The Fort Worth Press - Dateline Resources Acquires 100% of Argos, America's Largest known Strontium Mine, Supporting U.S. Efforts to Secure Domestic Mineral Supply

USD -
AED 3.6725
AFN 64.999721
ALL 81.318192
AMD 362.547991
ANG 1.789785
AOA 917.000294
ARS 1517.777015
AUD 1.434082
AWG 1.80125
AZN 1.704567
BAM 1.742182
BBD 2.019847
BDT 123.364303
BGN 1.747831
BHD 0.379293
BIF 3001.563314
BMD 1
BND 1.282898
BOB 11.708429
BRL 5.062797
BSD 1.002717
BTN 95.180449
BWP 13.73935
BYN 3.020016
BYR 19600
BZD 2.016996
CAD 1.41139
CDF 2313.499676
CHF 0.824385
CLF 0.024881
CLP 979.260338
CNY 6.691197
CNH 6.68104
COP 3176.32
CRC 455.723715
CUC 1
CUP 24.068911
CVE 98.222001
CZK 21.675799
DJF 178.583836
DKK 6.660298
DOP 61.517357
DZD 134.5502
EGP 53.531296
ERN 15
ETB 163.810406
EUR 0.890971
FJD 2.25945
FKP 0.750648
GBP 0.750145
GEL 2.589958
GGP 0.750648
GHS 11.711102
GIP 0.750648
GMD 73.498524
GNF 8822.690992
GTQ 7.662467
GYD 209.814628
HKD 7.84765
HNL 26.922083
HRK 6.711901
HTG 131.336662
HUF 322.907975
IDR 18038
ILS 3.10047
IMP 0.750648
INR 94.769024
IQD 1520.296452
IRR 1795877.502842
ISK 121.35006
JEP 0.750648
JMD 159.414222
JOD 0.708977
JPY 158.103502
KES 129.97991
KGS 87.450172
KHR 4076.487593
KMF 440.000064
KPW 899.999961
KRW 1330.365026
KWD 0.31073
KYD 0.835731
KZT 453.817443
LAK 22565.272
LBP 89806.433223
LKR 332.145625
LRD 170.751234
LSL 16.484977
LTL 2.95274
LVL 0.60489
LYD 6.439546
MAD 9.74301
MDL 17.99111
MGA 4513.568766
MKD 54.892166
MMK 2099.513869
MNT 3596.411813
MOP 8.107446
MRU 40.092106
MUR 47.249982
MVR 15.460191
MWK 1738.975517
MXN 18.47089
MYR 4.082203
MZN 63.901297
NAD 16.484977
NGN 1333.710107
NIO 36.906713
NOK 9.43039
NPR 152.289753
NZD 1.767485
OMR 0.384506
PAB 1.002837
PEN 3.449551
PGK 4.553816
PHP 63.092962
PKR 277.617784
PLN 3.892197
PYG 5727.723787
QAR 3.660721
RON 4.747098
RSD 104.616997
RUB 83.075381
RWF 1480.211293
SAR 3.763551
SBD 8.064647
SCR 14.141171
SDG 601.499016
SEK 9.912185
SGD 1.279365
SHP 0.754745
SLE 24.680201
SLL 20969.504398
SOS 573.128691
SRD 37.7945
STD 20697.981008
STN 21.825114
SVC 8.775087
SYP 13001.999685
SZL 16.478563
THB 33.5515
TJS 9.228751
TMT 3.51
TND 2.98768
TOP 2.40776
TRY 49.552298
TTD 6.808242
TWD 32.504098
TZS 2643.31497
UAH 44.982296
UGX 4142.133065
UYU 40.314905
UZS 12089.683862
VES 878.910599
VND 25912
VUV 118.97233
WST 2.787823
XAF 584.438683
XAG 0.0173
XAU 0.000239008592
XCD 2.70255
XCG 1.807395
XDR 0.707052
XOF 584.438683
XPF 106.234578
YER 236.149344
ZAR 16.45654
ZMK 9001.19826
ZMW 20.07732
ZWL 321.999592
SSP 5750.775019
MXV 2.085175
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Dateline Resources Acquires 100% of Argos, America's Largest known Strontium Mine, Supporting U.S. Efforts to Secure Domestic Mineral Supply
Dateline Resources Acquires 100% of Argos, America's Largest known Strontium Mine, Supporting U.S. Efforts to Secure Domestic Mineral Supply

Dateline Resources Acquires 100% of Argos, America's Largest known Strontium Mine, Supporting U.S. Efforts to Secure Domestic Mineral Supply

SAN BERNARDINO COUNTY, CA / ACCESS Newswire / September 15, 2025 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF)(FSE:YE1) is pleased to announce that it has completed the acquisition of a 100% interest in the Argos Strontium Project, securing 100% ownership of the largest known strontium deposit in the United States at a time when the nation relies entirely on imports for its strontium supply. This strategic acquisition strengthens Dateline's critical minerals portfolio, aligning with U.S. priorities to secure domestic production of minerals vital to national security. The Argos project, located ~100 km from Dateline's flagship Colosseum Gold and Rare Earth Elements (REE) mine, will now be fully controlled by Dateline and advanced alongside its core gold-REE operations.

Text size:

Highlights

  • Acquisition Completed: Dateline Resources has completed the acquisition of an 100% interest in the Argos Strontium Project in California, marking the official closure of the deal and securing a major U.S. strontium asset for its critical minerals portfolio.

  • Largest U.S. Strontium Deposit: The Argos deposit is the largest known strontium deposit in the United States and essentially the only domestic strontium deposit of scale, with no other U.S. strontium mines or production facilities currently in operation.

  • Strategic Supply Alignment: The Argos Project enhances U.S. supply-chain security for strontium, aligning with the the U.S. Administration's strategic minerals agenda to secure domestic sources of essential materials and reduce reliance on foreign supply.

  • DoD-Backed Importance: The U.S. Department of War has committed $192.5 million under the Defense Production Act to establish domestic manufacturing of defense-critical chemicals, including strontium compounds, underscoring strontium's strategic importance to national security and industrial supply chains.

  • Portfolio and Policy Fit: Adding Argos bolsters Dateline's growing strategic minerals portfolio, complementing its existing Colosseum rare earth project and broadening the company's exposure to critical elements needed for high-tech and defense industries.

Stephen Baghdadi, Managing Director of Dateline Resources, commented:

"Consolidating 100% ownership of the Argos strontium project is a significant milestone for Dateline. It gives us full control over a uniquely strategic asset at a time when the U.S. is urgently seeking domestic sources of minerals. Argos is a natural fit within our portfolio, it's near our Colosseum project and complements our focus on minerals needed for advanced technologies. We intend to progress Argos in a disciplined manner that adds value without detracting from Colosseum's development. With strontium's importance in electric vehicles, defense ordnance, and even space systems growing, having the only American strontium deposit of note puts Dateline in an enviable position. We look forward to advancing Argos alongside our flagship gold-REE project and delivering on our strategy to supply materials crucial to the nation's industrial and security needs."

Strategic Importance to U.S. Supply Security

The Argos Strontium Project directly supports U.S. national security and supply chain resiliency goals. Notably, the United States has no active strontium mines or production facilities and has not mined strontium domestically since 1959. As a result, 100% of U.S. strontium demand is met by imports, leaving critical industries vulnerable to supply disruptions. The awareness of the strategic value of strontium is rising, especially as allies like the EU have declared strontium a critical material.

U.S. government initiatives underscore the importance of establishing domestic sources. The Department of War recently announced $192.5 million in funding to boost domestic production of critical chemicals for defense systems, including specialized strontium compounds used in munitions. For example, rocket propellant manufacturer Estes Energetics was awarded $13.0 million to domestically produce strontium-based oxidizers (strontium nitrate, strontium oxalate, strontium peroxide) for military applications.

Unique World-Class Strontium Deposit at Argos

The Argos deposit is known for its exceptional purity and geology. It is a celestite-hosted strontium deposit (celestite being strontium sulfate), with high inherent ore grades and very low barium content. Historical analyses of Argos material showed up to 95% strontium sulfate (SrSO₄) indicating a very high-purity celestite resource. Crucially, the deposit's geochemistry means there is minimal barite (barium sulfate) impurity, which is significant because many strontium occurrences worldwide are rendered uneconomic by high barium or calcium content. Argos' clean metallurgy should allow strontium concentrate to be produced with minimal processing avoiding the costly beneficiation steps required for lower-grade deposits.

The deposit consists of stratiform celestite beds near surface, making it amenable to open-pit mining. Strontium mineralization at Argos is exposed along a 4,000-foot stretch of the Cady Mountains foothills. These shallow, flat-lying ore horizons were historically mined by trenching and shallow underground workings, demonstrating the ease of access. The DuPont company operated the Argos mine in the mid-20th century, producing high-grade strontium concentrates until 1959. The presence of an existing trench and the absence of significant overburden highlight the deposit's potential for low strip-ratio, open-pit development.

Dateline assayed a series of rock chip samples in 2023 and reported results up to 49.8% SrO (equivalent to 88% SrSO4), consistent with historic reports of high-grade celestite from the district. A small gravity survey was completed, with the Company planning to have a 3D inversion model completed.

Comparisons to Global Strontium Deposits

With 100% ownership of Argos, Dateline controls a deposit comparable in scale and quality to the world's top strontium sources. Globally, strontium production today is dominated by a few key regions: China, Iran, Mexico, and Spain account for nearly all production. These operations succeed because they exploit large, high-grade deposits, a model Argos fits squarely into. For example, Mexico (the largest exporter to the U.S.) and Turkey mine material that often exceeds 90% SrSO₄ content, requiring only crushing and hand-sorting to reach market specifications In Spain's Montevive-Escúzar deposit, by contrast, run of mine grades are ~60% SrSO₄, necessitating a beneficiation plant to upgrade concentrate to 90% purity. Many lower-grade or impurity-laden deposits around the world remain undeveloped because the cost of removing barite or other contaminants is prohibitive.

Argos distinguishes itself by combining world-class grade, thickness, and accessibility. Like the top Mexican deposits, Argos' celestite is high-purity and near-surface, suggesting it can achieve favorable production economics on par with established producers. Notably, most strontium mines globally are able to operate profitably only if feedstock is at least 80% strontium sulfate, a benchmark that Argos comfortably meets. This gives Dateline confidence that Argos can be developed as a cost-competitive domestic source, especially given its proximity to infrastructure (road and rail are adjacent to the claims) and the growing U.S. demand for strontium in advanced manufacturing.

Growing Demand in Defense

Strontium's market dynamics are increasingly attractive due to emerging applications. In the defense arena, strontium compounds have long been used in signal flares, fireworks, and propellants, imparting the bright red hues in pyrotechnics and tracer rounds. The U.S. military's push to onshore production of these energetic materials, exemplified by the Estes Energetics project, is directly tied to strontium supply.

Complementary to Dateline's Colosseum Project

Dateline reiterates that developing Argos will complement, not distract from, its flagship Colosseum Gold and Rare Earths project. The Colosseum mine, a past-producing gold operation with recently identified REE potential, remains the company's primary focus for near-term development. Bringing Argos into full ownership simply adds a valuable strategic asset alongside Colosseum. The two projects are geographically close (both in San Bernardino County, CA) and share operational synergies. The company's U.S. team can leverage its existing regional expertise and stakeholder relationships to advance Argos efficiently in parallel with Colosseum.

Transaction Details and Path Forward

Under the finalized acquisition agreement, Dateline has acquired a 100% interest Western Strontium, the owner of the four patented claims. Consideration for the purchase of the 100% interest has been agreed at eight million fully-paid ordinary Dateline shares, representing approximately A$2 million in value. The vendor will also retain a 1.25% Net Smelter Royalty (NSR) on the Argos project; To align the vendor with Dateline's long-term success, the issued shares will be subject to escrow lock-up and released in staged intervals (1 million shares per month for 8 months).

This structure ensures an orderly addition of equity and demonstrates the vendor's confidence in Argos' future. Notably, the share-based consideration conserves Dateline's cash while granting the vendor upside exposure as Dateline adds value to Argos.

Next Steps at Argos

Dateline's technical team is now integrating historical data and planning the next phase of exploration at Argos, which is expected to include modelling of gravity data, confirmatory drilling to define a JORC-compliant mineral resource and metallurgical testwork on representative material.

This press release has been authorized for release by the Board of Dateline Resources Limited.

For more information, please contact:

Stephen Baghdadi
Managing Director
+61 2 9375 2353

Andrew Rowell
Corporate & Investor Relations Manager
+61 400 466 226
[email protected]
www.datelineresources.com.au

Follow Dateline on socials:
X - @Dateline_DTR
Truth Social - @dateline_resources
LinkedIn - dateline-resources

About Dateline Resources Limited

Dateline Resources Limited (ASX: DTR, OTCQB: DTREF, FSE: YE1) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Pass Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Dateline has also acquired the high-grade Argos Strontium Project, also located in San Bernadino County, California. Argos is reportedly the largest strontium deposit in the U.S. with previous celestite production grading 95%+ SrSO4.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Company Confirmations

The Company confirms it is not aware of any new information or data that materially affects the information included in the announcements dated 23 October 2024 with regard to the Colosseum MRE and 23 May 2025 with regard to Colosseum Project Economics. Similarly, the Company confirms that all material assumptions and technical parameters underpinning the estimates and the forecast financial information referred to in those previous announcements continue to apply and have not materially changed.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

D.Johnson--TFWP