The Fort Worth Press - Mawson Finland Limited Announces Significant Progress in Permitting Process for the Rajapalot Gold-Cobalt Project, Finland

USD -
AED 3.672501
AFN 64.999926
ALL 83.124975
AMD 376.619516
ANG 1.790083
AOA 917.000397
ARS 1393.262098
AUD 1.445212
AWG 1.8
AZN 1.697576
BAM 1.695072
BBD 2.009612
BDT 122.428639
BGN 1.709309
BHD 0.377584
BIF 2971
BMD 1
BND 1.2851
BOB 6.894519
BRL 5.1409
BSD 0.997742
BTN 92.939509
BWP 13.688562
BYN 2.956504
BYR 19600
BZD 2.006665
CAD 1.39183
CDF 2300.000147
CHF 0.798945
CLF 0.023208
CLP 916.397863
CNY 6.882603
CNH 6.87722
COP 3683.02
CRC 464.279833
CUC 1
CUP 26.5
CVE 95.87505
CZK 21.259202
DJF 177.720296
DKK 6.477425
DOP 60.625009
DZD 133.033145
EGP 54.462702
ERN 15
ETB 156.702191
EUR 0.86681
FJD 2.238199
FKP 0.75717
GBP 0.755795
GEL 2.680046
GGP 0.75717
GHS 11.009793
GIP 0.75717
GMD 73.503383
GNF 8777.49797
GTQ 7.632939
GYD 208.828972
HKD 7.83718
HNL 26.61009
HRK 6.532702
HTG 130.952897
HUF 330.730972
IDR 17083
ILS 3.15063
IMP 0.75717
INR 92.977502
IQD 1310
IRR 1315799.999706
ISK 125.170136
JEP 0.75717
JMD 157.303566
JOD 0.709003
JPY 159.760503
KES 130.000286
KGS 87.449923
KHR 4012.49797
KMF 426.999701
KPW 899.999766
KRW 1503.464983
KWD 0.30975
KYD 0.831502
KZT 472.805432
LAK 21959.999986
LBP 89540.13367
LKR 314.804623
LRD 184.250026
LSL 16.864994
LTL 2.95274
LVL 0.60489
LYD 6.374976
MAD 9.377498
MDL 17.55613
MGA 4161.000254
MKD 53.431509
MMK 2099.768269
MNT 3572.241801
MOP 8.055104
MRU 40.11993
MUR 47.019821
MVR 15.449851
MWK 1736.500541
MXN 17.7763
MYR 4.038004
MZN 63.960159
NAD 16.870625
NGN 1379.072598
NIO 36.730244
NOK 9.699802
NPR 148.701282
NZD 1.75268
OMR 0.384495
PAB 0.997734
PEN 3.42625
PGK 4.307019
PHP 60.264499
PKR 279.050327
PLN 3.701745
PYG 6454.29687
QAR 3.645097
RON 4.418502
RSD 101.715985
RUB 78.742535
RWF 1461
SAR 3.7539
SBD 8.04524
SCR 14.90274
SDG 601.000245
SEK 9.4697
SGD 1.285325
SHP 0.750259
SLE 24.598164
SLL 20969.510825
SOS 571.507249
SRD 37.351001
STD 20697.981008
STN 21.55
SVC 8.730169
SYP 110.564494
SZL 16.860372
THB 32.620501
TJS 9.563492
TMT 3.5
TND 2.918989
TOP 2.40776
TRY 44.6077
TTD 6.768937
TWD 31.935991
TZS 2599.999763
UAH 43.698134
UGX 3743.234401
UYU 40.405091
UZS 12174.999852
VES 473.467204
VND 26341.5
VUV 119.305544
WST 2.766278
XAF 568.506489
XAG 0.013819
XAU 0.000215
XCD 2.702551
XCG 1.798209
XDR 0.706253
XOF 568.491204
XPF 103.650022
YER 238.600967
ZAR 16.89065
ZMK 9001.203539
ZMW 19.281421
ZWL 321.999592
  • CMSC

    0.1400

    22.18

    +0.63%

  • RIO

    -0.4400

    94.01

    -0.47%

  • CMSD

    0.0900

    22.35

    +0.4%

  • BCE

    -0.1900

    24.26

    -0.78%

  • RBGPF

    -13.5000

    69

    -19.57%

  • BTI

    0.4300

    58.71

    +0.73%

  • BCC

    0.5500

    73.75

    +0.75%

  • JRI

    0.1200

    12.73

    +0.94%

  • NGG

    -0.9300

    87.06

    -1.07%

  • BP

    0.3600

    47.48

    +0.76%

  • AZN

    -0.6600

    202.83

    -0.33%

  • GSK

    -0.3200

    56.37

    -0.57%

  • RYCEF

    -0.2400

    15.75

    -1.52%

  • RELX

    0.0200

    33.61

    +0.06%

  • VOD

    -0.0700

    15.14

    -0.46%

Mawson Finland Limited Announces Significant Progress in Permitting Process for the Rajapalot Gold-Cobalt Project, Finland
Mawson Finland Limited Announces Significant Progress in Permitting Process for the Rajapalot Gold-Cobalt Project, Finland

Mawson Finland Limited Announces Significant Progress in Permitting Process for the Rajapalot Gold-Cobalt Project, Finland

VANCOUVER, BC / ACCESS Newswire / May 13, 2025 / Mawson Finland Limited ("Mawson" or the "Company") (TSXV:MFL) is pleased to announce an important milestone in the permitting process that relates to the development of its 100%-owned Rajapalot gold-cobalt project in the Lapland region of Finland. The Company has initiated the "second phase" of the EIA (Environmental Impact Assessment) procedure and chosen the consultant Ramboll Finland Oy ("Ramboll") responsible for the preparation work. This is a critical step for the development of the project and will foster further collaboration with both the authorities and stakeholders in the region.

Text size:

Ms. Noora Ahola, Mawson Finland CEO, states: "We are very happy to announce that we have advanced in our Environmental Impact Assessment procedure, and have now selected a suitable consultant after a rigorous selection process. Ramboll is a highly respected and very experienced international consultancy office with a wide global network of experts, including experience in developing EIAs and related studies with Finnish mining operators. We are all very pleased to start working together and further develop the Rajapalot asset on its path to production. We would like to thank our shareholders, local stakeholders and communities for all the support and encouragement to continue developing and de-risking the Rajapalot project."

Highlights:

  • Significant milestone of the mine development journey by initiating the "second and final phase" of the EIA procedure

    • De-risking the project and future mine permitting

    • Further strengthening the stakeholder engagement and communication within the local communities

  • Responsible consultant selected for preparing the EIA Report ("second phase of the EIA procedure); Ramboll

    • Part of international Ramboll Group A/S

    • Widely experienced global network of experts

    • Dedicated team of Finnish experts

    • Recent clients from the Nordic mining industry includes for example Agnico Eagle (Kittilä Gold Mine), Finnish Minerals Group (Terrafame Mine), Yara Suomi (Siilinjärvi Mine), Boliden (Kylylahti Mine) and Anglo American (Sakatti Mine project)

  • Strong local support for the progress and development of the project

EIA - Environmental Impact Assessment Procedure

In Finland and the European Union, regulatory environmental planning processes form the foundation for a structured permitting path required for sustainable mine development. The EIA procedure lays the groundwork for moving the Rajapalot project through all future mine permitting requirements (i.e., industrial zoning, extraction and operational permits etc). Throughout this procedure the Rajapalot project and future mine permitting can be further de-risked while the company continues the on-going resource expansion work.

This EIA procedure ensures not only the project's environmental responsibility but also facilitates meaningful stakeholder engagement in the development process. The EIA procedure includes two major phases: the Program phase (ie., "first phase") and the Report phase (ie., "second phase"). The "first phase", or the EIA Program, was finalized in late 2024 (see MFL news release dated December 10, 2024). This "second phase" or the EIA Report, will document and address any significant environmental impacts from mine development and continued operations. As such, Mawson has now achieved a significant milestone in this development journey by initiating the final "second phase" of the EIA procedure.

It is important to note that while this EIA procedure is not a permit, it provides the vital and underlying foundations on which any further mine permitting processes will require. It provides both the environmental baselines of the area, and any possible effects of the project which will be continuously referred to by the governing authorities during subsequent mine permitting. The EIA Report can be finalized after the Pre-Feasibility has been completed.

This same EIA procedure has been or is being presently undertaken by all the other mineral development projects in Finland, including the Ikkari project of Rupert Resources, Suhanko ("Arctic Platinum") project of CD Capital Natural Resources Fund III L.P., the Sokli project of The Finnish Minerals Group, and the Sakatti project of Anglo American.

Ramboll

Ramboll is a global engineering, architecture, and consultancy company with over 18,000 experts worldwide and 2,500 in Finland. In the mining sector, Ramboll combines international expertise with local insight to deliver responsible, technically sound solutions across the full mine life cycle. Core services include ESIAs, permitting, closure planning, and stakeholder engagement, all aligned with IFC, EBRD, and Equator Principles to ensure compliance and financing readiness. Ramboll's recent assignments include for example acting as GISTM Designer of Record for Boliden Kylylahti mine and leading the EIA for Yara Suomi's Siilinjärvi mine expansion. Ramboll has also delivered zoning and impact assessments for Anglo American Sakatti Mining, an IFC-compliant ESIA for Sydvaranger AS in Norway, and environmental permitting and risk assessments for Terrafame mine. Ramboll have provided land-use and permitting services also for Agnico Eagle's Kittilä gold Mine.

About Mawson Finland Limited

Mawson Finland Limited is an exploration stage mining development company engaged in the acquisition and exploration of precious and base metal properties in Finland. The Company is primarily focused on gold and cobalt. The Corporation currently holds a 100% interest in the Rajapalot Gold-Cobalt Project located in Finland. The Rajapalot Project represents approximately 5% of the 100-square kilometre Rompas-Rajapalot Property, which is wholly owned by Mawson and consists of 12 granted exploration permits and one extension permit application for a total of 11,262 hectares. In Finland, all operations are carried out through the Company's fully owned subsidiary, Mawson Oy. Mawson maintains an active local presence of Finnish staff with close ties to the communities of Rajapalot.

Additional disclosure including the Company's financial statements, technical reports, news releases and other information can be obtained at mawsonfinland.com or on SEDAR+ at www.sedarplus.ca.

Media and Investor Relations Inquiries

Please contact: Neil MacRae Executive Chairman at [email protected] or +1 (778) 999-4653, or Noora Ahola Chief Executive Officer at [email protected] or +358 (505) 213-515.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No securities regulatory authority has reviewed or approved of the contents of this news release.

Forward-looking Information

This news release includes certain "forward-looking information" and "forward-looking statements" within the meaning of applicable securities laws (collectively, "forward-looking information") which are not comprised of historical facts. Forward-looking information includes, without limitation, estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking information may be identified by such terms as "believes", "anticipates", "expects", "estimates", "aims", "may", "could", "would", "will", "must" or "plan". Since forward-looking information is based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, and management of the Company believes them to be reasonable based upon, among other information, the contents of the PEA and the exploration information disclosed in this news release, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, any expected receipt of additional assay results or other exploration results and the impact upon the Company thereof, any expected milestone independent data verification, the continuance of the Company's quality assurance and quality control program, potential mineralization whether peripheral to the existing Rajapalot resource or elsewhere, any anticipated disclosure of assay or other exploration results and the timing thereof, the estimation of mineral resources, exploration and mine development plans, including drilling, soil sampling, geophysical and geochemical work, any expected search for additional exploration targets and any results of such searches, potential acquisition by the Company of any property, the growth potential of the Rajapalot resource, all values, estimates and expectations drawn from or based upon the PEA, and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: any change in industry or wider economic conditions which could cause the Company to adjust or cancel entirely its exploration plans, failure to identify mineral resources or any additional exploration targets, failure to convert estimated mineral resources to reserves, any failure to receive the results of completed assays or other exploration work, poor exploration results, the inability to complete a feasibility study which recommends a production decision, the preliminary and uncertain nature of the PEA, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR+. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

SOURCE: Mawson Finland Limited



View the original press release on ACCESS Newswire

L.Rodriguez--TFWP