The Fort Worth Press - Dateline Resources Reveals Significant Colosseum Gold-REE Survey Insights

USD -
AED 3.672499
AFN 66.073567
ALL 82.870557
AMD 381.4977
ANG 1.790055
AOA 916.999821
ARS 1441.4753
AUD 1.505741
AWG 1.80125
AZN 1.733153
BAM 1.678705
BBD 2.013364
BDT 122.282772
BGN 1.67875
BHD 0.376983
BIF 2953.569114
BMD 1
BND 1.294944
BOB 6.907739
BRL 5.342698
BSD 0.999601
BTN 89.876145
BWP 13.280747
BYN 2.873917
BYR 19600
BZD 2.010437
CAD 1.38815
CDF 2229.999833
CHF 0.803965
CLF 0.023435
CLP 919.350363
CNY 7.07165
CNH 7.06997
COP 3805.96
CRC 488.298936
CUC 1
CUP 26.5
CVE 94.627762
CZK 20.788021
DJF 178.006472
DKK 6.413095
DOP 63.979263
DZD 129.960902
EGP 47.561498
ERN 15
ETB 155.051714
EUR 0.858701
FJD 2.26196
FKP 0.748861
GBP 0.749545
GEL 2.707732
GGP 0.748861
GHS 11.370991
GIP 0.748861
GMD 73.000349
GNF 8684.831581
GTQ 7.657084
GYD 209.137648
HKD 7.785415
HNL 26.328145
HRK 6.4661
HTG 130.859652
HUF 327.985502
IDR 16684.25
ILS 3.22337
IMP 0.748861
INR 89.94655
IQD 1309.540669
IRR 42124.999963
ISK 127.770338
JEP 0.748861
JMD 159.999657
JOD 0.708958
JPY 155.330495
KES 129.303563
KGS 87.450404
KHR 4002.334624
KMF 421.999991
KPW 899.993191
KRW 1472.349808
KWD 0.30692
KYD 0.833083
KZT 505.531856
LAK 21676.809119
LBP 89516.767233
LKR 308.334728
LRD 175.938682
LSL 16.941802
LTL 2.95274
LVL 0.60489
LYD 5.434032
MAD 9.231238
MDL 17.00842
MGA 4458.959547
MKD 52.906919
MMK 2099.939583
MNT 3546.502114
MOP 8.016033
MRU 39.863012
MUR 46.070177
MVR 15.409874
MWK 1733.372244
MXN 18.18685
MYR 4.110984
MZN 63.900796
NAD 16.941802
NGN 1450.629832
NIO 36.787647
NOK 10.098385
NPR 143.802277
NZD 1.730535
OMR 0.384493
PAB 0.999682
PEN 3.360156
PGK 4.24115
PHP 58.974994
PKR 280.247111
PLN 3.633165
PYG 6875.152888
QAR 3.643659
RON 4.373102
RSD 100.813002
RUB 77.272376
RWF 1454.419048
SAR 3.753229
SBD 8.223823
SCR 13.511902
SDG 601.503673
SEK 9.407755
SGD 1.29544
SHP 0.750259
SLE 23.000032
SLL 20969.498139
SOS 570.266164
SRD 38.629019
STD 20697.981008
STN 21.02887
SVC 8.745763
SYP 11058.244165
SZL 16.928669
THB 31.8565
TJS 9.171638
TMT 3.5
TND 2.932369
TOP 2.40776
TRY 42.508699
TTD 6.776446
TWD 31.272004
TZS 2434.999856
UAH 41.959408
UGX 3536.283383
UYU 39.096531
UZS 11958.989413
VES 248.585897
VND 26360
VUV 122.070109
WST 2.790151
XAF 563.019389
XAG 0.017073
XAU 0.000236
XCD 2.70255
XCG 1.801608
XDR 0.70002
XOF 562.932418
XPF 102.347136
YER 238.398782
ZAR 16.93566
ZMK 9001.203093
ZMW 23.111058
ZWL 321.999592
  • RBGPF

    0.0000

    78.35

    0%

  • CMSC

    -0.0090

    23.471

    -0.04%

  • NGG

    -0.4590

    75.451

    -0.61%

  • SCS

    -0.0900

    16.14

    -0.56%

  • GSK

    -0.4500

    48.12

    -0.94%

  • RIO

    -0.1800

    73.55

    -0.24%

  • AZN

    0.1050

    90.135

    +0.12%

  • BTI

    -0.9050

    57.135

    -1.58%

  • BP

    -0.9600

    36.27

    -2.65%

  • RYCEF

    0.0500

    14.7

    +0.34%

  • CMSD

    -0.0580

    23.262

    -0.25%

  • RELX

    -0.2200

    40.32

    -0.55%

  • BCC

    -0.8550

    73.405

    -1.16%

  • BCE

    0.2590

    23.479

    +1.1%

  • JRI

    0.0150

    13.765

    +0.11%

  • VOD

    -0.1890

    12.444

    -1.52%

Dateline Resources Reveals Significant Colosseum Gold-REE Survey Insights
Dateline Resources Reveals Significant Colosseum Gold-REE Survey Insights

Dateline Resources Reveals Significant Colosseum Gold-REE Survey Insights

Geophysics Survey Reveals Striking Similarities to World-Class Mountain Pass Rare Earth Deposit;

Geochemical Anomalies Bolster Exploration Potential

Text size:

SAN BERNARDINO, CA / ACCESS Newswire / July 1, 2025 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF) ("Dateline" or "the Company") is thrilled to announce the successful completion of a comprehensive magnetotelluric (MT) geophysical survey at its 100%-owned Colosseum Gold-REE Project, located in East San Bernardino County, California. The survey, finalized on June 29, 2025, with 167 stations surveyed across a 200-meter line spacing and 150-meter station spacing grid, has yielded preliminary data that closely aligns with the geophysical signature of the world-class Mountain Pass rare earth element (REE) deposit, situated just 10 km to the south. Concurrently, the ongoing geochemical sampling program is 75% complete, with initial assay results confirming anomalous REE concentrations, further enhancing the project's exploration prospects.

Key Findings

  • Successful MT Survey Completion: The MT survey concluded on schedule, with data collected using advanced 100m inline and 100m crossline electric field dipoles, paired with horizontal (x,y) magnetic field sensors at every other site and vertical (z) sensors at 25% of sites. Overnight recordings of 14-16 hours per station, supported by a remote reference site 30-40 km away, ensured high-quality data. Rigorous QA/QC checks, including preliminary 1D and 2D inversion models, have validated the dataset's integrity for upcoming 3D modelling.

  • High-Resistivity Anomaly on Line 2200N: Preliminary 2D resistivity sections reveal an anomalous resistivity zone on survey line 2200N, extending from depth to the surface. This anomaly is precisely coincident with mapped REE-bearing fenite dykes and trachyte dykes, suggesting a resistive intrusive body or alteration zone potentially linked to carbonatite systems.

  • Mountain Pass Analogue: The geophysical profile at Colosseum mirrors the Mountain Pass deposit's characteristic trio of anomalies: a relative gravity high, a relative magnetic low, and moderate resistivity (70-120 Ω·m). Reprocessed 2023 and 2024 gravity survey data, combined with regional magnetic data, show a gravity high and magnetic low in the fenite-bearing zone, reinforcing the Mountain Pass-like signature indicative of carbonatite-hosted REE mineralization.

  • Geochemical Sampling Progress: As of June 30, 2025, 916 of approximately 1,200 soil and rock samples have been collected on a 60-meter spaced grid across the claim block, representing 75% completion. Initial assays from the first batch, processed by ALS Global Laboratories in Reno, Nevada, using aqua regia super trace ICP-MS analysis, have detected anomalous REE values, including cerium, lanthanum, and yttrium, above background levels. The program is on track for completion by mid-July, with full results expected later that month.

Detailed Survey Insights

The preliminary 2D resistivity section for line 2200N highlights a near-surface high-resistivity anomaly directly overlying fenite and trachyte dykes, which are exposed in the Colosseum pit walls and mapped north and east of the breccia pipes. This spatial correlation suggests a deep-seated resistive body, potentially a carbonatite intrusion, associated with REE mineralization. Across other survey lines, distinct resistivity contrasts indicate clay-rich alteration zones (low resistivity), possibly linked to gold-bearing breccia pipes, and higher-resistivity zones that may reflect unaltered intrusive or silicified areas. These findings align with Dateline's goal of imaging deep structures and alteration zones, with all preliminary sections under review by the technical team.

Mountain Pass Geophysical Benchmark

The Mountain Pass deposit, operated by MP Materials, provides a proven geophysical template for Colosseum. According to USGS studies (Peacock et al., 2021), Mountain Pass's carbonatite orebody exhibits a dense, non-magnetic core surrounded by moderately resistive host rocks. At Colosseum, the fenite-bearing zone on line 2200N corresponds with a gravity high from the 2024 survey, a magnetic low from regional datasets, and the observed intermediate resistivity. This trifecta of anomalies, consistent with carbonatite REE systems, positions Colosseum as a high-potential exploration target. The Company is integrating these findings with historical data to refine the exploration model.

Geochemical Sampling Update

The geochemical program, initiated in mid-June 2025, involves systematic sampling across the entire claim block, with crews collecting 0.5 kg of material per sample using GPS-guided 60-meter spacing. Samples are dried, crushed, split, and pulverized at ALS Global, with assays targeting gold, silver, REEs, and pathfinder elements. The initial results, showing REE anomalies, are a critical early indicator of mineralization. Once all 1,200 samples are assayed, Dateline will generate geochemical anomaly maps to identify multi-element clusters, integrating these with geophysical data to prioritize drill targets.

Next Steps

Dateline is transitioning to the data integration and target definition phase, with the following planned activities:

  • 3D MT Inversion Modelling: A full 3D resistivity model will be developed using dual inversion approaches. A Colorado-based multi-physics team will employ a proprietary 3D inversion code, while a Perth, Australia, team will use the ModEM MT inversion software. This dual approach, expected to be completed in a few weeks, will cross-validate results and enhance subsurface imaging.

  • Geochemical Completion: The remaining 284 samples will be collected and assayed by mid-July, with comprehensive interpretation to follow. Anomaly maps for cerium, lanthanum, yttrium, and other REEs will guide target delineation.

Integrated Targeting and Drill Program: The 3D MT model, complete geochemical dataset, and reprocessed gravity/magnetic data will be layered to identify coincident anomalies. High-priority targets exhibiting the Mountain Pass-like signature (gravity high, magnetic low, intermediate resistivity) will be slated for drilling. The planned campaign will test both REE potential in the carbonatite target and remaining gold resources in the breccia pipes, with updates to follow upon target finalization.

About Dateline Resources Limited

Dateline Resources Limited (ASX: DTR, OTCQB: DTREF) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.
The Colosseum is located less than 10km north of the Mountain Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to quality as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Contact Information


Stephen Baghdadi

Managing Director

Dateline Resources Limited

+61 2 9375 2353

[email protected]
www.datelineresources.com.au

Andrew Rowell

White Noise Communications

+61 400 466 226

[email protected]
Follow Dateline on X: @Dateline_DTR

Dateline Resources Limited

Level 29, 2 Chifley Square, Sydney,
NSW 2000, Australia

This press release is authorized for release by the Board of Dateline Resources Limited.

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

P.McDonald--TFWP