The Fort Worth Press - AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project

USD -
AED 3.67315
AFN 65.503991
ALL 83.072963
AMD 376.980403
ANG 1.790083
AOA 917.000367
ARS 1392.459104
AUD 1.450958
AWG 1.80025
AZN 1.70397
BAM 1.695072
BBD 2.009612
BDT 122.428639
BGN 1.709309
BHD 0.380504
BIF 2970
BMD 1
BND 1.2851
BOB 6.894519
BRL 5.154104
BSD 0.997742
BTN 92.939509
BWP 13.688562
BYN 2.956504
BYR 19600
BZD 2.006665
CAD 1.39441
CDF 2305.000362
CHF 0.800665
CLF 0.023306
CLP 920.250396
CNY 6.88265
CNH 6.887235
COP 3665
CRC 464.279833
CUC 1
CUP 26.5
CVE 95.56558
CZK 21.283504
DJF 177.720393
DKK 6.48699
DOP 60.850393
DZD 132.91504
EGP 54.345804
ERN 15
ETB 155.800822
EUR 0.868104
FJD 2.253804
FKP 0.755399
GBP 0.757525
GEL 2.68504
GGP 0.755399
GHS 11.00504
GIP 0.755399
GMD 74.000355
GNF 8752.513347
GTQ 7.632939
GYD 208.828972
HKD 7.83745
HNL 26.504427
HRK 6.539104
HTG 130.952897
HUF 334.380388
IDR 17002.65
ILS 3.130375
IMP 0.755399
INR 92.706904
IQD 1307.141959
IRR 1319125.000352
ISK 125.370386
JEP 0.755399
JMD 157.303566
JOD 0.70904
JPY 159.63404
KES 129.803801
KGS 87.450384
KHR 3990.137323
KMF 427.00035
KPW 899.984966
KRW 1510.820383
KWD 0.30934
KYD 0.831502
KZT 472.805432
LAK 21970.392969
LBP 89502.03926
LKR 314.804623
LRD 183.088277
LSL 16.955078
LTL 2.95274
LVL 0.60489
LYD 6.380628
MAD 9.374033
MDL 17.55613
MGA 4171.343141
MKD 53.422776
MMK 2099.725508
MNT 3578.768806
MOP 8.055104
MRU 39.637211
MUR 46.940378
MVR 15.460378
MWK 1730.071718
MXN 17.873804
MYR 4.031039
MZN 63.950377
NAD 16.954711
NGN 1378.130377
NIO 36.712196
NOK 9.791125
NPR 148.701282
NZD 1.75693
OMR 0.384545
PAB 0.997734
PEN 3.45194
PGK 4.316042
PHP 60.401038
PKR 278.39991
PLN 3.71365
PYG 6454.29687
QAR 3.638018
RON 4.423904
RSD 101.772347
RUB 80.332711
RWF 1457.240049
SAR 3.754249
SBD 8.038772
SCR 14.425806
SDG 601.000339
SEK 9.477695
SGD 1.286904
SHP 0.750259
SLE 24.650371
SLL 20969.510825
SOS 570.192924
SRD 37.351038
STD 20697.981008
STN 21.233539
SVC 8.730169
SYP 111.309257
SZL 16.948198
THB 32.680369
TJS 9.563492
TMT 3.51
TND 2.941459
TOP 2.40776
TRY 44.586255
TTD 6.768937
TWD 31.979038
TZS 2600.000335
UAH 43.698134
UGX 3743.234401
UYU 40.405091
UZS 12122.393971
VES 473.390504
VND 26340
VUV 119.350864
WST 2.77386
XAF 568.506489
XAG 0.013693
XAU 0.000214
XCD 2.70255
XCG 1.798209
XDR 0.70704
XOF 568.516344
XPF 103.361457
YER 238.650363
ZAR 17.006904
ZMK 9001.203584
ZMW 19.281421
ZWL 321.999592
  • RBGPF

    -13.5000

    69

    -19.57%

  • NGG

    1.1500

    87.99

    +1.31%

  • AZN

    2.7600

    203.49

    +1.36%

  • CMSC

    0.0500

    22.04

    +0.23%

  • BCE

    -0.9300

    24.45

    -3.8%

  • BCC

    -1.8800

    73.2

    -2.57%

  • RELX

    0.3600

    33.59

    +1.07%

  • GSK

    0.7000

    56.69

    +1.23%

  • CMSD

    0.1100

    22.26

    +0.49%

  • JRI

    0.0900

    12.61

    +0.71%

  • BTI

    0.3900

    58.28

    +0.67%

  • RYCEF

    0.9000

    15.99

    +5.63%

  • RIO

    -0.3600

    94.45

    -0.38%

  • VOD

    0.0800

    15.21

    +0.53%

  • BP

    0.9500

    47.12

    +2.02%

AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project
AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project

AI Enhanced 3D Model Defines a Potential District Scale Gold and Silver System at ESGold's Montauban Project

Advanced modeling powered by artificial intelligence (AI) indicates that Montauban may be more than a reclamation or redevelopment story - it may be emerging as the nucleus of a potentially much larger gold, silver, and base metal district.

Text size:

VANCOUVER, BRITISH COLUMBIA / ACCESS Newswire / November 13, 2025 / ESGold Corp. (CSE:ESAU)(OTCQB:ESAUF)(FSE:Z7D) ("ESGold" or the "Company") is pleased to announce the partial completion and interpretation of a comprehensive three-dimensional geological model of its flagship Montauban Gold-Silver Project in Québec.

The model, developed by Geomatic World Inc., consolidates over half a century of geological data, drilling records, and mine plans into a single, modern three-dimensional (3D) representation. The results partially demonstrate that mineralization at Montauban may follow a mineralized system that may look like volcanogenic massive sulphide ("VMS") system with consistent gold, silver, zinc, and lead enrichment-sharing certain key geological features with globally recognized deposits such as Broken Hill (Australia) and Millenbach (Noranda, Québec) although the deposit is not of the same age nor geological context than any of those deposits.

Watch the 3D Model in Action

A new video showcasing ESGold's 3D geological model of the Montauban Project can be viewed here:

https://youtu.be/0NJNVnVQnuM

Figure 1. Three-dimensional (3D) geological model of the Montauban Property, Québec, The model integrates historical and modern data to reveal multiple stacked gold- and silver-rich sulphide zones aligned with major fault structures-geometry characteristic of large, metamorphosed VMS systems (Source: Geomatic World Inc., "Executive Summary - Montauban 3D Geological Modeling Project," prepared for ESGold Corp., November 2025.)

Gordon Robb, CEO and Director of ESGold, commented, "The Montauban model is the most significant technical milestone in the project's modern history. What was once seen as a series of small, isolated deposits now seems to emerge as a continuous, multilayered mineral system with dimensions not previously recognized at Montauban."

Mr. Robb added: "The continuity of mineralized horizons, structural alignment, and metamorphic overprint identified in this model provide the geological backbone to explore Montauban as a true district. With our cash-flow-ready tailings operation and construction well advanced, we're uniquely positioned to self-fund exploration across the property and accelerate discovery without excessive dilution."

Key Geological Highlights from the 3D Model

  • Continuous, Stacked Mineralized Zones:
    The model defines multiple gold- and silver-rich sulphide horizons extending beyond historical mine workings, aligned with regional fault structures that remain open along strike and at depth.

  • Structural Coherence and Scale:
    Mineralized lenses follow predictable structural trends and fold geometries, indicating a large-scale, multi-horizon VMS system typical of mature mining camps such as Noranda and Broken Hill.

  • Broken Hill and Millenbach Analogues:
    Montauban exhibits similar geological architecture - metamorphosed VMS mineralization, strong structural repetition, and gold-silver enrichment - placing it within the same family of deposit types capable of hosting significant tonnages, however the Company acknowledges there is no assurance of same or even similar results to those analogous deposits.

  • Digital Integration of Tailings and Hard Rock:
    The 3D model integrates both mineralized zones and historical tailings volumes, giving ESGold a full "digital twin" of the property. This dual focus supports near-term reprocessing cash flow and long-term exploration upside. Additional technical data from the historical underground polymetallic zone is still being digitized, a process now underway that will further enhance the model once complete.

Camp-Scale Potential Emerging:
The data suggest Montauban may represent the central node of a broader polymetallic corridor, with potential for additional pods or lenses extending well beyond known zones.

Next Steps for the Project

  • Proceed with Property-Wide ANT Survey:
    ESGold will expand its existing ANT passive seismic program across the entire Montauban property to map deeper structures, potential feeder systems, and additional mineralized pods.

  • Digitize and Incorporate Historical Mine Records:
    Historical mine plans, underground workings, and regional geological data will be merged into the 3D model to enhance resource continuity and target prioritization.

  • Develop a Systematic Exploration and Drilling Program:
    A comprehensive exploration roadmap will be finalized to include systematic step-out and infill drilling near the deposit along major structural corridors identified in the model as well as an exploratory program further from the known zones.

  • Initiate Drill Permitting Process:
    ESGold will begin the application process to secure all necessary permits for its next phase of exploration drilling.

  • Self-Funded Discovery Model:
    With construction of the Montauban mill building complete and the Company now advancing sourcing and procurement of the Merrill-Crowe processing circuit, ESGold's near-term cash flow from tailings reprocessing has the ability to finance exploration internally, minimizing dilution while maximizing discovery leverage.

A Vision for Growth

Montauban now stands as a fully permitted project with mill building construction complete and processing circuit procurement underway, supported by a geological framework of district scale potential. The combination of near-term production readiness and multipod exploration upside uniquely positions ESGold among emerging producers in Québec, a province globally recognized for its mining stability, infrastructure, and access to clean energy.

Why This Matters to Investors

The new 3D model demonstrates that Montauban is not just a reclamation or redevelopment story - it is the nucleus of a potentially much larger gold, silver, and base-metal district.
By continuing confirming geological similarities to world-class systems like Broken Hill and Millenbach, ESGold has established a foundation for multi-year, multi-target exploration across a structurally controlled corridor that remains vastly underexplored.

With a fully funded production path, robust economics, and an emerging exploration blueprint, ESGold offers investors the rare combination of near-term cash flow, low capital risk, and large-scale discovery potential - all within one of the safest mining jurisdictions in the world, being Quebec.

Qualified Person Statement

The technical content of this news release has been reviewed and approved by André Gauthier, P.Geo., a Director of ESGold and a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Sampling described herein was conducted for due-diligence screening; independent verification, QA/QC, and systematic work remain outstanding. No mineral resources or reserves are declared.

About ESGold Corp.

ESGold Corp. (CSE: ESAU | OTCQB: ESAUF | FSE: Z7D) is a fully permitted, fully funded, pre-production mining company advancing a scalable clean mining model across North and South America. The Company's flagship Montauban Gold-Silver Project in Quebec is under construction with production anticipated in 2026. ESGold is also advancing a joint venture in Colombia, validating one of South America's most prolific gold regions for tailings reprocessing and systematic exploration. With a dual-track strategy of cash flow today and discovery tomorrow, ESGold is building a platform for clean, sustainable growth and long-term shareholder value.

For more information, please contact ESGold Corp. at +1-888-370-1059 or visit esgold.com for additional resources, including a French version of this press release, past news releases, a 3D model of the Montauban processing plant, media interviews, and opinion-editorial pieces.

Stay connected by following us on X (formerly Twitter), LinkedIn, and joining our Telegram channel.

For further information or to connect directly, please reach out to Gordon Robb, CEO of ESGold Corp. at [email protected] or call 250-217-2321.

On behalf of the Board of Directors

ESGold Corp.
Paul Mastantuono
Chairman & COO
[email protected]
+1-888-370-1059

Cautionary Note Regarding Forward-Looking Information

This press release contains statements that constitute "forward-looking information" (collectively, "forward-looking statements") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that discusses predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or"intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements contained in this press release include, without limitation, statements regarding the business, the Montauban project and timing of completion of the model and studies. In making the forward-looking statements contained in this press release, the Company has made certain assumptions, including, but not limited to outcomes associated with analogous deposits, 3D modeling predictions and estimates regarding mineralization and otherwise, and optimization works at the Montauban project. Although the Company believes that the expectations reflected in forward-looking statements are reasonable, it can give no assurance that the expectations of any forward-looking statements will prove to be correct. Known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to modeling risk, general business, economic, competitive, political and social uncertainties. Accordingly, readers should not place undue reliance on the forward-looking statements and information contained in this press release. Except as required by law, Ascendant disclaims any intention and assumes no obligation to update or revise any forward-looking statements to reflect actual results, whether as a result of new information, future events, changes in assumptions, changes in factors affecting such forward-looking statements or otherwise. Forward-looking information is subject to a variety of risks and uncertainties, which could cause actual events or results to differ from those reflected in the forward-looking information, including, without limitation, the risks described under the Company's continuous disclosure documents filed with Canadian securities regulators, which filings are available on SEDAR+ at www.sedarplus.com. The risk factors referred to above are not an exhaustive list of the factors that may affect any of the Company's forward-looking information. The Company's statements containing forward-looking information are based on the beliefs, expectations and opinions of management on the date the statements are made, and the Company does not assume any obligation to update such forward-looking information if circumstances or management's beliefs, expectations or opinions should change, other than as required by applicable law. For the reasons set forth above, one should not place undue reliance on forward-looking information.

Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

SOURCE: ESGold Corp



View the original press release on ACCESS Newswire

B.Martinez--TFWP