The Fort Worth Press - AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project

USD -
AED 3.672504
AFN 64.000368
ALL 82.099008
AMD 367.63228
ANG 1.790403
AOA 917.503981
ARS 1492.901385
AUD 1.443002
AWG 1.8025
AZN 1.70397
BAM 1.709092
BBD 2.014681
BDT 123.336392
BGN 1.69088
BHD 0.377157
BIF 2975.313497
BMD 1
BND 1.290864
BOB 6.927077
BRL 5.170399
BSD 1.000306
BTN 95.296893
BWP 13.491502
BYN 2.902259
BYR 19600
BZD 2.011797
CAD 1.41995
CDF 2246.000362
CHF 0.801016
CLF 0.023518
CLP 925.617163
CNY 6.789104
CNH 6.785505
COP 3363.656224
CRC 455.717219
CUC 1
CUP 26.5
CVE 96.35601
CZK 21.144704
DJF 178.127321
DKK 6.535604
DOP 59.256346
DZD 133.361297
EGP 49.283873
ERN 15
ETB 160.4018
EUR 0.873904
FJD 2.26045
FKP 0.748895
GBP 0.746798
GEL 2.63504
GGP 0.748895
GHS 11.363656
GIP 0.748895
GMD 72.503851
GNF 8772.665705
GTQ 7.634028
GYD 209.236685
HKD 7.84465
HNL 26.773277
HRK 6.587504
HTG 130.834098
HUF 308.910388
IDR 17994.4
ILS 2.99865
IMP 0.748895
INR 95.215504
IQD 1310.350854
IRR 1375950.000352
ISK 125.920386
JEP 0.748895
JMD 158.351903
JOD 0.70904
JPY 161.36504
KES 129.3398
KGS 87.447704
KHR 4005.767466
KMF 431.00035
KPW 900.00035
KRW 1528.775039
KWD 0.31029
KYD 0.833661
KZT 473.045834
LAK 22586.621226
LBP 89575.392144
LKR 335.046096
LRD 181.552847
LSL 16.224931
LTL 2.95274
LVL 0.60489
LYD 6.4115
MAD 9.354393
MDL 17.595141
MGA 4240.835409
MKD 53.86027
MMK 2099.883338
MNT 3582.147735
MOP 8.08057
MRU 39.921353
MUR 47.050378
MVR 15.460378
MWK 1734.609167
MXN 17.469104
MYR 4.071039
MZN 63.910377
NAD 16.224931
NGN 1370.080377
NIO 36.806921
NOK 9.841039
NPR 152.475204
NZD 1.75116
OMR 0.385704
PAB 1.000306
PEN 3.403766
PGK 4.394635
PHP 61.501038
PKR 278.103989
PLN 3.75205
PYG 6082.055315
QAR 3.656661
RON 4.568038
RSD 102.570892
RUB 76.986936
RWF 1464.412112
SAR 3.755774
SBD 8.058541
SCR 13.46616
SDG 600.503676
SEK 9.65806
SGD 1.291404
SHP 0.746601
SLE 24.350371
SLL 20969.503664
SOS 571.678245
SRD 37.566038
STD 20697.981008
STN 21.409534
SVC 8.752567
SYP 110.532098
SZL 16.22231
THB 33.325038
TJS 9.2726
TMT 3.51
TND 2.952244
TOP 2.40776
TRY 46.767504
TTD 6.779394
TWD 31.938038
TZS 2626.818718
UAH 44.550181
UGX 3650.980906
UYU 40.232446
UZS 11983.221916
VES 638.90327
VND 26296
VUV 118.93159
WST 2.77318
XAF 573.213615
XAG 0.016021
XAU 0.00024
XCD 2.70255
XCG 1.80277
XDR 0.712894
XOF 573.213615
XPF 104.216367
YER 237.050363
ZAR 16.231504
ZMK 9001.203584
ZMW 18.379866
ZWL 321.999592
  • CMSD

    -0.0300

    22.15

    -0.14%

  • CMSC

    0.0400

    21.99

    +0.18%

  • NGG

    2.6700

    82.85

    +3.22%

  • BCC

    0.4500

    75.93

    +0.59%

  • RIO

    1.0700

    94.42

    +1.13%

  • RBGPF

    2.5400

    68.15

    +3.73%

  • BTI

    1.2100

    61.77

    +1.96%

  • GSK

    2.3600

    53.66

    +4.4%

  • BCE

    0.4000

    21.42

    +1.87%

  • JRI

    0.0600

    13

    +0.46%

  • RELX

    0.5500

    31.93

    +1.72%

  • AZN

    11.2900

    195.15

    +5.79%

  • RYCEF

    0.5400

    19.68

    +2.74%

  • VOD

    0.1400

    13.15

    +1.06%

  • BP

    1.2500

    37.4

    +3.34%

AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project
AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project

AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project

Advanced modeling powered by artificial intelligence (AI) indicates that Montauban may be more than a reclamation or redevelopment story - it may be emerging as the nucleus of a potentially much larger gold, silver, and base metal district.

Text size:

VANCOUVER, BRITISH COLUMBIA / ACCESS Newswire / November 13, 2025 / ESGold Corp. (CSE:ESAU)(OTCQB:ESAUF)(FSE:Z7D) ("ESGold" or the "Company") is pleased to announce the partial completion and interpretation of a comprehensive three-dimensional geological model of its flagship Montauban Gold-Silver Project in Québec.

The model, developed by Geomatic World Inc., consolidates over half a century of geological data, drilling records, and mine plans into a single, modern three-dimensional (3D) representation. The results partially demonstrate that mineralization at Montauban may follow a mineralized system that may look like volcanogenic massive sulphide ("VMS") system with consistent gold, silver, zinc, and lead enrichment-sharing certain key geological features with globally recognized deposits such as Broken Hill (Australia) and Millenbach (Noranda, Québec) although the deposit is not of the same age nor geological context than any of those deposits.

Watch the 3D Model in Action

A new video showcasing ESGold's 3D geological model of the Montauban Project can be viewed here:

https://youtu.be/0NJNVnVQnuM

Figure 1. Three-dimensional (3D) geological model of the Montauban Property, Québec, The model integrates historical and modern data to reveal multiple stacked gold- and silver-rich sulphide zones aligned with major fault structures-geometry characteristic of large, metamorphosed VMS systems (Source: Geomatic World Inc., "Executive Summary - Montauban 3D Geological Modeling Project," prepared for ESGold Corp., November 2025.)

Gordon Robb, CEO and Director of ESGold, commented, "The Montauban model is the most significant technical milestone in the project's modern history. What was once seen as a series of small, isolated deposits now seems to emerge as a continuous, multilayered mineral system with dimensions not previously recognized at Montauban."

Mr. Robb added: "The continuity of mineralized horizons, structural alignment, and metamorphic overprint identified in this model provide the geological backbone to explore Montauban as a true district. With our cash-flow-ready tailings operation and construction well advanced, we're uniquely positioned to self-fund exploration across the property and accelerate discovery without excessive dilution."

Key Geological Highlights from the 3D Model

  • Continuous, Stacked Mineralized Zones:
    The model defines multiple gold- and silver-rich sulphide horizons extending beyond historical mine workings, aligned with regional fault structures that remain open along strike and at depth.

  • Structural Coherence and Scale:
    Mineralized lenses follow predictable structural trends and fold geometries, indicating a large-scale, multi-horizon VMS system typical of mature mining camps such as Noranda and Broken Hill.

  • Broken Hill and Millenbach Analogues:
    Montauban exhibits similar geological architecture - metamorphosed VMS mineralization, strong structural repetition, and gold-silver enrichment - placing it within the same family of deposit types capable of hosting significant tonnages, however the Company acknowledges there is no assurance of same or even similar results to those analogous deposits.

  • Digital Integration of Tailings and Hard Rock:
    The 3D model integrates both mineralized zones and historical tailings volumes, giving ESGold a full "digital twin" of the property. This dual focus supports near-term reprocessing cash flow and long-term exploration upside. Additional technical data from the historical underground polymetallic zone is still being digitized, a process now underway that will further enhance the model once complete.

Camp-Scale Potential Emerging:
The data suggest Montauban may represent the central node of a broader polymetallic corridor, with potential for additional pods or lenses extending well beyond known zones.

Next Steps for the Project

  • Proceed with Property-Wide ANT Survey:
    ESGold will expand its existing ANT passive seismic program across the entire Montauban property to map deeper structures, potential feeder systems, and additional mineralized pods.

  • Digitize and Incorporate Historical Mine Records:
    Historical mine plans, underground workings, and regional geological data will be merged into the 3D model to enhance resource continuity and target prioritization.

  • Develop a Systematic Exploration and Drilling Program:
    A comprehensive exploration roadmap will be finalized to include systematic step-out and infill drilling near the deposit along major structural corridors identified in the model as well as an exploratory program further from the known zones.

  • Initiate Drill Permitting Process:
    ESGold will begin the application process to secure all necessary permits for its next phase of exploration drilling.

  • Self-Funded Discovery Model:
    With construction of the Montauban mill building complete and the Company now advancing sourcing and procurement of the Merrill-Crowe processing circuit, ESGold's near-term cash flow from tailings reprocessing has the ability to finance exploration internally, minimizing dilution while maximizing discovery leverage.

A Vision for Growth

Montauban now stands as a fully permitted project with mill building construction complete and processing circuit procurement underway, supported by a geological framework of district scale potential. The combination of near-term production readiness and multipod exploration upside uniquely positions ESGold among emerging producers in Québec, a province globally recognized for its mining stability, infrastructure, and access to clean energy.

Why This Matters to Investors

The new 3D model demonstrates that Montauban is not just a reclamation or redevelopment story - it is the nucleus of a potentially much larger gold, silver, and base-metal district.
By continuing confirming geological similarities to world-class systems like Broken Hill and Millenbach, ESGold has established a foundation for multi-year, multi-target exploration across a structurally controlled corridor that remains vastly underexplored.

With a fully funded production path, robust economics, and an emerging exploration blueprint, ESGold offers investors the rare combination of near-term cash flow, low capital risk, and large-scale discovery potential - all within one of the safest mining jurisdictions in the world, being Quebec.

Qualified Person Statement

The technical content of this news release has been reviewed and approved by André Gauthier, P.Geo., a Director of ESGold and a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Sampling described herein was conducted for due-diligence screening; independent verification, QA/QC, and systematic work remain outstanding. No mineral resources or reserves are declared.

About ESGold Corp.

ESGold Corp. (CSE: ESAU | OTCQB: ESAUF | FSE: Z7D) is a fully permitted, fully funded, pre-production mining company advancing a scalable clean mining model across North and South America. The Company's flagship Montauban Gold-Silver Project in Quebec is under construction with production anticipated in 2026. ESGold is also advancing a joint venture in Colombia, validating one of South America's most prolific gold regions for tailings reprocessing and systematic exploration. With a dual-track strategy of cash flow today and discovery tomorrow, ESGold is building a platform for clean, sustainable growth and long-term shareholder value.

For more information, please contact ESGold Corp. at +1-888-370-1059 or visit esgold.com for additional resources, including a French version of this press release, past news releases, a 3D model of the Montauban processing plant, media interviews, and opinion-editorial pieces.

Stay connected by following us on X (formerly Twitter), LinkedIn, and joining our Telegram channel.

For further information or to connect directly, please reach out to Gordon Robb, CEO of ESGold Corp. at [email protected] or call 250-217-2321.

On behalf of the Board of Directors

ESGold Corp.
Paul Mastantuono
Chairman & COO
[email protected]
+1-888-370-1059

Cautionary Note Regarding Forward-Looking Information

This press release contains statements that constitute "forward-looking information" (collectively, "forward-looking statements") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that discusses predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or"intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements contained in this press release include, without limitation, statements regarding the business, the Montauban project and timing of completion of the model and studies. In making the forward-looking statements contained in this press release, the Company has made certain assumptions, including, but not limited to outcomes associated with analogous deposits, 3D modeling predictions and estimates regarding mineralization and otherwise, and optimization works at the Montauban project. Although the Company believes that the expectations reflected in forward-looking statements are reasonable, it can give no assurance that the expectations of any forward-looking statements will prove to be correct. Known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to modeling risk, general business, economic, competitive, political and social uncertainties. Accordingly, readers should not place undue reliance on the forward-looking statements and information contained in this press release. Except as required by law, Ascendant disclaims any intention and assumes no obligation to update or revise any forward-looking statements to reflect actual results, whether as a result of new information, future events, changes in assumptions, changes in factors affecting such forward-looking statements or otherwise. Forward-looking information is subject to a variety of risks and uncertainties, which could cause actual events or results to differ from those reflected in the forward-looking information, including, without limitation, the risks described under the Company's continuous disclosure documents filed with Canadian securities regulators, which filings are available on SEDAR+ at www.sedarplus.com. The risk factors referred to above are not an exhaustive list of the factors that may affect any of the Company's forward-looking information. The Company's statements containing forward-looking information are based on the beliefs, expectations and opinions of management on the date the statements are made, and the Company does not assume any obligation to update such forward-looking information if circumstances or management's beliefs, expectations or opinions should change, other than as required by applicable law. For the reasons set forth above, one should not place undue reliance on forward-looking information.

Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

SOURCE: ESGold Corp



View the original press release on ACCESS Newswire

B.Martinez--TFWP