The Fort Worth Press - NASA sticks to plan to launch Moon rocket Wednesday

USD -
AED 3.672497
AFN 64.999605
ALL 79.198216
AMD 363.40991
ANG 1.790365
AOA 916.999749
ARS 1512.740896
AUD 1.410119
AWG 1.8
AZN 1.701556
BAM 1.695609
BBD 2.01466
BDT 123.160418
BGN 1.683441
BHD 0.377026
BIF 2995
BMD 1
BND 1.273738
BOB 10.998357
BRL 5.152295
BSD 1.000308
BTN 95.98391
BWP 13.567066
BYN 3.037656
BYR 19600
BZD 2.011747
CAD 1.398635
CDF 2309.99961
CHF 0.825065
CLF 0.024175
CLP 954.580414
CNY 6.706399
CNH 6.708715
COP 3133.76
CRC 447.438348
CUC 1
CUP 26.5
CVE 96.000146
CZK 21.201985
DJF 177.719662
DKK 6.51625
DOP 58.850245
DZD 133.881026
EGP 52.197697
ERN 15
ETB 160.949866
EUR 0.87169
FJD 2.240751
FKP 0.741937
GBP 0.747065
GEL 2.604995
GGP 0.741937
GHS 11.504973
GIP 0.741937
GMD 74.000116
GNF 8777.499227
GTQ 7.636255
GYD 209.277425
HKD 7.844351
HNL 26.907894
HRK 6.568963
HTG 130.738787
HUF 318.462501
IDR 17728.45
ILS 3.027502
IMP 0.741937
INR 96.13265
IQD 1310.5
IRR 1374574.999814
ISK 121.85999
JEP 0.741937
JMD 157.856864
JOD 0.70902
JPY 155.914497
KES 129.560025
KGS 87.449899
KHR 4052.999535
KMF 427.999882
KPW 900.000318
KRW 1374.710338
KWD 0.30886
KYD 0.833583
KZT 444.773881
LAK 22385.000132
LBP 89550.000264
LKR 331.544497
LRD 174.649958
LSL 16.295884
LTL 2.952741
LVL 0.60489
LYD 6.345011
MAD 9.467004
MDL 17.439779
MGA 4379.999714
MKD 53.670579
MMK 2099.62457
MNT 3595.075141
MOP 8.082447
MRU 40.059743
MUR 47.29002
MVR 15.410069
MWK 1736.485115
MXN 17.23628
MYR 4.097899
MZN 63.893708
NAD 16.304398
NGN 1330.630212
NIO 36.680381
NOK 9.42276
NPR 153.579928
NZD 1.74793
OMR 0.384434
PAB 1.000282
PEN 3.357999
PGK 4.44625
PHP 62.85995
PKR 277.304156
PLN 3.804265
PYG 5918.765443
QAR 3.643976
RON 4.587998
RSD 102.311776
RUB 84.249239
RWF 1470
SAR 3.743177
SBD 8.000512
SCR 13.846248
SDG 601.501138
SEK 9.85385
SGD 1.27738
SHP 0.746965
SLE 24.63963
SLL 20969.491881
SOS 571.673797
SRD 37.752498
STD 20697.981008
STN 21.65
SVC 8.752834
SYP 13002.000254
SZL 16.390079
THB 33.390156
TJS 9.226022
TMT 3.5
TND 2.925022
TOP 2.40776
TRY 48.673799
TTD 6.782056
TWD 31.876095
TZS 2645.003047
UAH 44.609389
UGX 3916.077853
UYU 40.244484
UZS 11794.999934
VES 845.45495
VND 26000
VUV 118.157011
WST 2.736734
XAF 571.791402
XAG 0.015808
XAU 0.000234
XCD 2.70255
XCG 1.802758
XDR 0.707052
XOF 571.791402
XPF 103.849978
YER 236.649945
ZAR 16.37321
ZMK 9001.191092
ZMW 19.630588
ZWL 321.999592
SSP 5655.283496
MXV 1.954359
  • RBGPF

    0.0000

    69.99

    0%

  • RYCEF

    0.2600

    19.3

    +1.35%

  • CMSC

    0.1400

    20.48

    +0.68%

  • GSK

    0.2800

    50.29

    +0.56%

  • RELX

    0.0500

    34.27

    +0.15%

  • BTI

    -0.4300

    56.09

    -0.77%

  • RIO

    -1.4700

    95.79

    -1.53%

  • BCE

    -0.4000

    22.5

    -1.78%

  • AZN

    1.0400

    162.89

    +0.64%

  • NGG

    1.1000

    76.03

    +1.45%

  • BCC

    -0.6200

    75.31

    -0.82%

  • VOD

    -0.2200

    17.46

    -1.26%

  • JRI

    -0.1200

    11.5

    -1.04%

  • CMSD

    0.1785

    20.29

    +0.88%

  • BP

    -1.5800

    45.38

    -3.48%

NASA sticks to plan to launch Moon rocket Wednesday
NASA sticks to plan to launch Moon rocket Wednesday / Photo: © AFP/File

NASA sticks to plan to launch Moon rocket Wednesday

NASA said Friday it plans to attempt its long-delayed uncrewed mission to the Moon as scheduled next Wednesday, after inspections revealed only minor damage from Hurricane Nicole's passage through Florida.

Text size:

Jim Free, a senior official at the US space agency, told journalists there was "nothing preventing" a launch on that date, and said that NASA teams had managed to access the launch pad on Thursday.

The launch of the heavy lift rocket, the most powerful ever built by contractors for NASA, is now due to take place at 01:04am local time (0604 GMT) on Wednesday, with a possible launch window of two hours.

The uncrewed mission, dubbed Artemis 1, will bring the United States a step closer to returning astronauts to the Moon five decades after humans last walked on the lunar surface.

The rocket will propel the empty Orion crew capsule to the Moon, without landing on its surface. If the launch takes place as planned, the mission will last 25-and-a-half days before the capsule returns on December 11 with splashdown in the Pacific Ocean.

However, the US space agency has "some work to do" before the launch, said Free, such as powering up the vehicle and carrying out some technical tests.

One element on the base of the rocket, which may have been damaged, may need to be replaced.

The highly anticipated launch has already been delayed three times in as many months.

Free, who is NASA's associate administrator for exploration systems development, said two back-up launch dates have been set for November 19 and November 25, if necessary.

Winds from Hurricane Nicole, a category 1 storm, battered the rocket as it stood on its launch pad at the Kennedy Space Center. However, the wind speeds did not surpass the limits the vehicle can withstand, said Free.

However, he conceded that if NASA had known the hurricane was approaching, the SLS rocket would have been left in the vehicle assembly building.

The rocket was returned to the building in September to protect it from Hurricane Ian, but was taken back out to the launch pad just days before Nicole arrived.

Artemis 1 will mark the launch of the flagship Artemis program, which is aimed at taking the first woman and the first person of color to the Moon, by 2025, at the earliest.

NASA wants to establish a lasting human presence on the Moon, including the construction of a space station in orbit around the Moon. This is seen as a step that could lead to the first trip to Mars.

L.Davila--TFWP