The Fort Worth Press - ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas

USD -
AED 3.672503
AFN 65.999852
ALL 81.873378
AMD 378.43987
ANG 1.79008
AOA 917.000491
ARS 1445.0428
AUD 1.425192
AWG 1.8
AZN 1.701926
BAM 1.658498
BBD 2.01317
BDT 122.152876
BGN 1.67937
BHD 0.376919
BIF 2961.725511
BMD 1
BND 1.270543
BOB 6.906845
BRL 5.228904
BSD 0.999546
BTN 90.307481
BWP 13.806116
BYN 2.86383
BYR 19600
BZD 2.010235
CAD 1.36427
CDF 2155.000115
CHF 0.774745
CLF 0.021839
CLP 861.999947
CNY 6.946501
CNH 6.93494
COP 3632.08
CRC 496.408795
CUC 1
CUP 26.5
CVE 93.503553
CZK 20.593989
DJF 177.719935
DKK 6.319765
DOP 62.937775
DZD 129.865503
EGP 47.013897
ERN 15
ETB 155.042675
EUR 0.84615
FJD 2.1993
FKP 0.732491
GBP 0.73007
GEL 2.695024
GGP 0.732491
GHS 10.950041
GIP 0.732491
GMD 73.500677
GNF 8769.058562
GTQ 7.666672
GYD 209.120397
HKD 7.812175
HNL 26.408086
HRK 6.3756
HTG 131.107644
HUF 322.251037
IDR 16758
ILS 3.082015
IMP 0.732491
INR 90.48545
IQD 1309.380459
IRR 42125.000158
ISK 122.69594
JEP 0.732491
JMD 156.640605
JOD 0.708969
JPY 155.718977
KES 128.999825
KGS 87.449964
KHR 4033.037668
KMF 418.00027
KPW 899.987247
KRW 1449.560268
KWD 0.307102
KYD 0.83298
KZT 501.119346
LAK 21499.832523
LBP 89508.041026
LKR 309.380459
LRD 185.911623
LSL 16.009531
LTL 2.95274
LVL 0.60489
LYD 6.319217
MAD 9.168716
MDL 16.926717
MGA 4429.877932
MKD 52.134305
MMK 2100.119929
MNT 3568.429082
MOP 8.04357
MRU 39.901294
MUR 45.889873
MVR 15.449947
MWK 1733.257012
MXN 17.252485
MYR 3.932502
MZN 63.750037
NAD 16.009531
NGN 1387.419629
NIO 36.785781
NOK 9.64092
NPR 144.492309
NZD 1.65348
OMR 0.384493
PAB 0.999521
PEN 3.364907
PGK 4.282347
PHP 59.059528
PKR 279.545138
PLN 3.573615
PYG 6631.277242
QAR 3.634567
RON 4.310899
RSD 99.326542
RUB 76.88768
RWF 1458.783824
SAR 3.750079
SBD 8.058101
SCR 13.733114
SDG 601.509021
SEK 8.90901
SGD 1.269935
SHP 0.750259
SLE 24.474972
SLL 20969.499267
SOS 570.272883
SRD 38.114501
STD 20697.981008
STN 20.775741
SVC 8.746163
SYP 11059.574895
SZL 16.015332
THB 31.656032
TJS 9.340767
TMT 3.51
TND 2.890372
TOP 2.40776
TRY 43.476498
TTD 6.770319
TWD 31.591998
TZS 2584.039876
UAH 43.256279
UGX 3563.251531
UYU 38.49872
UZS 12236.487289
VES 371.640565
VND 26002
VUV 119.537583
WST 2.726316
XAF 556.244594
XAG 0.011829
XAU 0.000202
XCD 2.70255
XCG 1.801384
XDR 0.691072
XOF 556.244594
XPF 101.131218
YER 238.375017
ZAR 15.966098
ZMK 9001.213126
ZMW 19.615608
ZWL 321.999592
  • RYCEF

    0.2800

    16.95

    +1.65%

  • CMSC

    -0.1050

    23.645

    -0.44%

  • SCS

    0.0200

    16.14

    +0.12%

  • RBGPF

    0.1000

    82.5

    +0.12%

  • GSK

    0.7600

    53.23

    +1.43%

  • NGG

    1.5300

    86.14

    +1.78%

  • BCC

    2.8900

    84.64

    +3.41%

  • RIO

    3.6260

    96.146

    +3.77%

  • CMSD

    -0.1700

    23.91

    -0.71%

  • BTI

    0.7750

    61.765

    +1.25%

  • VOD

    0.3250

    15.235

    +2.13%

  • BCE

    0.3550

    26.185

    +1.36%

  • RELX

    -5.0450

    30.485

    -16.55%

  • AZN

    -4.7100

    183.7

    -2.56%

  • JRI

    -0.0500

    13.1

    -0.38%

  • BP

    1.0900

    38.79

    +2.81%

ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas
ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas

ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas

Construction advancing at Montauban as Company evaluates broader tailings pipeline across the Americas

Text size:

VANCOUVER, BC / ACCESS Newswire / August 7, 2025 / ESGold Corp. ("ESGold" or the "Company") (CSE:ESAU)(OTCQB:ESAUF)(FSE:Z7D), a clean gold and silver development company, is pleased to provide an update on its scalable growth strategy, rooted in a replicable tailings-first development model designed to deliver near-term production, fund exploration internally, and minimize environmental impact across legacy mine sites in the Americas.

Key Highlights

  • ESGold advancing construction of its fully permitted Montauban Project in Quebec, with near-term gold and silver production from tailings on track for 2026

  • Recent passive seismic imaging confirms possible district-scale geology at Montauban, validating exploration upside alongside cash-flow potential

  • Company actively evaluating legacy tailings opportunities across North and South America to replicate its clean, high-margin production model

  • Tailings reprocessing represents a largely untapped multi-billion-dollar opportunity across over 500,000 historic mining sites in North America alone

  • Scalable, low-capex approach offers a more efficient path to cash flow and discovery than traditional "explore, raise, dilute" models.

  • Strategy aligns with market appetite for clean, short-term cash-generating assets in the resource sector

Construction at the Company's flagship Montauban Project in Quebec is well underway, with initial production from gold- and silver-bearing tailings targeted for 2026. While tailings reprocessing will serve as a cash-generating engine for ESGold, recent passive seismic and academic findings have possibly confirmed the presence of a deeper, vertically extensive mineralized system. With more than 2,500 metres of strike length and over 1,200 metres of vertical continuity now interpreted through advanced Ambient Noise Tomography (ANT) imaging, Montauban is emerging as a highly prospective, multi-lens, possible district-scale gold-silver system.

"There's an enormous untapped economic and environmental opportunity here," added Paul Mastantuono, COO and Chairman. "With permitting in place and construction advancing at Montauban, we're proving that sustainable, scalable, clean mining is not only possible - it's happening. We're turning tailings into a potential resource and using that foundation to explore for something much bigger."

This dual opportunity-clean, low-cost production with possible district-scale exploration upside-is the foundation of ESGold's growth strategy.

A Scalable Opportunity Across the Americas

Legacy tailings sites represent one of the most overlooked opportunities in modern mining. According to U.S. environmental data, there are more than 500,000 abandoned mine sites in North America, many of which contain unevaluated tailings piles with residual precious and base metals. In South America, the number is even larger, as decades of small- to mid-scale mining operations have left behind extensive tailings volumes across gold-rich regions of Peru, Bolivia, Colombia, and Chile.

Most of these sites have never undergone systematic exploration, modern mineralogical analysis, or high-resolution geophysics. They also carry legacy environmental liabilities for landowners, municipalities, and governments - liabilities ESGold's model is uniquely positioned to solve.

ESGold is currently evaluating tailings projects in multiple jurisdictions with the intent to replicate its Montauban blueprint: low-capex processing of tailings to generate cash flow, which is then used to fund high-quality exploration and development activities. This model, once proven at Montauban, is designed to scale quickly across jurisdictions.

"The traditional exploration model has eroded more capital than it's created," said Gordon Robb, CEO of ESGold Corp. "Our approach reverses that equation. We begin with production - monetizing what others left behind - then reinvest from a position of strength into exploration. Montauban is our proof-of-concept. We believe this model can scale to dozens, even hundreds of other tailings sites across the Americas and elsewhere."

What's Next for ESGold

  • Construction continues at Montauban with initial tailings production anticipated in 2026

  • 3D geological model incorporating ANT data, historic drilling, and structural interpretation is underway to refine drill targets

  • Concentrate assays from pre-production sampling are pending and expected to be released shortly

  • The Company is evaluating expansion opportunities across North and South America to replicate its production-first development model

  • Updated Preliminary Economic Assessment (PEA) expected to reflect current commodity prices, revised inputs, and enhanced project economics

A Smarter, Cleaner Growth Path for Mining

ESGold's business model aligns with what institutional capital increasingly demands from the resource sector: scalable, predictable cash flow and responsible development. In contrast to traditional resource companies that rely on speculative exploration, repetitive dilution, and decade-long development timelines, the Company's strategy puts production first - creating revenue, reducing risk, and unlocking discovery potential along the way.

As global attention turns to modernizing mining practices and cleaning up the sector's legacy, ESGold is positioned at the intersection of economic performance and environmental responsibility. With Montauban leading the way, the Company is actively seeking to build a replicable platform to clean up yesterday's mines, produce today's cash flow, and unlock tomorrow's discoveries.

Qualified Person Statement

The technical content of this release has been reviewed and approved by André Gauthier, P.Geo. and P. Eng, a Director of ESGold and Qualified Person under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Other Corporate News

In other Company business, the Board of Directors is pleased to announce the issuance to consultants and officer of 1.85 million options to purchase one (1) ESGold common share for a price of $1.36 for a period of five (5) years. The issuance of these options is subject to regulatory vesting provisons and subject to approval from the CSE.

About ESGold Corp.
ESGold Corp. (CSE: ESAU | OTCQB: ESAUF | FSE: Z7D) is a fully permitted, pre-production gold and silver mining company at the forefront of scalable clean mining and exploration innovation. With proven expertise in Quebec, the Company is advancing its Montauban Gold-Silver Project toward near-term production while unlocking long-term value through strategic redevelopment, modern discovery tools, and sustainable resource recovery. Montauban, located 80 km west of Quebec City, represents a blueprint for cash-flow-generating legacy site redevelopment across North America.

For more information, please contact ESGold Corp. at +1-888-370-1059 or visit esgold.com for additional resources, including a French version of this press release, past news releases, a 3D model of the Montauban processing plant, media interviews, and opinion-editorial pieces.

Stay connected by following us on X (formerly Twitter), LinkedIn, and joining our Telegram channel.

For further information or to connect directly, please reach out to Gordon Robb, CEO of ESGold Corp. at [email protected] or call 250-217-2321.

On behalf of the Board of Directors
ESGold Corp.
"Paul Mastantuono"
Chairman & COO
[email protected]
+1-888-370-1059

Cautionary Note Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities laws, including statements regarding future production, cash flow, exploration results, project economics, and permitting. Forward-looking information is based on reasonable assumptions that management believes are current but involve known and unknown risks and uncertainties that may cause actual results to differ materially. These risks are detailed in the Company's public filings on SEDAR+. Readers are cautioned not to place undue reliance on such statements. ESGold disclaims any obligation to update or revise any forward-looking information, except as required by law.

Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

SOURCE: ESGold Corp.



View the original press release on ACCESS Newswire

C.Rojas--TFWP