The Fort Worth Press - ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas

USD -
AED 3.672498
AFN 66.374624
ALL 82.891062
AMD 382.105484
ANG 1.790055
AOA 917.000062
ARS 1446.012497
AUD 1.507159
AWG 1.80125
AZN 1.696321
BAM 1.678236
BBD 2.018646
BDT 122.628476
BGN 1.678799
BHD 0.377004
BIF 2961.256275
BMD 1
BND 1.297979
BOB 6.925579
BRL 5.308276
BSD 1.002244
BTN 90.032049
BWP 13.315657
BYN 2.90153
BYR 19600
BZD 2.015729
CAD 1.39434
CDF 2229.999722
CHF 0.803265
CLF 0.023388
CLP 917.48999
CNY 7.07165
CNH 7.06845
COP 3796.99
CRC 491.421364
CUC 1
CUP 26.5
CVE 94.616395
CZK 20.780297
DJF 178.481789
DKK 6.41071
DOP 63.686561
DZD 130.095982
EGP 47.573803
ERN 15
ETB 156.280403
EUR 0.85834
FJD 2.25895
FKP 0.748861
GBP 0.749415
GEL 2.702791
GGP 0.748861
GHS 11.416779
GIP 0.748861
GMD 73.000197
GNF 8709.00892
GTQ 7.677291
GYD 209.68946
HKD 7.78486
HNL 26.389336
HRK 6.469717
HTG 131.282447
HUF 327.824502
IDR 16672.15
ILS 3.227675
IMP 0.748861
INR 89.943497
IQD 1312.956662
IRR 42125.000154
ISK 127.891881
JEP 0.748861
JMD 160.623651
JOD 0.708935
JPY 155.116016
KES 129.350006
KGS 87.450106
KHR 4014.227424
KMF 422.000183
KPW 899.993191
KRW 1472.790097
KWD 0.30692
KYD 0.83526
KZT 506.587952
LAK 21742.171042
LBP 89752.828464
LKR 309.374155
LRD 176.902912
LSL 17.013777
LTL 2.95274
LVL 0.60489
LYD 5.447985
MAD 9.247548
MDL 17.048443
MGA 4457.716053
MKD 52.892165
MMK 2099.939583
MNT 3546.502114
MOP 8.035628
MRU 39.710999
MUR 46.070021
MVR 15.410227
MWK 1737.95151
MXN 18.18323
MYR 4.110977
MZN 63.897632
NAD 17.013777
NGN 1451.00023
NIO 36.881624
NOK 10.10595
NPR 144.049872
NZD 1.731465
OMR 0.384521
PAB 1.002325
PEN 3.37046
PGK 4.251065
PHP 59.062503
PKR 283.139992
PLN 3.631096
PYG 6950.492756
QAR 3.663323
RON 4.372698
RSD 100.76903
RUB 76.754244
RWF 1458.303837
SAR 3.753032
SBD 8.223823
SCR 13.591833
SDG 601.506379
SEK 9.409525
SGD 1.295095
SHP 0.750259
SLE 23.000169
SLL 20969.498139
SOS 571.823287
SRD 38.643499
STD 20697.981008
STN 21.023817
SVC 8.769634
SYP 11058.244165
SZL 17.008825
THB 31.850427
TJS 9.210862
TMT 3.5
TND 2.941946
TOP 2.40776
TRY 42.51338
TTD 6.795179
TWD 31.288803
TZS 2440.000231
UAH 42.259148
UGX 3553.316915
UYU 39.265994
UZS 11939.350775
VES 248.585899
VND 26360
VUV 122.070109
WST 2.790151
XAF 562.862377
XAG 0.017179
XAU 0.000237
XCD 2.70255
XCG 1.806356
XDR 0.70002
XOF 562.867207
XPF 102.334841
YER 238.40123
ZAR 16.92185
ZMK 9001.199161
ZMW 23.026725
ZWL 321.999592
  • RELX

    0.1800

    40.73

    +0.44%

  • NGG

    0.1200

    76.04

    +0.16%

  • CMSC

    0.0400

    23.48

    +0.17%

  • RBGPF

    0.0000

    78.35

    0%

  • RIO

    -0.2600

    73.49

    -0.35%

  • GSK

    -0.0950

    48.49

    -0.2%

  • SCS

    -0.0350

    16.19

    -0.22%

  • BTI

    -0.8000

    57.24

    -1.4%

  • RYCEF

    0.4600

    14.67

    +3.14%

  • AZN

    1.0000

    91.03

    +1.1%

  • VOD

    -0.1280

    12.505

    -1.02%

  • BCE

    0.1600

    23.38

    +0.68%

  • BP

    -0.9500

    36.29

    -2.62%

  • BCC

    -0.8950

    73.43

    -1.22%

  • JRI

    0.0201

    13.76

    +0.15%

  • CMSD

    -0.0554

    23.2845

    -0.24%

ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas
ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas

ESGold Explores Growth Strategy to Scale Tailings-to-Cash-Flow Model Across the Americas

Construction advancing at Montauban as Company evaluates broader tailings pipeline across the Americas

Text size:

VANCOUVER, BC / ACCESS Newswire / August 7, 2025 / ESGold Corp. ("ESGold" or the "Company") (CSE:ESAU)(OTCQB:ESAUF)(FSE:Z7D), a clean gold and silver development company, is pleased to provide an update on its scalable growth strategy, rooted in a replicable tailings-first development model designed to deliver near-term production, fund exploration internally, and minimize environmental impact across legacy mine sites in the Americas.

Key Highlights

  • ESGold advancing construction of its fully permitted Montauban Project in Quebec, with near-term gold and silver production from tailings on track for 2026

  • Recent passive seismic imaging confirms possible district-scale geology at Montauban, validating exploration upside alongside cash-flow potential

  • Company actively evaluating legacy tailings opportunities across North and South America to replicate its clean, high-margin production model

  • Tailings reprocessing represents a largely untapped multi-billion-dollar opportunity across over 500,000 historic mining sites in North America alone

  • Scalable, low-capex approach offers a more efficient path to cash flow and discovery than traditional "explore, raise, dilute" models.

  • Strategy aligns with market appetite for clean, short-term cash-generating assets in the resource sector

Construction at the Company's flagship Montauban Project in Quebec is well underway, with initial production from gold- and silver-bearing tailings targeted for 2026. While tailings reprocessing will serve as a cash-generating engine for ESGold, recent passive seismic and academic findings have possibly confirmed the presence of a deeper, vertically extensive mineralized system. With more than 2,500 metres of strike length and over 1,200 metres of vertical continuity now interpreted through advanced Ambient Noise Tomography (ANT) imaging, Montauban is emerging as a highly prospective, multi-lens, possible district-scale gold-silver system.

"There's an enormous untapped economic and environmental opportunity here," added Paul Mastantuono, COO and Chairman. "With permitting in place and construction advancing at Montauban, we're proving that sustainable, scalable, clean mining is not only possible - it's happening. We're turning tailings into a potential resource and using that foundation to explore for something much bigger."

This dual opportunity-clean, low-cost production with possible district-scale exploration upside-is the foundation of ESGold's growth strategy.

A Scalable Opportunity Across the Americas

Legacy tailings sites represent one of the most overlooked opportunities in modern mining. According to U.S. environmental data, there are more than 500,000 abandoned mine sites in North America, many of which contain unevaluated tailings piles with residual precious and base metals. In South America, the number is even larger, as decades of small- to mid-scale mining operations have left behind extensive tailings volumes across gold-rich regions of Peru, Bolivia, Colombia, and Chile.

Most of these sites have never undergone systematic exploration, modern mineralogical analysis, or high-resolution geophysics. They also carry legacy environmental liabilities for landowners, municipalities, and governments - liabilities ESGold's model is uniquely positioned to solve.

ESGold is currently evaluating tailings projects in multiple jurisdictions with the intent to replicate its Montauban blueprint: low-capex processing of tailings to generate cash flow, which is then used to fund high-quality exploration and development activities. This model, once proven at Montauban, is designed to scale quickly across jurisdictions.

"The traditional exploration model has eroded more capital than it's created," said Gordon Robb, CEO of ESGold Corp. "Our approach reverses that equation. We begin with production - monetizing what others left behind - then reinvest from a position of strength into exploration. Montauban is our proof-of-concept. We believe this model can scale to dozens, even hundreds of other tailings sites across the Americas and elsewhere."

What's Next for ESGold

  • Construction continues at Montauban with initial tailings production anticipated in 2026

  • 3D geological model incorporating ANT data, historic drilling, and structural interpretation is underway to refine drill targets

  • Concentrate assays from pre-production sampling are pending and expected to be released shortly

  • The Company is evaluating expansion opportunities across North and South America to replicate its production-first development model

  • Updated Preliminary Economic Assessment (PEA) expected to reflect current commodity prices, revised inputs, and enhanced project economics

A Smarter, Cleaner Growth Path for Mining

ESGold's business model aligns with what institutional capital increasingly demands from the resource sector: scalable, predictable cash flow and responsible development. In contrast to traditional resource companies that rely on speculative exploration, repetitive dilution, and decade-long development timelines, the Company's strategy puts production first - creating revenue, reducing risk, and unlocking discovery potential along the way.

As global attention turns to modernizing mining practices and cleaning up the sector's legacy, ESGold is positioned at the intersection of economic performance and environmental responsibility. With Montauban leading the way, the Company is actively seeking to build a replicable platform to clean up yesterday's mines, produce today's cash flow, and unlock tomorrow's discoveries.

Qualified Person Statement

The technical content of this release has been reviewed and approved by André Gauthier, P.Geo. and P. Eng, a Director of ESGold and Qualified Person under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Other Corporate News

In other Company business, the Board of Directors is pleased to announce the issuance to consultants and officer of 1.85 million options to purchase one (1) ESGold common share for a price of $1.36 for a period of five (5) years. The issuance of these options is subject to regulatory vesting provisons and subject to approval from the CSE.

About ESGold Corp.
ESGold Corp. (CSE: ESAU | OTCQB: ESAUF | FSE: Z7D) is a fully permitted, pre-production gold and silver mining company at the forefront of scalable clean mining and exploration innovation. With proven expertise in Quebec, the Company is advancing its Montauban Gold-Silver Project toward near-term production while unlocking long-term value through strategic redevelopment, modern discovery tools, and sustainable resource recovery. Montauban, located 80 km west of Quebec City, represents a blueprint for cash-flow-generating legacy site redevelopment across North America.

For more information, please contact ESGold Corp. at +1-888-370-1059 or visit esgold.com for additional resources, including a French version of this press release, past news releases, a 3D model of the Montauban processing plant, media interviews, and opinion-editorial pieces.

Stay connected by following us on X (formerly Twitter), LinkedIn, and joining our Telegram channel.

For further information or to connect directly, please reach out to Gordon Robb, CEO of ESGold Corp. at [email protected] or call 250-217-2321.

On behalf of the Board of Directors
ESGold Corp.
"Paul Mastantuono"
Chairman & COO
[email protected]
+1-888-370-1059

Cautionary Note Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities laws, including statements regarding future production, cash flow, exploration results, project economics, and permitting. Forward-looking information is based on reasonable assumptions that management believes are current but involve known and unknown risks and uncertainties that may cause actual results to differ materially. These risks are detailed in the Company's public filings on SEDAR+. Readers are cautioned not to place undue reliance on such statements. ESGold disclaims any obligation to update or revise any forward-looking information, except as required by law.

Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

SOURCE: ESGold Corp.



View the original press release on ACCESS Newswire

C.Rojas--TFWP