The Fort Worth Press - Mawson Finland Limited Reports First Results for 2025 Winter Drilling Program Significant Step-out Extensions in Rajapalot and New Downhole-EM Survey Results

USD -
AED 3.673021
AFN 64.497229
ALL 80.969857
AMD 361.359899
ANG 1.789785
AOA 916.999462
ARS 1524.242503
AUD 1.43287
AWG 1.8
AZN 1.767659
BAM 1.74212
BBD 2.012426
BDT 123.598208
BGN 1.747831
BHD 0.37765
BIF 2995
BMD 1
BND 1.278237
BOB 11.675159
BRL 5.035301
BSD 0.999132
BTN 94.798398
BWP 13.69985
BYN 2.981094
BYR 19600
BZD 2.009486
CAD 1.41079
CDF 2313.4971
CHF 0.826275
CLF 0.024929
CLP 981.119726
CNY 6.691202
CNH 6.68239
COP 3169.79
CRC 453.826798
CUC 1
CUP 23.980333
CVE 98.217189
CZK 21.708991
DJF 177.719659
DKK 6.667798
DOP 61.451444
DZD 134.429052
EGP 53.903801
ERN 15
ETB 163.206182
EUR 0.89185
FJD 2.25795
FKP 0.750648
GBP 0.751597
GEL 2.589901
GGP 0.750648
GHS 11.685001
GIP 0.750648
GMD 73.5026
GNF 8844.094881
GTQ 7.639034
GYD 209.00734
HKD 7.8477
HNL 26.820882
HRK 6.721898
HTG 130.705681
HUF 323.61018
IDR 18050.8
ILS 3.1035
IMP 0.750648
INR 94.960045
IQD 1514.774979
IRR 1795877.505993
ISK 121.489667
JEP 0.750648
JMD 158.78431
JOD 0.709004
JPY 158.505501
KES 129.800372
KGS 87.450258
KHR 4068.089503
KMF 440.000136
KPW 899.999961
KRW 1333.42954
KWD 0.31095
KYD 0.83268
KZT 451.722955
LAK 22482.018394
LBP 89478.016105
LKR 331.122819
LRD 170.366279
LSL 16.42449
LTL 2.95274
LVL 0.604891
LYD 6.412478
MAD 9.77184
MDL 17.816041
MGA 4529.360679
MKD 54.914955
MMK 2099.513869
MNT 3596.411813
MOP 8.077478
MRU 40.003029
MUR 47.260194
MVR 15.460261
MWK 1732.62013
MXN 18.42063
MYR 4.082503
MZN 63.899405
NAD 16.424417
NGN 1330.469855
NIO 36.770142
NOK 9.502095
NPR 151.676406
NZD 1.765462
OMR 0.384498
PAB 0.999132
PEN 3.447023
PGK 4.544503
PHP 63.006974
PKR 276.59385
PLN 3.89754
PYG 5763.047022
QAR 3.642032
RON 4.749959
RSD 104.749733
RUB 82.74982
RWF 1476.78686
SAR 3.763551
SBD 8.064647
SCR 14.026998
SDG 601.501546
SEK 9.911105
SGD 1.279645
SHP 0.754745
SLE 24.680013
SLL 20969.504398
SOS 571.064633
SRD 37.699323
STD 20697.981008
STN 21.822878
SVC 8.742551
SYP 13001.999685
SZL 16.419114
THB 33.593979
TJS 9.202594
TMT 3.51
TND 2.982711
TOP 2.40776
TRY 49.57293
TTD 6.778453
TWD 32.491104
TZS 2649.967991
UAH 45.052265
UGX 4156.255985
UYU 40.119539
UZS 12034.649387
VES 878.910596
VND 25894.5
VUV 118.97233
WST 2.787823
XAF 585.015161
XAG 0.017513
XAU 0.000241509726
XCD 2.70255
XCG 1.80082
XDR 0.707052
XOF 585.015161
XPF 106.228901
YER 236.150048
ZAR 16.43586
ZMK 9001.193572
ZMW 19.959203
ZWL 321.999592
SSP 5750.775019
MXV 2.079501
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Mawson Finland Limited Reports First Results for 2025 Winter Drilling Program Significant Step-out Extensions in Rajapalot and New Downhole-EM Survey Results
Mawson Finland Limited Reports First Results for 2025 Winter Drilling Program Significant Step-out Extensions in Rajapalot and New Downhole-EM Survey Results

Mawson Finland Limited Reports First Results for 2025 Winter Drilling Program Significant Step-out Extensions in Rajapalot and New Downhole-EM Survey Results

VANCOUVER, BC / ACCESS Newswire / February 11, 2025 / Mawson Finland Limited ("Mawson" or the "Company") (TSXV:MFL) is pleased to announce drilling results from the first 6 drillholes from the 2025 drilling season at the Company's wholly-owned Rajapalot gold-cobalt project in Finland (see Table 1, Table 2, Table 3, and Figure 1 in Schedule "A" hereto).

Text size:

Highlights:

  • 120 metre step-out discovery from Drillhole PAL0373 in South Palokas confirms the effectiveness of the project EM survey

  • Further significant gold-bearing intercepts drilled in down-dip extensions at Palokas zone in PAL0380

  • Confirmation of mineralised 'Raja-footwall' EM conductor in drillhole PAL0378

  • Additional downhole EM (DHEM) surveys confirm the presence of significant conductors at depth in potential 'down-dip' Raja position

Ms. Noora Ahola, Mawson Finland CEO, states:"We are very pleased to present the first of our results from the 2025 drilling season at Rajapalot. Most significantly, we have demonstrated the larger potential of both the South Palokas and Palokas mineralised zones, intercepting gold-bearing mineralisation in a large 120 metre step-out down-dip of our deepest intercept at South Palokas which targeted a deep downhole-EM conductor discovered in our recent 2024 geophysics program. Significant intercepts have also been drilled in the deeper portions of the Palokas zone, while additional mineralisation is also confirmed from Raja resource extension drillholes. Additional downhole-EM geophysical surveys conducted in January 2025 have also indicated the potential of further mineralization of the projected down-dip extension of the Raja zone in which target-test drilling will be immediately undertaken. These initial successes from our 2025 drilling season demonstrate open mineralisation to depth in several of our important mineralised zones, and bodes well for our ongoing resource expansion objectives. We look forward to bringing further drilling results in the very near future."

Detailed Results

Winter Drilling

Four diamond drilling rigs are actively drilling at the Rajapalot project. Ten diamond drillholes have been completed to date, for a total of 4,424 metres at time of writing. Primary aims for this season's drilling program are to extend the limits of the currently defined envelope of the Rajapalot inferred mineral resource, while secondary aims focus on target-test drilling of geochemical and geophysical targets developed during the summer and autumn field exploration season in order to advance the 'exploration pipeline' and define new zones of gold-cobalt mineralization. To date, gold-assay results (cobalt values to be announced) have been received for the first 6 of the 10 completed holes and presented in Table 1, 2 and 3, and Figure 1.

South Palokas: To date, a single 1,004 metre drillhole PAL0373 - the deepest ever drilled at Rajapalot - has been completed at South Palokas, where it successfully penetrated the modelled deep, southern conductive anomaly (South Palokas deep conductor "A"), returning a significant intercept of 5 m @ 0.58 g/t Au from 785.65 metres downhole (see Figure 2). This intercept demonstrates the steeply-dipping, depth-continuation of South Palokas, representing an approximate 120m step-out in the plane of mineralisation. Closest significant intersections are PAL0303 with 30.8 metres @ 5.1 g/t Au at 120m distance and distance of 150m PAL0361 with 6m @ 2.24 g/t Au and 5.3m 2.73 g/t Au (Reported previously). Further drilling will be carried out in order to define geometry and test for high-grade mineralisation in the core-portions of the modelled conductive zone (refer to Figure 2).

Palokas: To date, 3 drillholes have been completed at Palokas zone of gold-cobalt mineralization, of which PAL0380 has returned a dispersed mineralised zone consisting of 5 separated intercepts recording a best of 6 m @ 1.03 g/t gold, and 7 m @ 0.57 g/t gold (refer to Table 2). Drillhole PAL0377 did not record any significant intercept, and drillhole PAL0382 awaits logging, sampling and assay.

Raja: To date, 4 drillholes have been completed at Raja, with significant intercepts recorded in holes PAL0374 (0.5 m @ 0.85 g/t gold), PAL0376 (6.2 m @ 2.42 g/t gold) and PAL0378 (best intercept of 8 m @ 1.22 g/t gold; refer to Table 2 and Figure 3). Drillhole PAL0381 awaits logging, sampling and assay. Importantly, drillhole PAL0378 intercepted the modelled downhole-EM conductor situated in the footwall-zone below the main Raja lens of mineralisation, confirming gold-mineralisation in this conductive anomaly, returning a 2.05 metre thick gold-bearing interval of 1.29 g/t gold (refer to Figure 3).

Geophysics

In January 2025, a series of downhole-EM surveys were carried out in the lower portions of the Raja zone in order to search for any conductive bodies in and around the historical deeper drilling. Downhole probes were sent down drillholes PAL0180, PAL0230 and PAL169, where each detected a series of off-hole conductors. Most notably, a conductive anomaly was detected below and to the immediate south of drillhole PAL0180, with the modelled plate measuring 150 x 75 metres, dipping shallowly to the north-west, with the centre of the modelled plate located approximately 640 metres below surface (refer to Figure 3; Raja deep conductor "B"). Similarly, off-hole and overlapping conductive anomalies were recorded from drillholes PAL0230 and PAL0169, with the modelled overlapping plates measuring a combined 200 x 50 metres in area, dipping shallowly to the north-west, with centres of the modelled plates located between 508 and 520 metres below surface (refer to Figure 3; Raja deep conductor "A"). Geophysical modelling and interpretation of these conductive anomalies is ongoing and more refined findings will be presented in future news releases.

Technical Background, Data Verification and Quality Assurance and Quality Control

Four diamond drill rigs from MK Core Drilling Oy, Comadev Oy and Arctic Drilling Company Oy, all with water recirculation and drill cuttings collection systems, were used in this drill program. Core diameter is NQ2 (50.7 mm). Core recoveries are excellent and average close to 100% in fresh rock. After photographing and logging in Mawson's Rovaniemi facilities, core intervals of between 0.4 to 2 metres are taken, then half-sawn by independent contractors the Geological Survey of Finland (GTK) in Rovaniemi, Palsatech Oy in Kemi and Geopool Oy in Sodankylä. The remaining half core is retained for verification and reference purposes. Analytical samples are transported by commercial transport from site to the independent contractor CRS Minlab Oy ("CRS") facility in Kempele, Finland. Samples were prepared and analyzed for gold using the PAL1000 technique which involves grinding the sample in steel pots with abrasive media in the presence of cyanide, followed by measuring the gold in solution with flame AAS equipment. Samples for multi-element analysis (including cobalt) are pulped at CRS, then transported by air to MSALABS in Vancouver, Canada and analyzed using four acid digest ICP-MS methods. All the foregoing laboratories are independent of the Company. The quality assurance and quality control program of Mawson consists of the systematic insertion of certified standards of known gold content, duplicate samples by quartering the core, and blanks placed within sample runs in interpreted mineralized rock. In addition, CRS inserts blanks and standards into the analytical process. In addition to the sample preparation and security measures described above, data verification procedures are well integrated into the Company's quality assurance and quality control program. Routine ongoing checking of all data is undertaken prior to being uploaded to the database. This will be followed by independent data verification audits at exploration milestones throughout the Rajapalot project's development. Dr. Fromhold (see "Qualified Person" below) has also reviewed the qualifications and analytical procedures of the above-mentioned laboratories, photographs of drill cores, and the PEA in connection with verifying the exploration information presented herein.

All maps have been created within the KKJ3/Finland Uniform Coordinate System (EPSG:2393). Tables 1-3 in Schedule "A" hereto provide collar and assay data. Due to the typically low angles of drill intercepts, the true thickness of the mineralized intervals are interpreted to be approximately 80-90% of the drilled thickness. Table 3 gives detailed individual assay data of all intervals reported in this press release. Intersections are reported with a lower cut of 0.1 g/t Au over sampled intervals, with composite data (Table 2 in Schedule "A" hereto) containing no more than 2 metres of consecutively sampled waste-rock (i.e., 2 metres @

Geophysical Survey Parameters

The downhole EM (DHEM) survey was conducted by Finnish geophysics provider Geovisor Oy from Rovaniemi, using a Zonge ZT-30 transmitter system. The acquisition was measured using the EMIT Smartem24 receiver system with EMIT DHEM Digiatlantis probe that measures the decaying magnetic field with three orthogonal Fluxgate magnetometer sensors producing along hole (A-component), and two perpendicular components (namely U and V- components). For each loop configuration, the base frequency was tested, and the base frequency was altered from 0.25 Hz to 1 Hz. The EM response was stacked over 32,128 EM pulses depending on the base frequency and the observed signal strength. The used time windows scheme was SMARTem standard containing 39 to 43 time channels depending on the base frequency. All the holes were measured in one piece from the collar with surveys having 10 metre reading intervals. The modelling was done using Maxwell software, using plate models. All maps have been created within the KKJ3/Finland Uniform Coordinate System (EPSG:2393).

Deposit Model

At Rajapalot, mineralization is regarded as orogenic in nature. All examples of gold-cobalt mineralisation are consistently located within highly-sheared and foliated wall-rocks adjacent to strongly hydrothermally altered, northwest to north dipping shear-zones. Mineralisation is typically encountered as disseminated to semi-massive sulfide lenses (predominantly pyrrhotite and lesser pyrite  cobaltite), hosted within strongly deformed and altered, mafic volcanic and volcaniclasitic stratigraphy of the upper portions of the Paleoproterozoic-aged Kivalo Group of the Peräpohja Greenstone Belt. Prospects with high-grade gold and cobalt mineralisation at Rajapalot occur across a 3 km (east-west) by 2 km (north-south) area within the larger Rajapalot project area measuring 4 km by 4 km with multiple mineralized boulders, base-of-till (BOT). Gold-Cobalt mineralization at Rajapalot has been drilled to approximately 470 metres below surface at both South Palokas and Raja prospects, and mineralisation remains open at depth across the entire project.

Rajapalot Mineral Resource

An Inferred Mineral Resource ("MRE") has been calculated for the Rajapalot project (effective date August 26, 2021), and is based on an 'underground only' mining scenario containing 9.8 million tonnes @ 2.8 g/t gold ("Au") and 441 ppm Co, equating to 867 thousand ounces ("koz") gold and 4,311 tonnes of cobalt.

Zone

Cut-off

(AuEq¹)

Tonnes

(kt)

Au

(g/t)

Co

(ppm)

Au

(koz)

Co

(tonnes)

Palokas

1.1

5,612

2.8

475

501

2,664

Raja

1.1

2,702

3.1

385

271

1,040

East Joki

1.1

299

4.5

363

43

109

Hut

1.1

831

1.3

428

36

355

Rumajärvi

1.1

336

1.4

424

15

142

Total Inferred Resources

9,780

2.8

441

867

4,311

Rajapalot Inferred Mineral Resource Effective August 26, 2021

  • The independent geologist and Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol). The effective date of the MRE remains unchanged to the Previous MRE (August 26, 2021, available on SEDAR as filed by the previous owner, Mawson), and will be restated in the PEA technical report when it is filed.

  • The mineral estimate is reported for a potential underground only scenario. Inferred resources were reported at a cut-off grade of 1.1 g/t (AuEq1 Au g/t + Co ppm /1005) with a depth of 20 meters below the base of solid rock regarded as the near-surface limit of potential mining.

  • Wireframe models were generated using gold and cobalt shells separately. Forty-eight separate gold and cobalt wireframes were constructed in Leapfrog Geo and grade distributions independently estimated using Ordinary Kriging in Leapfrog Edge. A gold top cut of 50 g/t Au was used for the gold domains. A cobalt top cut was not applied.

  • A parent block size of 12 m x 12 m x 4 m (>20% of the drillhole spacing) was determined as suitable. Sub-blocking down to 4 m x 4 m x 0.5 m was used for geologic control on volumes, thinner and moderately dipping wireframes.

  • Rounding of grades and tonnes may introduce apparent errors in averages and contained metals.

  • Drilling results to 20 June 2021.

  • Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

Qualified Person

The technical and scientific information in this news release was reviewed, verified and approved by Dr. Thomas Fromhold, an employee of Fromhold Geoconsult AB, and Member of The Australian Institute of Geosciences (MAIG, Membership No. 8838). Dr. Fromhold is a "qualified person" as defined under NI 43-101. Dr. Fromhold is not considered independent of the Company under NI 43-101 as he is a consultant of the Company.

About Mawson Finland Limited

Mawson Finland Limited is an exploration stage mining development company engaged in the acquisition and exploration of precious and base metal properties in Finland. The Company is primarily focused on gold and cobalt. The Corporation currently holds a 100% interest in the Rajapalot Gold-Cobalt Project located in Finland. The Rajapalot Project represents approximately 5% of the 100-square kilometre Rompas-Rajapalot Property, which is wholly owned by Mawson and consists of 11 granted exploration permits for 10,204 hectares and 2 exploration permit applications and a reservation notification area for a combined total of 40,496 hectares. In Finland, all operations are carried out through the Company's fully owned subsidiary, Mawson Oy. Mawson maintains an active local presence of Finnish staff with close ties to the communities of Rajapalot.

Additional disclosure including the Company's financial statements, technical reports, news releases and other information can be obtained at mawsonfinland.com or on SEDAR+ at www.sedarplus.ca.

Media and Investor Relations Inquiries

Please contact: Neil MacRae Executive Chairman at [email protected] or +1 (778) 999-4653, or Noora Ahola Chief Executive Officer at [email protected] or +358 (505) 213-515.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No securities regulatory authority has reviewed or approved of the contents of this news release.

Forward-looking Information

This news release includes certain "forward-looking information" and "forward-looking statements" within the meaning of applicable securities laws (collectively, "forward-looking information") which are not comprised of historical facts. Forward-looking information includes, without limitation, estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking information may be identified by such terms as "believes", "anticipates", "expects", "estimates", "aims", "may", "could", "would", "will", "must" or "plan". Since forward-looking information is based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, and management of the Company believes them to be reasonable based upon, among other information, the contents of the PEA and the exploration information disclosed in this news release, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, any expected receipt of additional assay results or other exploration results and the impact upon the Company thereof, any expected milestone independent data verification, the continuance of the Company's quality assurance and quality control program, potential mineralization whether peripheral to the existing Rajapalot resource or elsewhere, any anticipated disclosure of assay or other exploration results and the timing thereof, the estimation of mineral resources, exploration and mine development plans, including drilling, soil sampling, geophysical and geochemical work, any expected search for additional exploration targets and any results of such searches, potential acquisition by the Company of any property, the growth potential of the Rajapalot resource, all values, estimates and expectations drawn from or based upon the PEA, and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: any change in industry or wider economic conditions which could cause the Company to adjust or cancel entirely its exploration plans, failure to identify mineral resources or any additional exploration targets, failure to convert estimated mineral resources to reserves, any failure to receive the results of completed assays or other exploration work, poor exploration results, the inability to complete a feasibility study which recommends a production decision, the preliminary and uncertain nature of the PEA, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR+. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

SCHEDULE "A" - TABLES AND FIGURES

Hole ID

Easting KKJ

Northing KKJ

Elevation (mRL)

Azimuth

Dip

Total Depth (m)

Prospect

PAL0373

3407806

7374006

172

126.7

-59.9

1004.0

South Palokas

PAL0374

3408901

7372385

172

69.4

-75.4

300.0

Raja

PAL0375

3409137

7374399

177

186.0

-44.8

400.8

Hirvimaa

PAL0376

3408941

7372298

173

148.0

-63.0

167.6

Raja

PAL0377

3408276

7374025

174

86.2

-65.4

551.5

Palokas

PAL0378

3408817

7372713

174

183.0

-61.0

376.4

Raja

PAL0379

3408499

7373520

174

128.6

-49.6

191.2

South Palokas

PAL0380

3408275

7374025

174

98.4

-69.0

568.2

Palokas

PAL0381

3408817

7372713

174

170.0

-66.4

380.0

Raja

PAL0382

3408333

7373899

174

100.0

-63.0

484.5

Palokas

Table 1: Drillhole collar locations presented within (finish KKJ grid), with corresponding hole orientations (azimuth and dip), total depth, and prospect target. Results from drillholes in bold are presented within, while those in regular italics await logging, sampling and assay.

Hole ID

From

To

Thickness1 (m)

Gold (g/t)

Gold (gram-metres)

Cobalt ppm

PAL0373

760.90

762.70

1.80

0.17

0.31

TBA

PAL0373

785.65

790.65

5.00

0.58

2.90

TBA

PAL0373

795.30

796.75

1.45

0.47

0.69

TBA

PAL0374

55.30

55.80

0.50

0.85

0.43

TBA

PAL0376

55.75

61.95

6.20

2.42

15.02

TBA

PAL0377

-

-

-

-

TBA

PAL0378

326.00

334.00

8.00

1.22

9.73

TBA

PAL0378

349.00

351.10

2.10

0.75

1.58

TBA

PAL0378

362.80

364.85

2.05

1.29

2.64

TBA

PAL0380

441.65

448.65

7.00

0.57

4.00

TBA

PAL0380

461.65

462.65

1.00

0.47

0.47

TBA

PAL0380

468.30

474.30

6.00

1.03

6.17

TBA

PAL0380

479.30

481.30

2.00

0.32

0.63

TBA

PAL0380

484.30

487.30

3.00

0.23

0.70

TBA

1True-thickness of the mineralized intervals are interpreted to be approximately 80-90% of the Drilled Thickness. True-thickness is not precisely known at this time.
Table 2: Composited gold and cobalt concentrations from the drillholes reported in this news release. Individual assay values are listed in Table 3 hereinbelow.

Figure 1: Locality map illustrating collar positions and drill-hole traces from Mawson's 2025 winter drilling campaign as drilled to time of writing. Thin green line represents the section line on which long sections in Figure 2 herein below are positioned.
Figure 2: Long-section illustration of the Palokas and South Palokas zones. Intercepts from 2025 are highlighted with drillhole numbers in bold. Downhole-EM modelled conductors are represented with hatched pink boxes, with further planned pierce points of these conductive bodies illustrated by light-blue circles. Drillhole PAL0373 intercepted 5 metres of mineralised rock towards the lower margins of the conductive rock-mass of the South Palokas deep conductor "A". South Palokas deep conductor "B" awaits target-test drilling.

Figure 3: Plan-section illustration demonstrating both historical and 2024 drill intercepts in the Raja mineralized zone. Drillhole intercepts from 2025 drilling are highlighted with bold labels and lettering. Downhole-EM conductors from late 2024 (i.e., 'Raja footwall conductor'), and new, 2025 conductive bodies (i.e., 'Raja deep conductor "A"' and 'Raja deep conductor "B"') are illustrated in pink hatched boxes. Both downhole-EM plates illustrated here await target-test drilling.

Hole ID

From (m)

To (m)

Length (m)

Gold (g/t)

Cobalt ppm

Mineralisation

PAL0373

785.65

786.65

1.00

0.17

TBA

South Palokas

PAL0373

786.65

787.65

1.00

0.86

TBA

South Palokas

PAL0373

787.65

788.65

1.00

0.09

TBA

South Palokas

PAL0373

788.65

789.65

1.00

1.56

TBA

South Palokas

PAL0373

789.65

790.65

1.00

0.22

TBA

South Palokas

PAL0373

795.30

795.90

0.60

0.59

TBA

South Palokas

PAL0373

795.90

796.75

0.85

0.39

TBA

South Palokas

PAL0374

55.30

55.80

0.50

0.85

TBA

Raja

PAL0376

55.75

56.75

1.00

4.03

TBA

Raja

PAL0376

56.75

57.75

1.00

1.42

TBA

Raja

PAL0376

57.75

58.75

1.00

0.31

TBA

Raja

PAL0376

58.75

59.75

1.00

5.08

TBA

Raja

PAL0376

59.75

60.75

1.00

3.87

TBA

Raja

PAL0376

60.75

61.35

0.60

0.22

TBA

Raja

PAL0376

61.35

61.95

0.60

0.30

TBA

Raja

PAL0378

326.00

327.00

1.00

0.10

TBA

Raja

PAL0378

327.00

328.00

1.00

0.69

TBA

Raja

PAL0378

328.00

329.00

1.00

0.24

TBA

Raja

PAL0378

329.00

330.00

1.00

0.10

TBA

Raja

PAL0378

330.00

331.00

1.00

0.89

TBA

Raja

PAL0378

331.00

332.00

1.00

2.55

TBA

Raja

PAL0378

332.00

333.00

1.00

3.88

TBA

Raja

PAL0378

333.00

334.00

1.00

1.28

TBA

Raja

PAL0378

349.00

349.70

0.70

0.57

TBA

Raja

PAL0378

349.70

350.40

0.70

TBA

Raja

PAL0378

350.40

351.10

0.70

1.74

TBA

Raja

PAL0378

362.80

363.80

1.00

2.48

TBA

Raja

PAL0378

363.80

364.45

0.65

0.19

TBA

Raja

PAL0380

441.65

442.65

1.00

0.35

TBA

Palokas

PAL0380

442.65

443.65

1.00

1.45

TBA

Palokas

PAL0380

443.65

444.65

1.00

0.08

TBA

Palokas

PAL0380

444.65

445.65

1.00

0.30

TBA

Palokas

PAL0380

445.65

446.75

1.10

0.24

TBA

Palokas

PAL0380

446.75

447.65

0.90

1.56

TBA

Palokas

PAL0380

447.65

448.65

1.00

0.15

TBA

Palokas

PAL0380

461.65

462.65

1.00

0.47

TBA

Palokas

PAL0380

468.30

469.30

1.00

2.59

TBA

Palokas

PAL0380

469.30

470.30

1.00

0.93

TBA

Palokas

PAL0380

470.30

471.30

1.00

2.06

TBA

Palokas

PAL0380

471.30

472.30

1.00

0.06

TBA

Palokas

PAL0380

472.30

473.30

1.00

0.16

TBA

Palokas

PAL0380

473.30

474.30

1.00

0.37

TBA

Palokas

PAL0380

479.30

480.30

1.00

0.15

TBA

Palokas

PAL0380

480.30

481.30

1.00

0.48

TBA

Palokas

PAL0380

484.30

485.30

1.00

0.36

TBA

Palokas

PAL0380

485.30

486.30

1.00

0.24

TBA

Palokas

PAL0380

486.30

487.30

1.00

0.10

TBA

Palokas

Table 3: All gold sample intervals with their corresponding gold and cobalt concentrations (where available), that are contained within above composited intervals, that meet the lower-cut criteria of 1 metre intervals at greater than 0.1 g/t gold, containing no more than 2 metres of internal waste.

SOURCE: Mawson Finland Limited



View the original press release on ACCESS Newswire

W.Knight--TFWP