The Fort Worth Press - Mawson Finland Limited Reports Exploration Update: Completion of 2025 Winter Drilling Campaign, and On-Going Base-of-Till Programme

USD -
AED 3.672503
AFN 65.00016
ALL 80.969857
AMD 361.359581
ANG 1.789785
AOA 916.999814
ARS 1522.999097
AUD 1.432531
AWG 1.80125
AZN 1.733153
BAM 1.74212
BBD 2.012426
BDT 123.598208
BGN 1.747831
BHD 0.377416
BIF 2999.585803
BMD 1
BND 1.278237
BOB 11.675159
BRL 5.061797
BSD 0.999132
BTN 94.798398
BWP 13.69985
BYN 2.981094
BYR 19600
BZD 2.009486
CAD 1.409504
CDF 2313.496653
CHF 0.825905
CLF 0.024945
CLP 981.88969
CNY 6.691199
CNH 6.68261
COP 3168
CRC 453.826798
CUC 1
CUP 23.980333
CVE 98.217189
CZK 21.69495
DJF 177.929603
DKK 6.66426
DOP 61.451444
DZD 134.429503
EGP 53.909098
ERN 15
ETB 163.206182
EUR 0.89157
FJD 2.25945
FKP 0.750648
GBP 0.750975
GEL 2.590027
GGP 0.750648
GHS 11.676049
GIP 0.750648
GMD 73.497352
GNF 8844.094881
GTQ 7.639034
GYD 209.00734
HKD 7.84817
HNL 26.820882
HRK 6.717696
HTG 130.705681
HUF 323.815498
IDR 18054
ILS 3.103505
IMP 0.750648
INR 94.83895
IQD 1514.774979
IRR 1795877.49876
ISK 121.440179
JEP 0.750648
JMD 158.78431
JOD 0.708969
JPY 158.407498
KES 129.897411
KGS 87.449855
KHR 4068.089503
KMF 439.999991
KPW 899.999961
KRW 1331.68034
KWD 0.31091
KYD 0.83268
KZT 451.722955
LAK 22482.018394
LBP 89478.016105
LKR 331.122819
LRD 170.366279
LSL 16.42449
LTL 2.95274
LVL 0.60489
LYD 6.412478
MAD 9.77184
MDL 17.816041
MGA 4529.360679
MKD 54.914955
MMK 2099.513869
MNT 3596.411813
MOP 8.077478
MRU 40.003029
MUR 47.249868
MVR 15.460413
MWK 1732.62013
MXN 18.443225
MYR 4.082499
MZN 63.893505
NAD 16.424417
NGN 1332.740352
NIO 36.770142
NOK 9.415735
NPR 151.676406
NZD 1.764865
OMR 0.384503
PAB 0.999132
PEN 3.447023
PGK 4.544503
PHP 62.995498
PKR 276.59385
PLN 3.89775
PYG 5763.047022
QAR 3.642032
RON 4.747896
RSD 104.717958
RUB 82.75182
RWF 1476.78686
SAR 3.763551
SBD 8.064647
SCR 13.998288
SDG 601.461434
SEK 9.908202
SGD 1.279815
SHP 0.754745
SLE 24.68032
SLL 20969.504398
SOS 571.064633
SRD 37.708892
STD 20697.981008
STN 21.822878
SVC 8.742551
SYP 13001.999685
SZL 16.419114
THB 33.560497
TJS 9.202594
TMT 3.51
TND 2.982711
TOP 2.40776
TRY 49.552698
TTD 6.778453
TWD 32.478498
TZS 2649.949648
UAH 45.052265
UGX 4156.255985
UYU 40.119539
UZS 12034.649387
VES 878.9106
VND 25894.5
VUV 118.97233
WST 2.787823
XAF 584.831548
XAG 0.017496
XAU 0.000241136137
XCD 2.70255
XCG 1.80082
XDR 0.707052
XOF 584.831548
XPF 106.228901
YER 236.14965
ZAR 16.43767
ZMK 9001.203608
ZMW 19.959203
ZWL 321.999592
SSP 5750.775019
MXV 2.082052
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Mawson Finland Limited Reports Exploration Update: Completion of 2025 Winter Drilling Campaign, and On-Going Base-of-Till Programme
Mawson Finland Limited Reports Exploration Update: Completion of 2025 Winter Drilling Campaign, and On-Going Base-of-Till Programme

Mawson Finland Limited Reports Exploration Update: Completion of 2025 Winter Drilling Campaign, and On-Going Base-of-Till Programme

VANCOUVER, BC / ACCESS Newswire / April 24, 2025 / Mawson Finland Limited ("Mawson" or the "Company") (TSXV:MFL) is pleased to announce completion of the 2025 winter drilling campaign drilling a total of 11,397 metres from 33 drillholes at the Company's wholly-owned Rajapalot gold-cobalt project in Finland, reporting visible intercepts of Rajapalot-style mineralization from Raja Deeps drilling, and updates BOT (base-of-till) geochemical programme (see Table 1, Figure 1 and Figure 2 in Schedule "A" hereto).

Text size:

Highlights:

  • Winter drilling 2025 campaign completed with a total of 11,397 metres from 33 drillholes

  • Confirmation of 'off-hole' DHEM conductor at Raja Deeps with 11.3 metres of disseminated to semi-massive Fe-sulfides drilled from 666.4 metres in PAL0388, with visible gold observed at 668.5 metres downhole (See Figure 3; assays not yet received), hosted in strongly chlorite-altered rocks

  • Three wedge or 'navi' holes collared from below surface off PAL0388 in Raja Deeps drilled as follow-ups to visual confirmation of sulfide mineralisation in PAL0388 (PAL0388a, PAL0388b and PAL0388c), with:

    • PAL0388a drilling 2.75 metres of disseminated to semi-massive Fe-sulfides from 689.95 metres (hosted in Mg/Fe-amphibole-altered rocks)

    • PAL0388b drilling 0.8 metres of disseminated to semi-massive sulfides from 688 metres (hosted in Mg/Fe-amphibole-altered rocks)

    • PAL0388c drilling 9.9 metres of disseminated to semi-massive sulfides from 676.4 metres (hosted in muscovite-altered rocks)

  • Base-of-till (BOT) drilling progressing well with over 600 samples taken, with some gold-anomalous samples identified within first 270 samples received back from analysis

Ms. Noora Ahola, Mawson Finland CEO, states: "We are very pleased to report the completion of our 2025 winter drilling programme at Rajapalot with over 11,000 metres of drilling completed in what was an unexpectedly very short winter. Additionally, we present some exciting primary observations from some of this drilling, whereby we have confirmation by drilling of a significantly conductive rock-package located at Raja Deeps which represents a potentially significant step forward in this area of the project, re-opening the door for larger discovery at Raja. This could potentially enlarge the mineralised footprint of the Raja zone. Base-of-till drilling has progressed will with already over 600 samples drilled from the Rajapalot area, with some promising results identifying compelling drill-targets. We look forward to reporting assays of our drill results to market as we receive them over the coming weeks."

Detailed Results

Winter Drilling

Four diamond drilling rigs drilled a total of 33 diamond drillholes at Rajapalot this winter for a total of 11,397 metres drilling. The programme stopped short of the planned 12,000+ drilling metres due to the unusually short winter season at Rajapalot, where the earlier than usual spring thaw meant drill-rigs had to be demobilised earlier than expected due to suboptimal ground-conditions. Of the 33 drillholes drilled, 3 holes were abandoned due to excessive and unexpected deviation leaving 30 drillholes drilled to target/completion. Additionally, a further 5 drillholes were tails/continuations of existing and older drillholes, while 3 drillholes were 'navi' or directional holes collared beneath the surface from an existing deep drillhole. Further analysis for gold and cobalt results will be presented in the coming weeks.

Raja Deeps: Target-test drilling (drillhole PAL0388) of a conductive anomaly defined through DHEM geophysics, located in the down-plunge/down-dip position of the Raja projected mineralised zone (see news release dated February 11, 2025) has intercepted a 11.3 metres interval of disseminated to semi-massive iron-sulfide (pyrrhotite and pyrite with chlorite alteration; typical gangue mineralogy of Rajapalot gold-cobalt mineralisation), starting from 666.4 metres downhole; see Figure 2 and Figure 3. Visible gold was observed in drill-core at 668.5 metres (see Figure 3) suggesting this intercept in PAL0388 is indeed gold-bearing. It is important to note that analysis for gold has not yet been undertakenon this drillhole, and gold grades are unknown at present time. Three additional 'navi' wedge holes were drilled off PAL0388 in order to follow up this intercept (collared between 420 and 462 metres downhole), where PAL0388a returned a visual intercept of a 2.75 metre interval of disseminated to semi-massive sulfide from 690 metres (step-out ~30 metres to the north of PAL0388), and PAL0388b returned a visual intercept of a thinner 0.8 from 688 metres (step-out of ~22 metres to the south of PAL0388). PAL0388c intercepted a thicker visual intercept of 9.9 metres 676.4 metres downhole in a ~47 metre step-out to the south of PAL0388. Drillhole PAL0388 is located approximately 135 metres down-plunge of the nearest drillhole from the Raja zone (historical drillhole PAL0230), while PAL0388c is located approximately 180 metres from PAL0230 in Raja zone, representing that these are potentially significant step-out intercepts. Assay data for these drillholes will become available over the coming several weeks.

Base-of-Till Drilling (BOT)

A 'base-of-till' or 'BOT' drilling rig has also been operating at Rajapalot since early January, and has so far drilled and collected 620 samples from shallow holes, typically around 5 - 15 metres depth. The drill-string penetrates the glacially-derived regolith overburden, where a sample is then collected from the from the bedrock-regolith interface; this basal portion of the regolith succession is considered to have been transported the least furthest, typically less than 50 metres from the bedrock source. To date 620 samples have been collected from the Rajapalot area and broader district (see Figure 4), and 270 of these BOT samples have been analyzed so far, and preliminary gold results are illustrated in Figure 5. To date two areas of anomalous gold concentrations are defined; 'Jussi's Corner' located in the north-eastern areas of Rajapalot (approximately 550 metres north of Joki East inferred resource), and 'Bear Nest' located in the south-west area of Rajapalot (approximately 250 metres west of the Rumajärvi inferred resource). Further BOT drilling is planned over the coming weeks and will be focussed on regional targets located to the east of Rajapalot.

Technical Background, Data Verification and Quality Assurance and Quality Control

Four diamond drill rigs from MK Core Drilling Oy, Comadev Oy and Arctic Drilling Company Oy, all with water recirculation and drill cuttings collection systems, were used in this drill program. Core diameter is NQ2 (50.7 mm). Core recoveries are excellent and average close to 100% in fresh rock. After photographing and logging in Mawson's Rovaniemi facilities, core intervals of between 0.4 to 2 metres are taken, then half-sawn by independent contractors the Geological Survey of Finland (GTK) in Rovaniemi, Palsatech Oy in Kemi and Geopool Oy in Sodankylä. The remaining half core is retained for verification and reference purposes. Analytical samples are transported by commercial transport from site to the independent contractor CRS Minlab Oy ("CRS") facility in Kempele, Finland. Samples were prepared and analyzed for gold using the PAL1000 technique which involves grinding the sample in steel pots with abrasive media in the presence of cyanide, followed by measuring the gold in solution with flame AAS equipment. Samples for multi-element analysis (including cobalt) are pulped at CRS, then transported by air to MSALABS in Vancouver, Canada and analyzed using four acid digest ICP-MS methods. All the foregoing laboratories are independent of the Company. The quality assurance and quality control program of Mawson consists of the systematic insertion of certified standards of known gold content, duplicate samples by quartering the core, and blanks placed within sample runs in interpreted mineralized rock. In addition, CRS inserts blanks and standards into the analytical process. In addition to the sample preparation and security measures described above, data verification procedures are well integrated into the Company's quality assurance and quality control program. Routine ongoing checking of all data is undertaken prior to being uploaded to the database. This will be followed by independent data verification audits at exploration milestones throughout the Rajapalot project's development. Dr. Fromhold (see "Qualified Person" below) has also reviewed the qualifications and analytical procedures of the above-mentioned laboratories, photographs of drill cores, and the PEA in connection with verifying the exploration information presented herein.

All maps have been created within the KKJ3/Finland Uniform Coordinate System (EPSG:2393). Tables 1-3 in Schedule "A" hereto provide collar and assay data. Due to the typically low angles of drill intercepts, the true thickness of the mineralized intervals are interpreted to be approximately 80-90% of the drilled thickness. Table 3 gives detailed individual assay data of all intervals reported in this press release. Intersections are reported with a lower cut of 0.1 g/t Au over sampled intervals, with composite data (Table 2 in Schedule "A" hereto) containing no more than 2 metres of consecutively sampled waste-rock (i.e., 2 metres @

The bottom of till ("BOT") samples are taken with a small, portable percussion drill rig with a 'flow-through' bit, where a sample is collected from the bottom of the drill-string when drilling penetration slows/stops at the till-bedrock interface. The samples are directly bagged, labelled and then transported from site to Mawson facilities in Rovaniemi for geological logging and then submitted to ALS Sodankylä where they were sieved to fine fraction (

Deposit Model

At Rajapalot, mineralization is regarded as orogenic in nature. All examples of gold-cobalt mineralisation are consistently located within highly-sheared and foliated wall-rocks adjacent to strongly hydrothermally altered, northwest to north dipping shear-zones. Mineralisation is typically encountered as disseminated to semi-massive sulfide lenses (predominantly pyrrhotite and lesser pyrite ± cobaltite), hosted within strongly deformed and altered, mafic volcanic and volcaniclasitic stratigraphy of the upper portions of the Paleoproterozoic-aged Kivalo Group of the Peräpohja Greenstone Belt. Prospects with high-grade gold and cobalt mineralisation at Rajapalot occur across a 3 km (east-west) by 2 km (north-south) area within the larger Rajapalot project area measuring 4 km by 4 km with multiple mineralized boulders, base-of-till (BOT). Gold-Cobalt mineralization at Rajapalot has been drilled to approximately 470 metres below surface at both South Palokas and Raja prospects, and mineralisation remains open at depth across the entire project.

Rajapalot Mineral Resource

An Inferred Mineral Resource ("MRE") has been calculated for the Rajaplot project (effective date August 26, 2021), and is based on an 'underground only' mining scenario containing 9.8 million tonnes @ 2.8 g/t gold ("Au") and 441 ppm Co, equating to 867 thousand ounces ("koz") gold and 4,311 tonnes of cobalt.

Zone

Cut-off
(AuEq¹)

Tonnes
(kt)

Au
(g/t)

Co
(ppm)

Au
(koz)

Co
(tonnes)

Palokas

1.1

5,612

2.8

475

501

2,664

Raja

1.1

2,702

3.1

385

271

1,040

East Joki

1.1

299

4.5

363

43

109

Hut

1.1

831

1.3

428

36

355

Rumajärvi

1.1

336

1.4

424

15

142

Total Inferred Resources

9,780

2.8

441

867

4,311

Rajapalot Inferred Mineral Resource Effective August 26, 2021

  • The independent geologist and Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol). The effective date of the MRE remains unchanged to the Previous MRE (August 26, 2021, available on SEDAR as filed by the previous owner, Mawson), and will be restated in the PEA technical report when it is filed.

  • The mineral estimate is reported for a potential underground only scenario. Inferred resources were reported at a cut-off grade of 1.1 g/t (AuEq1 Au g/t + Co ppm /1005) with a depth of 20 metres below the base of solid rock regarded as the near-surface limit of potential mining.

  • Wireframe models were generated using gold and cobalt shells separately. Forty-eight separate gold and cobalt wireframes were constructed in Leapfrog Geo and grade distributions independently estimated using Ordinary Kriging in Leapfrog Edge. A gold top cut of 50 g/t Au was used for the gold domains. A cobalt top cut was not applied.

  • A parent block size of 12 m x 12 m x 4 m (>20% of the drillhole spacing) was determined as suitable. Sub-blocking down to 4 m x 4 m x 0.5 m was used for geologic control on volumes, thinner and moderately dipping wireframes.

  • Rounding of grades and tonnes may introduce apparent errors in averages and contained metals.

  • Drilling results to 20 June 2021.

  • Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

Qualified Person

The technical and scientific information in this news release was reviewed, verified and approved by Dr. Thomas Fromhold, an employee of Fromhold Geoconsult AB, and Member of The Australian Institute of Geosciences (MAIG, Membership No. 8838). Dr. Fromhold is a "qualified person" as defined under NI 43-101. Dr. Fromhold is not considered independent of the Company under NI 43-101 as he is a consultant of the Company.

About Mawson Finland Limited

Mawson Finland Limited is an exploration stage mining development company engaged in the acquisition and exploration of precious and base metal properties in Finland. The Company is primarily focused on gold and cobalt. The Corporation currently holds a 100% interest in the Rajapalot Gold-Cobalt Project located in Finland. The Rajapalot Project represents approximately 5% of the 100-square kilometre Rompas-Rajapalot Property, which is wholly owned by Mawson and consists of 12 granted exploration permits and one extension permit application for a total of 11,262 hectares. In Finland, all operations are carried out through the Company's fully owned subsidiary, Mawson Oy. Mawson maintains an active local presence of Finnish staff with close ties to the communities of Rajapalot.

Additional disclosure including the Company's financial statements, technical reports, news releases and other information can be obtained at mawsonfinland.com or on SEDAR+ at www.sedarplus.ca.

Media and Investor Relations Inquiries

Please contact: Neil MacRae Executive Chairman at [email protected] or +1 (778) 999-4653, or Noora Ahola Chief Executive Officer at [email protected] or +358 (505) 213-515.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No securities regulatory authority has reviewed or approved of the contents of this news release.

Forward-looking Information

This news release includes certain "forward-looking information" and "forward-looking statements" within the meaning of applicable securities laws (collectively, "forward-looking information") which are not comprised of historical facts. Forward-looking information includes, without limitation, estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking information may be identified by such terms as "believes", "anticipates", "expects", "estimates", "aims", "may", "could", "would", "will", "must" or "plan". Since forward-looking information is based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, and management of the Company believes them to be reasonable based upon, among other information, the contents of the PEA and the exploration information disclosed in this news release, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, any expected receipt of additional assay results or other exploration results and the impact upon the Company thereof, any expected milestone independent data verification, the continuance of the Company's quality assurance and quality control program, potential mineralization whether peripheral to the existing Rajapalot resource or elsewhere, any anticipated disclosure of assay or other exploration results and the timing thereof, the estimation of mineral resources, exploration and mine development plans, including drilling, soil sampling, geophysical and geochemical work, any expected search for additional exploration targets and any results of such searches, potential acquisition by the Company of any property, the growth potential of the Rajapalot resource, all values, estimates and expectations drawn from or based upon the PEA, and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: any change in industry or wider economic conditions which could cause the Company to adjust or cancel entirely its exploration plans, failure to identify mineral resources or any additional exploration targets, failure to convert estimated mineral resources to reserves, any failure to receive the results of completed assays or other exploration work, poor exploration results, the inability to complete a feasibility study which recommends a production decision, the preliminary and uncertain nature of the PEA, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR+. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

SCHEDULE "A" - TABLES AND FIGURES

Hole ID

Easting KKJ

Northing KKJ

Elevation (mRL)

Azimuth

Dip

Total Depth (m)

Prospect

PAL0016ext

3408333.32

7373665.92

173.81

113.2

-58.1

329.5 (260.5)

South Palokas

PAL0122ext

3408353.99

7373580.12

175.04

117.2

-60.0

299.2 (209.6)

South Palokas

PAL0180ext

3408127.24

7372705.59

174.00

41.0

-61.4

812 (778.65)

Raja

PAL0195ext

3408354.19

7373579.82

175.05

62.6

-78.0

447.6 (254.6)

South Palokas

PAL0204ext

3408521.78

7373603.97

173.39

234.8

-85.0

287.8 (149.2)

South Palokas

PAL0373

3407806.74

7374005.83

171.99

127.6

-61.2

1004.0

South Palokas

PAL0374

3408899.96

7372383.28

172.44

69.1

-75.2

300.0

Raja

PAL0375

3409137.40

7374399.43

176.69

186.1

-44.8

400.8

Hirvimaa

PAL0376

3408941.23

7372298.28

173.19

148.0

-63.2

167.6

Raja

PAL0377

3408276.44

7374025.77

174.28

84.8

-65.1

551.5

Palokas

PAL0378

3408816.57

7372713.16

174.45

183.1

-61.0

376.4

Raja

PAL0379

3408499.30

7373520.30

174.18

130.1

-50.2

191.2

South Palokas

PAL0380

3408275.85

7374025.30

174.20

101.1

-69.0

568.2

Palokas

PAL0381

3408816.79

7372713.47

174.39

170.0

-67.0

380.0

Raja

PAL0382

3408335.65

7373897.76

173.97

100.1

63.1

484.5

Palokas

PAL0383

3408347.47

7373503.87

173.69

75.2

-73.0

404.0

South Palokas

PAL0384

3408065.71

7373970.95

172.17

126.1

-79.9

809.6

South Palokas

PAL0385

3409025.94

7372287.86

170.06

290.0

-73.0

209.1

Raja

PAL0386

3408275.45

7374025.31

174.13

100.0

-77.3

638.3

Palokas

PAL0387

3408552.29

7372181.02

173.68

154.7

-45.1

73.0

Raja

PAL0388

3408237.23

7372831.33

182.18

50.6

-73.3

743.2

Raja

PAL0388A

3408237.23

7372831.33

182.18

50.6

-75.3

722.5

Raja Deeps

PAL0388B

3408237.23

7372831.33

182.18

50.6

-75.3

703.5

Raja Deeps

PAL0388C

3408237.23

7372831.33

182.18

50.6

-75.3

716.1

Raja Deeps

PAL0389

3408402.41

7373549.59

174.54

137.0

-45.1

217.7

South Palokas

PAL0390

3408086.94

7373644.48

172.81

45.0

-79.5

230.5

Hole Abandoned

PAL0391

3408238.79

7372832.20

181.87

56.0

-73.1

31.4

Hole Abandoned

PAL0392

3408274.84

7374024.71

174.05

114.0

-70.3

589.8

Palokas

PAL0393

3408402.75

7373550.19

174.34

124.9

-53.1

265.7

South Palokas

PAL0394

3408086.84

7373644.42

172.81

45.0

-83.0

84.7

Hole Abandoned

PAL0395

3408086.10

7373643.95

172.74

35.0

-83.0

680.6

South Palokas

PAL0396

3407872.38

7373234.12

173.36

129.8

-66.0

368.9

Hut

PAL0397

3407526.02

7372693.61

174.16

184.9

-44.9

260.0

Rumajarvi

Table 1: Drillhole collar locations presented within (finish KKJ grid), with corresponding hole orientations (azimuth and dip measured in degrees), total depth, and prospect target. Results from drillholes in bold have previously been published.

Figure 1: Locality map illustrating collar positions and drill-hole traces from Mawson's 2025 winter drilling campaign.

Figure 2: Plan-section illustration demonstrating both historical and published 2025 drill intercepts in the Raja mineralized zone (hole numbers highlighted in bold text). Downhole-EM conductors from late 2024, and new, 2025 conductive bodies from 'Raja Deeps' are illustrated in pink-hatched boxes.

Figure 3: Core photograph of sulfidic-rich interval of drillhole PAL0388 from Raja Deeps showing 2 visible gold grains observed within pyrhotitic disseminations (gold grains pictured in centre of yellow circle) from 668.5 metres down-hole. NQ2 core (50.2mm) for scale. It is important to note that analysis for gold has not yet been undertaken on this drillhole, and gold grades are at present unknown.

Figure 4: Map of BOT (base-of-till) samples drilled (green dots) and those drilled and analysed to date (orange dots) from the Rajapalot area from the 2025 winter season.

Figure 5. Preliminary gold-analyses from BOT drilling from 2025. To date, two areas with anomalous gold concentrations (>10ppb Au) from soil samples directly overlying bedrock are identified from Jussi's Corner, and Bear Nest.

SOURCE: Mawson Finland Limited



View the original press release on ACCESS Newswire

C.M.Harper--TFWP