The Fort Worth Press - Olenox Industries Reports July 2026 Bitcoin Production, Its second Monthly Operating Update Following the Closing of the CS Digital Acquisition

USD -
AED 3.672501
AFN 64.999988
ALL 79.173956
AMD 364.00811
ANG 1.789783
AOA 918.000126
ARS 1497.250009
AUD 1.407203
AWG 1.80125
AZN 1.699613
BAM 1.673104
BBD 2.01539
BDT 122.281202
BGN 1.696366
BHD 0.377268
BIF 2973.916317
BMD 1
BND 1.271932
BOB 11.542986
BRL 5.194103
BSD 1.000659
BTN 95.718306
BWP 13.434508
BYN 3.043612
BYR 19600
BZD 2.012524
CAD 1.377015
CDF 2273.000487
CHF 0.798955
CLF 0.023464
CLP 923.460242
CNY 6.72975
CNH 6.726645
COP 3052.8
CRC 453.402228
CUC 1
CUP 26.5
CVE 94.330261
CZK 20.677203
DJF 178.187838
DKK 6.400015
DOP 58.471778
DZD 132.809899
EGP 50.913404
ERN 15
ETB 163.449465
EUR 0.85609
FJD 2.1993
FKP 0.735015
GBP 0.733865
GEL 2.599925
GGP 0.735015
GHS 11.132356
GIP 0.735015
GMD 73.489513
GNF 8792.543704
GTQ 7.635945
GYD 209.26741
HKD 7.84379
HNL 26.831146
HRK 6.447995
HTG 130.914597
HUF 312.548496
IDR 17798.5
ILS 2.99225
IMP 0.735015
INR 95.78055
IQD 1310.845723
IRR 1374599.999891
ISK 121.570358
JEP 0.735015
JMD 158.313693
JOD 0.709007
JPY 158.768501
KES 129.531461
KGS 87.450427
KHR 4023.337582
KMF 422.00032
KPW 900.000294
KRW 1396.624937
KWD 0.308296
KYD 0.833925
KZT 456.002874
LAK 22541.886418
LBP 89608.575327
LKR 330.163782
LRD 181.619088
LSL 16.146032
LTL 2.95274
LVL 0.60489
LYD 6.337338
MAD 9.252116
MDL 17.181525
MGA 4276.542323
MKD 52.628652
MMK 2099.608389
MNT 3598.398104
MOP 8.084231
MRU 39.988023
MUR 46.809482
MVR 15.450303
MWK 1735.176615
MXN 16.991015
MYR 4.044397
MZN 63.89495
NAD 16.145824
NGN 1348.090005
NIO 36.828238
NOK 9.33371
NPR 153.148806
NZD 1.68278
OMR 0.384497
PAB 1.000654
PEN 3.350814
PGK 4.498929
PHP 61.872499
PKR 277.656585
PLN 3.697255
PYG 6025.116772
QAR 3.647726
RON 4.496039
RSD 100.425032
RUB 83.327854
RWF 1470.917848
SAR 3.756633
SBD 8.032258
SCR 13.740667
SDG 601.50433
SEK 9.491825
SGD 1.272155
SHP 0.740866
SLE 24.59611
SLL 20969.499227
SOS 571.883194
SRD 37.742003
STD 20697.981008
STN 20.959339
SVC 8.755908
SYP 13001.999906
SZL 16.142113
THB 32.921496
TJS 9.246023
TMT 3.5
TND 2.9105
TOP 2.40776
TRY 47.955302
TTD 6.781357
TWD 31.9335
TZS 2647.975969
UAH 44.634778
UGX 3722.127883
UYU 40.105225
UZS 11847.637787
VES 776.44435
VND 26102
VUV 118.216132
WST 2.729275
XAF 561.160206
XAG 0.0152
XAU 0.000224
XCD 2.70255
XCG 1.803429
XDR 0.707052
XOF 561.165007
XPF 102.02362
YER 237.075008
ZAR 16.17335
ZMK 9001.201353
ZMW 18.886955
ZWL 321.999592
  • RBGPF

    0.3500

    69.35

    +0.5%

  • RYCEF

    0.0200

    20.83

    +0.1%

  • BTI

    -0.4000

    55.98

    -0.71%

  • RELX

    0.5900

    35.1

    +1.68%

  • BCE

    0.3400

    23.7

    +1.43%

  • GSK

    1.7300

    52.88

    +3.27%

  • RIO

    3.7500

    100.44

    +3.73%

  • CMSD

    0.0600

    21.15

    +0.28%

  • CMSC

    0.0580

    21.298

    +0.27%

  • BP

    0.3200

    43.73

    +0.73%

  • BCC

    2.9500

    83.13

    +3.55%

  • JRI

    -0.0600

    12.38

    -0.48%

  • VOD

    0.0400

    16.17

    +0.25%

  • AZN

    4.8500

    164.95

    +2.94%

  • NGG

    -1.4900

    80.66

    -1.85%

Olenox Industries Reports July 2026 Bitcoin Production, Its second Monthly Operating Update Following the Closing of the CS Digital Acquisition
Olenox Industries Reports July 2026 Bitcoin Production, Its second Monthly Operating Update Following the Closing of the CS Digital Acquisition

Olenox Industries Reports July 2026 Bitcoin Production, Its second Monthly Operating Update Following the Closing of the CS Digital Acquisition

Second post-closing operating disclosure from the newly combined, energy-led digital infrastructure platform. Current production is generated at third-party hosting facilities on the ERCOT grid; converting Olenox's low-cost natural gas into compute at the point of generation, targeting power costs below $0.02 per kWh, is the platform's forward strategy.

Text size:

CONROE, TX / ACCESS Newswire / August 20, 2026 / Olenox Industries Inc. (NASDAQ:OLOX) ("Olenox" or the "Company"), a vertically integrated U.S. energy company, today reported Bitcoin production for the month of July 2026 from the operations of CS Digital Ventures, LLC ("CS Digital"), which the Company acquired on May 28, 2026. This is the Company's second monthly operating update as a combined, energy-led digital infrastructure platform.

July 2026 Production Highlights

  • Bitcoin mined: approximately 15.13 BTC credited to the Company's mining pool accounts during July 1-31, 2026.

  • Average operational hashrate: approximately 1.02 EH/s realized across the Company's mining pool accounts during the period.

  • Fleet utilization: realized hashrate represented approximately 64% of the fleet's economic capacity during the period, reflecting planned summer curtailment, low-power-mode operation and normal equipment availability.

  • Installed fleet: 9,584 current-generation S21-class ASIC miners representing approximately 35 MW of installed capacity (approximately 2.19 EH/s nameplate) at a blended hardware efficiency of approximately 16 J/TH.

Production figures are preliminary, unaudited, and subject to final operational and financial review. Reported production reflects Bitcoin credited to the Company's pool accounts, before settlement of hosting profit-share amounts described below, and is shown net of mining-pool fees.

The July production reported herein was generated at third-party hosting facilities drawing power from the ERCOT grid. The Company's strategy of converting Olenox's natural gas into compute at the point of generation, including the targeted sub-$0.02 per kWh power cost, describes the combined platform's forward plan and is not reflected in the current period's results.

The Company expects to provide monthly production updates in the early part of each month, consistent with industry practice among Bitcoin mining operators.

Profit-Share Arrangement

The majority of the Company's mining fleet operates at third-party hosting facilities under profit-share arrangements, whereby the hosting provider is compensated through a share of mining-related value rather than solely through a fixed hosting fee. These arrangements are settled through two different mechanisms. Under most of them, the hosting provider's share is settled directly at the mining-pool level, so that only the Company's share is credited to its pool accounts. Under another arrangement, covering a portion of the fleet, the full output of the relevant machines is credited to the Company's pool accounts and the hosting provider is instead compensated separately through a monthly invoice covering power, a management fee and a profit-share component.

The production and hashrate figures reported above reflect Bitcoin and hashrate credited to the Company's pool accounts. For the portion of the fleet settled by monthly invoice, these figures are stated before deduction of the related hosting costs, which are recognized separately as an operating expense for the period and were not yet finalized as of the date of this release. Power costs are borne by the Company broadly in proportion to the economic output it retains. The Company intends to refine its production reporting methodology as invoicing for the period is finalized and expects to provide additional detail in future updates.

Seasonal Operations and Outlook

July production reflects deliberate, weather-driven curtailment at the Company's Texas hosting site. During periods of high ambient heat, the Company curtails or reduces operations to protect the fleet - a standard practice for Texas-based mining operations during the summer season, and one that also aligns power use with grid and pricing conditions. As a result, realized hashrate during the period was below the fleet's nameplate capacity.

For the summer, the Company has elected to operate the fleet in a low-power mode (LPM) to preserve hardware during the hottest months, reverting to normal operation once the high-heat season ends. Internal testing indicates that LPM maintains miner efficiency - reducing power consumption broadly in proportion to the reduction in hashrate - while meaningfully lowering the risk of heat-related hardware failures. The Company expects this approach to result in temporarily lower hashrate and Bitcoin production during the summer months, in exchange for improved fleet longevity, reduced downtime, and disciplined power consumption. Monthly production is expected to vary with seasonal temperatures, curtailment and network conditions.

Management Commentary

"July is our second month of reporting Bitcoin production as a combined platform," said Mike McLaren, Chairman and Chief Executive Officer of Olenox. "We intend to continue reporting production on a monthly basis as we bring Olenox's energy assets and CS Digital's operating capability together."

About Olenox Industries Inc.

Olenox Industries Inc. (NASDAQ:OLOX) is a vertically integrated U.S. energy company operating across multiple business lines, including oil and gas, energy services and energy technologies, including the proprietary Olenox process. The Company is focused on acquiring, optimizing and scaling energy-related infrastructure and operating assets across key U.S. markets, with a strategic focus on bringing low-cost natural gas to high-value end uses, including digital infrastructure and next-generation compute.

Forward-Looking Statements

This press release contains "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995 and other applicable U.S. federal securities laws. Forward-looking statements include, without limitation, statements regarding monthly Bitcoin production and the expectation of providing future monthly updates; expected benefits of the completed transaction between Olenox Industries Inc. and CS Digital Ventures, LLC; the Series D Preferred Stock, the Seller Note, the Warrants and any additional Series D Preferred Stock issuable upon achievement of post-closing milestones; the receipt of stockholder approval permitting conversion of the Series D Preferred Stock and exercise of the Warrants into common stock; the development and scaling of off-grid, gas-powered digital infrastructure; targeted power costs; and the future business, operations and financial performance of the combined company. These statements are based on current expectations and assumptions and are subject to risks, uncertainties and other factors, many outside the Company's control, that could cause actual results to differ materially, including, among others, volatility in Bitcoin price and network difficulty; the ability to integrate CS Digital's operations; the ability to service the Seller Note; the ability to obtain stockholder approval under applicable Nasdaq listing rules; the ability to achieve the milestones underlying the post-closing earnout; volatility in commodity prices, including natural gas and electricity; the availability and terms of hosting arrangements; regulatory developments; and the other risks described in the Company's filings with the U.S. Securities and Exchange Commission. Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update any forward-looking statement except as required by law.

Investor and Media Contacts

Rona Menashe
Guttman Associates PR
[email protected]

SOURCE: Olenox Industries Inc.



View the original press release on ACCESS Newswire

S.Weaver--TFWP