The Fort Worth Press - Dateline Resources Reports Strong Progress in Colosseum Gold-REE Exploration Program in California

USD -
AED 3.672504
AFN 65.503991
ALL 83.072963
AMD 376.980403
ANG 1.790083
AOA 917.000367
ARS 1386.420402
AUD 1.448436
AWG 1.80025
AZN 1.70397
BAM 1.695072
BBD 2.009612
BDT 122.428639
BGN 1.709309
BHD 0.378163
BIF 2970
BMD 1
BND 1.2851
BOB 6.894519
BRL 5.160604
BSD 0.997742
BTN 92.939509
BWP 13.688562
BYN 2.956504
BYR 19600
BZD 2.006665
CAD 1.39475
CDF 2305.000362
CHF 0.799879
CLF 0.023281
CLP 919.250396
CNY 6.88265
CNH 6.886225
COP 3668.42
CRC 464.279833
CUC 1
CUP 26.5
CVE 96.000359
CZK 21.288304
DJF 177.720393
DKK 6.487804
DOP 60.850393
DZD 133.256954
EGP 54.334939
ERN 15
ETB 155.800822
EUR 0.86804
FJD 2.253804
FKP 0.757614
GBP 0.757461
GEL 2.68504
GGP 0.757614
GHS 11.00504
GIP 0.757614
GMD 74.000355
GNF 8780.000355
GTQ 7.632939
GYD 208.828972
HKD 7.83775
HNL 26.504427
HRK 6.539104
HTG 130.952897
HUF 333.930388
IDR 16994.6
ILS 3.130375
IMP 0.757614
INR 92.73995
IQD 1307.141959
IRR 1319175.000352
ISK 125.380386
JEP 0.757614
JMD 157.303566
JOD 0.70904
JPY 159.65404
KES 129.803801
KGS 87.450384
KHR 3990.137323
KMF 427.00035
KPW 899.985922
KRW 1511.260383
KWD 0.30934
KYD 0.831502
KZT 472.805432
LAK 21970.392969
LBP 89502.03926
LKR 314.804623
LRD 183.088277
LSL 16.955078
LTL 2.95274
LVL 0.60489
LYD 6.380628
MAD 9.374033
MDL 17.55613
MGA 4171.343141
MKD 53.495639
MMK 2099.969769
MNT 3573.217716
MOP 8.055104
MRU 39.637211
MUR 46.950378
MVR 15.460378
MWK 1730.071718
MXN 17.891704
MYR 4.031039
MZN 63.950377
NAD 16.954711
NGN 1378.130377
NIO 36.712196
NOK 9.77265
NPR 148.701282
NZD 1.756852
OMR 0.385097
PAB 0.997734
PEN 3.45194
PGK 4.316042
PHP 60.409504
PKR 278.39991
PLN 3.71375
PYG 6454.29687
QAR 3.638018
RON 4.416604
RSD 101.901662
RUB 80.325739
RWF 1457.240049
SAR 3.754308
SBD 8.038772
SCR 14.424038
SDG 601.000339
SEK 9.483504
SGD 1.286704
SHP 0.750259
SLE 24.650371
SLL 20969.510825
SOS 570.192924
SRD 37.351038
STD 20697.981008
STN 21.233539
SVC 8.730169
SYP 110.556627
SZL 16.948198
THB 32.635038
TJS 9.563492
TMT 3.51
TND 2.941459
TOP 2.40776
TRY 44.520504
TTD 6.768937
TWD 31.995038
TZS 2600.000335
UAH 43.698134
UGX 3743.234401
UYU 40.405091
UZS 12122.393971
VES 473.390504
VND 26340
VUV 119.346905
WST 2.766243
XAF 568.506489
XAG 0.013693
XAU 0.000214
XCD 2.70255
XCG 1.798209
XDR 0.708068
XOF 568.516344
XPF 103.361457
YER 238.650363
ZAR 16.972865
ZMK 9001.203584
ZMW 19.281421
ZWL 321.999592
  • RBGPF

    -13.5000

    69

    -19.57%

  • AZN

    2.7600

    203.49

    +1.36%

  • BTI

    0.3900

    58.28

    +0.67%

  • GSK

    0.7000

    56.69

    +1.23%

  • NGG

    1.1500

    87.99

    +1.31%

  • CMSC

    0.0500

    22.04

    +0.23%

  • RYCEF

    0.9000

    15.99

    +5.63%

  • RIO

    -0.3600

    94.45

    -0.38%

  • BCC

    -1.8800

    73.2

    -2.57%

  • CMSD

    0.1100

    22.26

    +0.49%

  • JRI

    0.0900

    12.61

    +0.71%

  • BP

    0.9500

    47.12

    +2.02%

  • VOD

    0.0800

    15.21

    +0.53%

  • BCE

    -0.9300

    24.45

    -3.8%

  • RELX

    0.3600

    33.59

    +1.07%

Dateline Resources Reports Strong Progress in Colosseum Gold-REE Exploration Program in California
Dateline Resources Reports Strong Progress in Colosseum Gold-REE Exploration Program in California

Dateline Resources Reports Strong Progress in Colosseum Gold-REE Exploration Program in California

SAN BERNARDINO, CA / ACCESS Newswire / June 23, 2025 / Dateline Resources Limited (ASX:DTR)(OTCQB:DTREF), an Australian-based exploration company, is pleased to provide an update on its ongoing exploration program at the 100%-owned Colosseum Gold and Rare Earth Elements (REE) Project, located in the prolific Walker Lane Trend of San Bernardino County, California. This comprehensive program highlights Dateline's commitment to advancing the exploration of this dual-commodity asset through detailed geophysical and geochemical surveys.

Text size:

The magneto telluric (MT) geophysical survey is progressing steadily, with data collected from 119 of the planned 167 stations, representing approximately 70% completion. Designed to capture deep subsurface resistivity data along multiple lines spanning the project claims, the MT survey aims to image geological structures and alteration zones that could indicate buried breccia pipes or REE-bearing mineralized features. Preliminary 1D and 2D resistivity inversions from the first three completed survey lines have been generated and are under review by Dateline's technical team, showing resistivity contrasts that may correlate with key lithological contacts or structural features at depth. A full 3D inversion of the MT dataset will be conducted once all field data is collected, with results expected within 2-4 weeks of survey completion, enhancing the company's ability to pinpoint high-priority drill targets.

In parallel, the geochemical sampling program is advancing, with 599 of the planned 1,207 samples, roughly 50%, collected as of today. Targeting high-priority areas such as newly identified felsite dykes west of historic pits and untested gravity-low anomalies to the east, these samples are being sent to the laboratory in batches for multi-element analysis, including a full suite of rare earth elements, to identify geochemical anomalies and pathfinder elements. Initial assay results from the first batch are expected in early July 2025, with comprehensive interpretation to follow once all samples are analyzed. Given current progress, terrain, and temperature conditions, the sampling campaign is anticipated to conclude in approximately 17-20 days.

These exploration efforts are central to Dateline's "stacked evidence" methodology, which integrates MT, geochemical, gravity, and potentially ground magnetic data to refine drill targets. The results will guide upcoming drilling campaigns, including a maiden REE-focused program, positioning Colosseum as a strategically significant project for both gold and critical minerals.

Located less than 10 kilometers north of the world-class Mountain Pass REE mine, the Colosseum Project is well-positioned to capitalize on the growing global demand for rare earth elements, supported by strong U.S. government initiatives to bolster domestic production. This positions the project to contribute to America's strategic mineral supply chain, enhancing national security by reducing reliance on foreign sources of critical minerals.

Managing Director Stephen Baghdadi commented, "We are very encouraged by the field progress and initial data coming from Colosseum. In just a short period, our team has covered roughly half of the geochemical survey grid, and the MT survey is advancing on schedule. Each batch of samples sent to the lab and each line of geophysical data brings us a step closer to uncovering the next phase of Colosseum's potential. We look forward to receiving the assay results in July along with the MT survey's 3D models. Combining these new datasets will allow us to pinpoint the most prospective zones for both gold and rare earths with a high degree of confidence. This systematic approach is laying the groundwork for our upcoming drilling campaigns, including the maiden REE-focused drill program, to unlock value from this unique gold-REE project."

About Dateline Resources Limited

Dateline Resources Limited (ASX: DTR, OTCQB: DTREF) is an Australian company focused on mining and exploration in North America. The Company owns 100% of the Colosseum Gold-REE Project in California.

The Colosseum Gold Mine is located in the Walker Lane Trend in East San Bernardino County, California. On 6 June 2024, the Company announced to the ASX that the Colosseum Gold mine has a JORC-2012 compliant Mineral Resource estimate of 27.1Mt @ 1.26g/t Au for 1.1Moz. Of the total Mineral Resource, 455koz @ 1.47/t Au (41%) are classified as Measured, 281koz @1.21g/t Au (26%) as Indicated and 364koz @ 1.10g/t Au (33%) as Inferred.

On 23 May 2025, Dateline announced that updated economics for the Colosseum Gold Project generated an NPV6.5 of US$550 million and an IRR of 61% using a gold price of US$2,900/oz.

The Colosseum is located less than 10km north of the Mountain Rare Earth mine. Planning has commenced on drill testing the REE potential at Colosseum.

Forward-Looking Statements

This announcement may contain "forward-looking statements" concerning Dateline Resources that are subject to risks and uncertainties. Generally, the words "will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond Dateline Resources' ability to control or estimate precisely, such as future market conditions, changes in regulatory environment and the behavior of other market participants. Dateline Resources cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements. Dateline Resources assumes no obligation and does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

Competent Person Statement

Sample preparation and any exploration information in this announcement is based upon work reviewed by Mr Greg Hall who is a Chartered Professional of the Australasian Institute of Mining and Metallurgy (CP-IMM). Mr Hall has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to quality as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr Hall is a Non-Executive Director of Dateline Resources Limited and consents to the inclusion in the report of the matters based on this information in the form and context in which it appears.

Contact Information
Stephen Baghdadi
Managing Director
Dateline Resources Limited
+61 2 9375 2353
[email protected]
www.datelineresources.com.au

Andrew Rowell
White Noise Communications
+61 400 466 226
[email protected]

Follow Dateline on X: @Dateline_DTR

Dateline Resources Limited
Level 29, 2 Chifley Square, Sydney, NSW 2000, Australia

This press release is authorized for release by the Board of Dateline Resources Limited

SOURCE: Dateline Resources Limited



View the original press release on ACCESS Newswire

T.Harrison--TFWP