYU 40.314905
UZS 12073.121914
VES 878.910597
VND 25894.5
VUV 119.385856
WST 2.787824
XAF 584.096748
XAG 0.017412
XAU 0.000239026302
XCD 2.70255
XCG 1.804919
XDR 0.707052
XOF 584.096748
XPF 106.089045
YER 236.149865
ZAR 16.459465
ZMK 9001.199117
ZMW 20.049815
ZWL 321.999592
SSP 5750.775019
MXV 2.083087
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project
AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project

AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project

Advanced modeling powered by artificial intelligence (AI) indicates that Montauban may be more than a reclamation or redevelopment story - it may be emerging as the nucleus of a potentially much larger gold, silver, and base metal district.

Text size:

VANCOUVER, BRITISH COLUMBIA / ACCESS Newswire / November 13, 2025 / ESGold Corp. (CSE:ESAU)(OTCQB:ESAUF)(FSE:Z7D) ("ESGold" or the "Company") is pleased to announce the partial completion and interpretation of a comprehensive three-dimensional geological model of its flagship Montauban Gold-Silver Project in Québec.

The model, developed by Geomatic World Inc., consolidates over half a century of geological data, drilling records, and mine plans into a single, modern three-dimensional (3D) representation. The results partially demonstrate that mineralization at Montauban may follow a mineralized system that may look like volcanogenic massive sulphide ("VMS") system with consistent gold, silver, zinc, and lead enrichment-sharing certain key geological features with globally recognized deposits such as Broken Hill (Australia) and Millenbach (Noranda, Québec) although the deposit is not of the same age nor geological context than any of those deposits.

Watch the 3D Model in Action

A new video showcasing ESGold's 3D geological model of the Montauban Project can be viewed here:

https://youtu.be/0NJNVnVQnuM

Figure 1. Three-dimensional (3D) geological model of the Montauban Property, Québec, The model integrates historical and modern data to reveal multiple stacked gold- and silver-rich sulphide zones aligned with major fault structures-geometry characteristic of large, metamorphosed VMS systems (Source: Geomatic World Inc., "Executive Summary - Montauban 3D Geological Modeling Project," prepared for ESGold Corp., November 2025.)

Gordon Robb, CEO and Director of ESGold, commented, "The Montauban model is the most significant technical milestone in the project's modern history. What was once seen as a series of small, isolated deposits now seems to emerge as a continuous, multilayered mineral system with dimensions not previously recognized at Montauban."

Mr. Robb added: "The continuity of mineralized horizons, structural alignment, and metamorphic overprint identified in this model provide the geological backbone to explore Montauban as a true district. With our cash-flow-ready tailings operation and construction well advanced, we're uniquely positioned to self-fund exploration across the property and accelerate discovery without excessive dilution."

Key Geological Highlights from the 3D Model

  • Continuous, Stacked Mineralized Zones:
    The model defines multiple gold- and silver-rich sulphide horizons extending beyond historical mine workings, aligned with regional fault structures that remain open along strike and at depth.

  • Structural Coherence and Scale:
    Mineralized lenses follow predictable structural trends and fold geometries, indicating a large-scale, multi-horizon VMS system typical of mature mining camps such as Noranda and Broken Hill.

  • Broken Hill and Millenbach Analogues:
    Montauban exhibits similar geological architecture - metamorphosed VMS mineralization, strong structural repetition, and gold-silver enrichment - placing it within the same family of deposit types capable of hosting significant tonnages, however the Company acknowledges there is no assurance of same or even similar results to those analogous deposits.

  • Digital Integration of Tailings and Hard Rock:
    The 3D model integrates both mineralized zones and historical tailings volumes, giving ESGold a full "digital twin" of the property. This dual focus supports near-term reprocessing cash flow and long-term exploration upside. Additional technical data from the historical underground polymetallic zone is still being digitized, a process now underway that will further enhance the model once complete.

Camp-Scale Potential Emerging:
The data suggest Montauban may represent the central node of a broader polymetallic corridor, with potential for additional pods or lenses extending well beyond known zones.

Next Steps for the Project

  • Proceed with Property-Wide ANT Survey:
    ESGold will expand its existing ANT passive seismic program across the entire Montauban property to map deeper structures, potential feeder systems, and additional mineralized pods.

  • Digitize and Incorporate Historical Mine Records:
    Historical mine plans, underground workings, and regional geological data will be merged into the 3D model to enhance resource continuity and target prioritization.

  • Develop a Systematic Exploration and Drilling Program:
    A comprehensive exploration roadmap will be finalized to include systematic step-out and infill drilling near the deposit along major structural corridors identified in the model as well as an exploratory program further from the known zones.

  • Initiate Drill Permitting Process:
    ESGold will begin the application process to secure all necessary permits for its next phase of exploration drilling.

  • Self-Funded Discovery Model:
    With construction of the Montauban mill building complete and the Company now advancing sourcing and procurement of the Merrill-Crowe processing circuit, ESGold's near-term cash flow from tailings reprocessing has the ability to finance exploration internally, minimizing dilution while maximizing discovery leverage.

A Vision for Growth

Montauban now stands as a fully permitted project with mill building construction complete and processing circuit procurement underway, supported by a geological framework of district scale potential. The combination of near-term production readiness and multipod exploration upside uniquely positions ESGold among emerging producers in Québec, a province globally recognized for its mining stability, infrastructure, and access to clean energy.

Why This Matters to Investors

The new 3D model demonstrates that Montauban is not just a reclamation or redevelopment story - it is the nucleus of a potentially much larger gold, silver, and base-metal district.
By continuing confirming geological similarities to world-class systems like Broken Hill and Millenbach, ESGold has established a foundation for multi-year, multi-target exploration across a structurally controlled corridor that remains vastly underexplored.

With a fully funded production path, robust economics, and an emerging exploration blueprint, ESGold offers investors the rare combination of near-term cash flow, low capital risk, and large-scale discovery potential - all within one of the safest mining jurisdictions in the world, being Quebec.

Qualified Person Statement

The technical content of this news release has been reviewed and approved by André Gauthier, P.Geo., a Director of ESGold and a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Sampling described herein was conducted for due-diligence screening; independent verification, QA/QC, and systematic work remain outstanding. No mineral resources or reserves are declared.

About ESGold Corp.

ESGold Corp. (CSE: ESAU | OTCQB: ESAUF | FSE: Z7D) is a fully permitted, fully funded, pre-production mining company advancing a scalable clean mining model across North and South America. The Company's flagship Montauban Gold-Silver Project in Quebec is under construction with production anticipated in 2026. ESGold is also advancing a joint venture in Colombia, validating one of South America's most prolific gold regions for tailings reprocessing and systematic exploration. With a dual-track strategy of cash flow today and discovery tomorrow, ESGold is building a platform for clean, sustainable growth and long-term shareholder value.

For more information, please contact ESGold Corp. at +1-888-370-1059 or visit esgold.com for additional resources, including a French version of this press release, past news releases, a 3D model of the Montauban processing plant, media interviews, and opinion-editorial pieces.

Stay connected by following us on X (formerly Twitter), LinkedIn, and joining our Telegram channel.

For further information or to connect directly, please reach out to Gordon Robb, CEO of ESGold Corp. at [email protected] or call 250-217-2321.

On behalf of the Board of Directors

ESGold Corp.
Paul Mastantuono
Chairman & COO
[email protected]
+1-888-370-1059

Cautionary Note Regarding Forward-Looking Information

This press release contains statements that constitute "forward-looking information" (collectively, "forward-looking statements") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that discusses predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or"intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements contained in this press release include, without limitation, statements regarding the business, the Montauban project and timing of completion of the model and studies. In making the forward-looking statements contained in this press release, the Company has made certain assumptions, including, but not limited to outcomes associated with analogous deposits, 3D modeling predictions and estimates regarding mineralization and otherwise, and optimization works at the Montauban project. Although the Company believes that the expectations reflected in forward-looking statements are reasonable, it can give no assurance that the expectations of any forward-looking statements will prove to be correct. Known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to modeling risk, general business, economic, competitive, political and social uncertainties. Accordingly, readers should not place undue reliance on the forward-looking statements and information contained in this press release. Except as required by law, Ascendant disclaims any intention and assumes no obligation to update or revise any forward-looking statements to reflect actual results, whether as a result of new information, future events, changes in assumptions, changes in factors affecting such forward-looking statements or otherwise. Forward-looking information is subject to a variety of risks and uncertainties, which could cause actual events or results to differ from those reflected in the forward-looking information, including, without limitation, the risks described under the Company's continuous disclosure documents filed with Canadian securities regulators, which filings are available on SEDAR+ at www.sedarplus.com. The risk factors referred to above are not an exhaustive list of the factors that may affect any of the Company's forward-looking information. The Company's statements containing forward-looking information are based on the beliefs, expectations and opinions of management on the date the statements are made, and the Company does not assume any obligation to update such forward-looking information if circumstances or management's beliefs, expectations or opinions should change, other than as required by applicable law. For the reasons set forth above, one should not place undue reliance on forward-looking information.

Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

SOURCE: ESGold Corp



View the original press release on ACCESS Newswire

B.Martinez--TFWP