The Fort Worth Press - ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas

USD -
AED 3.672504
AFN 65.503991
ALL 83.072963
AMD 376.980403
ANG 1.790083
AOA 917.000367
ARS 1386.420402
AUD 1.448436
AWG 1.80025
AZN 1.70397
BAM 1.695072
BBD 2.009612
BDT 122.428639
BGN 1.709309
BHD 0.378163
BIF 2970
BMD 1
BND 1.2851
BOB 6.894519
BRL 5.160604
BSD 0.997742
BTN 92.939509
BWP 13.688562
BYN 2.956504
BYR 19600
BZD 2.006665
CAD 1.39475
CDF 2305.000362
CHF 0.799879
CLF 0.023281
CLP 919.250396
CNY 6.88265
CNH 6.886225
COP 3668.42
CRC 464.279833
CUC 1
CUP 26.5
CVE 96.000359
CZK 21.288304
DJF 177.720393
DKK 6.487804
DOP 60.850393
DZD 133.256954
EGP 54.334939
ERN 15
ETB 155.800822
EUR 0.86804
FJD 2.253804
FKP 0.757614
GBP 0.757461
GEL 2.68504
GGP 0.757614
GHS 11.00504
GIP 0.757614
GMD 74.000355
GNF 8780.000355
GTQ 7.632939
GYD 208.828972
HKD 7.83775
HNL 26.504427
HRK 6.539104
HTG 130.952897
HUF 333.930388
IDR 16994.6
ILS 3.130375
IMP 0.757614
INR 92.73995
IQD 1307.141959
IRR 1319175.000352
ISK 125.380386
JEP 0.757614
JMD 157.303566
JOD 0.70904
JPY 159.65404
KES 129.803801
KGS 87.450384
KHR 3990.137323
KMF 427.00035
KPW 899.985922
KRW 1511.260383
KWD 0.30934
KYD 0.831502
KZT 472.805432
LAK 21970.392969
LBP 89502.03926
LKR 314.804623
LRD 183.088277
LSL 16.955078
LTL 2.95274
LVL 0.60489
LYD 6.380628
MAD 9.374033
MDL 17.55613
MGA 4171.343141
MKD 53.495639
MMK 2099.969769
MNT 3573.217716
MOP 8.055104
MRU 39.637211
MUR 46.950378
MVR 15.460378
MWK 1730.071718
MXN 17.891704
MYR 4.031039
MZN 63.950377
NAD 16.954711
NGN 1378.130377
NIO 36.712196
NOK 9.77265
NPR 148.701282
NZD 1.756852
OMR 0.385097
PAB 0.997734
PEN 3.45194
PGK 4.316042
PHP 60.409504
PKR 278.39991
PLN 3.71375
PYG 6454.29687
QAR 3.638018
RON 4.416604
RSD 101.901662
RUB 80.325739
RWF 1457.240049
SAR 3.754308
SBD 8.038772
SCR 14.424038
SDG 601.000339
SEK 9.483504
SGD 1.286704
SHP 0.750259
SLE 24.650371
SLL 20969.510825
SOS 570.192924
SRD 37.351038
STD 20697.981008
STN 21.233539
SVC 8.730169
SYP 110.556627
SZL 16.948198
THB 32.635038
TJS 9.563492
TMT 3.51
TND 2.941459
TOP 2.40776
TRY 44.520504
TTD 6.768937
TWD 31.995038
TZS 2600.000335
UAH 43.698134
UGX 3743.234401
UYU 40.405091
UZS 12122.393971
VES 473.390504
VND 26340
VUV 119.346905
WST 2.766243
XAF 568.506489
XAG 0.013693
XAU 0.000214
XCD 2.70255
XCG 1.798209
XDR 0.708068
XOF 568.516344
XPF 103.361457
YER 238.650363
ZAR 16.972865
ZMK 9001.203584
ZMW 19.281421
ZWL 321.999592
  • RBGPF

    -13.5000

    69

    -19.57%

  • CMSD

    0.1100

    22.26

    +0.49%

  • BCC

    -1.8800

    73.2

    -2.57%

  • JRI

    0.0900

    12.61

    +0.71%

  • GSK

    0.7000

    56.69

    +1.23%

  • RELX

    0.3600

    33.59

    +1.07%

  • NGG

    1.1500

    87.99

    +1.31%

  • CMSC

    0.0500

    22.04

    +0.23%

  • BCE

    -0.9300

    24.45

    -3.8%

  • RIO

    -0.3600

    94.45

    -0.38%

  • AZN

    2.7600

    203.49

    +1.36%

  • VOD

    0.0800

    15.21

    +0.53%

  • BTI

    0.3900

    58.28

    +0.67%

  • RYCEF

    0.9000

    15.99

    +5.63%

  • BP

    0.9500

    47.12

    +2.02%

ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas
ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas

ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas

Construction advancing at Montauban as Company evaluates broader tailings pipeline across the Americas

Text size:

VANCOUVER, BC / ACCESS Newswire / August 7, 2025 / ESGold Corp. ("ESGold" or the "Company") (CSE:ESAU)(OTCQB:ESAUF)(FSE:Z7D), a clean gold and silver development company, is pleased to provide an update on its scalable growth strategy, rooted in a replicable tailings-first development model designed to deliver near-term production, fund exploration internally, and minimize environmental impact across legacy mine sites in the Americas.

Key Highlights

  • ESGold advancing construction of its fully permitted Montauban Project in Quebec, with near-term gold and silver production from tailings on track for 2026

  • Recent passive seismic imaging confirms possible district-scale geology at Montauban, validating exploration upside alongside cash-flow potential

  • Company actively evaluating legacy tailings opportunities across North and South America to replicate its clean, high-margin production model

  • Tailings reprocessing represents a largely untapped multi-billion-dollar opportunity across over 500,000 historic mining sites in North America alone

  • Scalable, low-capex approach offers a more efficient path to cash flow and discovery than traditional "explore, raise, dilute" models.

  • Strategy aligns with market appetite for clean, short-term cash-generating assets in the resource sector

Construction at the Company's flagship Montauban Project in Quebec is well underway, with initial production from gold- and silver-bearing tailings targeted for 2026. While tailings reprocessing will serve as a cash-generating engine for ESGold, recent passive seismic and academic findings have possibly confirmed the presence of a deeper, vertically extensive mineralized system. With more than 2,500 metres of strike length and over 1,200 metres of vertical continuity now interpreted through advanced Ambient Noise Tomography (ANT) imaging, Montauban is emerging as a highly prospective, multi-lens, possible district-scale gold-silver system.

"There's an enormous untapped economic and environmental opportunity here," added Paul Mastantuono, COO and Chairman. "With permitting in place and construction advancing at Montauban, we're proving that sustainable, scalable, clean mining is not only possible - it's happening. We're turning tailings into a potential resource and using that foundation to explore for something much bigger."

This dual opportunity-clean, low-cost production with possible district-scale exploration upside-is the foundation of ESGold's growth strategy.

A Scalable Opportunity Across the Americas

Legacy tailings sites represent one of the most overlooked opportunities in modern mining. According to U.S. environmental data, there are more than 500,000 abandoned mine sites in North America, many of which contain unevaluated tailings piles with residual precious and base metals. In South America, the number is even larger, as decades of small- to mid-scale mining operations have left behind extensive tailings volumes across gold-rich regions of Peru, Bolivia, Colombia, and Chile.

Most of these sites have never undergone systematic exploration, modern mineralogical analysis, or high-resolution geophysics. They also carry legacy environmental liabilities for landowners, municipalities, and governments - liabilities ESGold's model is uniquely positioned to solve.

ESGold is currently evaluating tailings projects in multiple jurisdictions with the intent to replicate its Montauban blueprint: low-capex processing of tailings to generate cash flow, which is then used to fund high-quality exploration and development activities. This model, once proven at Montauban, is designed to scale quickly across jurisdictions.

"The traditional exploration model has eroded more capital than it's created," said Gordon Robb, CEO of ESGold Corp. "Our approach reverses that equation. We begin with production - monetizing what others left behind - then reinvest from a position of strength into exploration. Montauban is our proof-of-concept. We believe this model can scale to dozens, even hundreds of other tailings sites across the Americas and elsewhere."

What's Next for ESGold

  • Construction continues at Montauban with initial tailings production anticipated in 2026

  • 3D geological model incorporating ANT data, historic drilling, and structural interpretation is underway to refine drill targets

  • Concentrate assays from pre-production sampling are pending and expected to be released shortly

  • The Company is evaluating expansion opportunities across North and South America to replicate its production-first development model

  • Updated Preliminary Economic Assessment (PEA) expected to reflect current commodity prices, revised inputs, and enhanced project economics

A Smarter, Cleaner Growth Path for Mining

ESGold's business model aligns with what institutional capital increasingly demands from the resource sector: scalable, predictable cash flow and responsible development. In contrast to traditional resource companies that rely on speculative exploration, repetitive dilution, and decade-long development timelines, the Company's strategy puts production first - creating revenue, reducing risk, and unlocking discovery potential along the way.

As global attention turns to modernizing mining practices and cleaning up the sector's legacy, ESGold is positioned at the intersection of economic performance and environmental responsibility. With Montauban leading the way, the Company is actively seeking to build a replicable platform to clean up yesterday's mines, produce today's cash flow, and unlock tomorrow's discoveries.

Qualified Person Statement

The technical content of this release has been reviewed and approved by André Gauthier, P.Geo. and P. Eng, a Director of ESGold and Qualified Person under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Other Corporate News

In other Company business, the Board of Directors is pleased to announce the issuance to consultants and officer of 1.85 million options to purchase one (1) ESGold common share for a price of $1.36 for a period of five (5) years. The issuance of these options is subject to regulatory vesting provisons and subject to approval from the CSE.

About ESGold Corp.
ESGold Corp. (CSE: ESAU | OTCQB: ESAUF | FSE: Z7D) is a fully permitted, pre-production gold and silver mining company at the forefront of scalable clean mining and exploration innovation. With proven expertise in Quebec, the Company is advancing its Montauban Gold-Silver Project toward near-term production while unlocking long-term value through strategic redevelopment, modern discovery tools, and sustainable resource recovery. Montauban, located 80 km west of Quebec City, represents a blueprint for cash-flow-generating legacy site redevelopment across North America.

For more information, please contact ESGold Corp. at +1-888-370-1059 or visit esgold.com for additional resources, including a French version of this press release, past news releases, a 3D model of the Montauban processing plant, media interviews, and opinion-editorial pieces.

Stay connected by following us on X (formerly Twitter), LinkedIn, and joining our Telegram channel.

For further information or to connect directly, please reach out to Gordon Robb, CEO of ESGold Corp. at [email protected] or call 250-217-2321.

On behalf of the Board of Directors
ESGold Corp.
"Paul Mastantuono"
Chairman & COO
[email protected]
+1-888-370-1059

Cautionary Note Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities laws, including statements regarding future production, cash flow, exploration results, project economics, and permitting. Forward-looking information is based on reasonable assumptions that management believes are current but involve known and unknown risks and uncertainties that may cause actual results to differ materially. These risks are detailed in the Company's public filings on SEDAR+. Readers are cautioned not to place undue reliance on such statements. ESGold disclaims any obligation to update or revise any forward-looking information, except as required by law.

Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

SOURCE: ESGold Corp.



View the original press release on ACCESS Newswire

C.Rojas--TFWP