The Fort Worth Press - Olenox Industries Reports July 2026 Bitcoin Production, Its second Monthly Operating Update Following the Closing of the CS Digital Acquisition

USD -
AED 3.672504
AFN 64.000368
ALL 81.109773
AMD 359.873322
ANG 1.789785
AOA 918.000367
ARS 1528.316696
AUD 1.422678
AWG 1.8025
AZN 1.70397
BAM 1.74477
BBD 2.011597
BDT 123.993042
BGN 1.747831
BHD 0.377091
BIF 2997.279094
BMD 1
BND 1.275971
BOB 12.110264
BRL 5.440104
BSD 0.998796
BTN 94.782997
BWP 13.79901
BYN 2.942058
BYR 19600
BZD 2.008653
CAD 1.39745
CDF 2315.000362
CHF 0.823841
CLF 0.025228
CLP 992.920396
CNY 6.661104
CNH 6.651304
COP 3164.280298
CRC 454.168339
CUC 1
CUP 23.969847
CVE 98.367456
CZK 21.81604
DJF 177.849146
DKK 6.697404
DOP 60.537937
DZD 135.196931
EGP 55.738436
ERN 15
ETB 161.241358
EUR 0.892404
FJD 2.243704
FKP 0.746437
GBP 0.746436
GEL 2.603861
GGP 0.746437
GHS 11.635666
GIP 0.746437
GMD 74.000355
GNF 8839.823364
GTQ 7.635488
GYD 209.349213
HKD 7.84585
HNL 26.845087
HRK 6.76901
HTG 130.853294
HUF 327.940388
IDR 18127.15
ILS 3.14456
IMP 0.746437
INR 94.912504
IQD 1514.072885
IRR 1868415.000352
ISK 121.830386
JEP 0.746437
JMD 158.713591
JOD 0.70904
JPY 157.562504
KES 129.791695
KGS 87.448704
KHR 4075.114858
KMF 441.00035
KPW 899.999961
KRW 1333.420383
KWD 0.31117
KYD 0.83233
KZT 452.856952
LAK 22487.176056
LBP 89438.155136
LKR 332.209287
LRD 169.784558
LSL 16.644543
LTL 2.95274
LVL 0.60489
LYD 6.420447
MAD 9.82042
MDL 17.877693
MGA 4517.596681
MKD 54.931085
MMK 2099.994593
MNT 3599.692564
MOP 8.070654
MRU 40.499576
MUR 47.280378
MVR 15.450378
MWK 1731.477764
MXN 18.78615
MYR 4.058204
MZN 63.910377
NAD 16.644543
NGN 1346.470377
NIO 36.754539
NOK 9.208504
NPR 151.652616
NZD 1.772422
OMR 0.382702
PAB 0.998885
PEN 3.456889
PGK 4.545252
PHP 63.764504
PKR 276.304474
PLN 3.94725
PYG 5851.286855
QAR 3.64084
RON 4.782204
RSD 104.839645
RUB 80.300995
RWF 1474.374415
SAR 3.7544
SBD 8.058206
SCR 14.652482
SDG 601.503676
SEK 9.826204
SGD 1.278804
SHP 0.748335
SLE 22.903667
SLL 20969.504398
SOS 570.765868
SRD 37.619504
STD 20697.981008
STN 21.856461
SVC 8.739016
SYP 13001.999685
SZL 16.639458
THB 33.723038
TJS 9.193541
TMT 3.5
TND 2.986752
TOP 2.40776
TRY 49.933804
TTD 6.771935
TWD 32.621404
TZS 2646.683617
UAH 45.299969
UGX 4244.613944
UYU 40.153441
UZS 11979.124849
VES 887.479804
VND 25803.5
VUV 119.284453
WST 2.776099
XAF 585.378718
XAG 0.020359
XAU 0.000258029557
XCD 2.70255
XCG 1.799991
XDR 0.707052
XOF 585.378718
XPF 106.3919
YER 236.203589
ZAR 16.719695
ZMK 9001.203584
ZMW 20.14006
ZWL 321.999592
SSP 5745.299168
MXV 2.117302
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Olenox Industries Reports July 2026 Bitcoin Production, Its second Monthly Operating Update Following the Closing of the CS Digital Acquisition
Olenox Industries Reports July 2026 Bitcoin Production, Its second Monthly Operating Update Following the Closing of the CS Digital Acquisition

Olenox Industries Reports July 2026 Bitcoin Production, Its second Monthly Operating Update Following the Closing of the CS Digital Acquisition

Second post-closing operating disclosure from the newly combined, energy-led digital infrastructure platform. Current production is generated at third-party hosting facilities on the ERCOT grid; converting Olenox's low-cost natural gas into compute at the point of generation, targeting power costs below $0.02 per kWh, is the platform's forward strategy.

Text size:

CONROE, TX / ACCESS Newswire / August 20, 2026 / Olenox Industries Inc. (NASDAQ:OLOX) ("Olenox" or the "Company"), a vertically integrated U.S. energy company, today reported Bitcoin production for the month of July 2026 from the operations of CS Digital Ventures, LLC ("CS Digital"), which the Company acquired on May 28, 2026. This is the Company's second monthly operating update as a combined, energy-led digital infrastructure platform.

July 2026 Production Highlights

  • Bitcoin mined: approximately 15.13 BTC credited to the Company's mining pool accounts during July 1-31, 2026.

  • Average operational hashrate: approximately 1.02 EH/s realized across the Company's mining pool accounts during the period.

  • Fleet utilization: realized hashrate represented approximately 64% of the fleet's economic capacity during the period, reflecting planned summer curtailment, low-power-mode operation and normal equipment availability.

  • Installed fleet: 9,584 current-generation S21-class ASIC miners representing approximately 35 MW of installed capacity (approximately 2.19 EH/s nameplate) at a blended hardware efficiency of approximately 16 J/TH.

Production figures are preliminary, unaudited, and subject to final operational and financial review. Reported production reflects Bitcoin credited to the Company's pool accounts, before settlement of hosting profit-share amounts described below, and is shown net of mining-pool fees.

The July production reported herein was generated at third-party hosting facilities drawing power from the ERCOT grid. The Company's strategy of converting Olenox's natural gas into compute at the point of generation, including the targeted sub-$0.02 per kWh power cost, describes the combined platform's forward plan and is not reflected in the current period's results.

The Company expects to provide monthly production updates in the early part of each month, consistent with industry practice among Bitcoin mining operators.

Profit-Share Arrangement

The majority of the Company's mining fleet operates at third-party hosting facilities under profit-share arrangements, whereby the hosting provider is compensated through a share of mining-related value rather than solely through a fixed hosting fee. These arrangements are settled through two different mechanisms. Under most of them, the hosting provider's share is settled directly at the mining-pool level, so that only the Company's share is credited to its pool accounts. Under another arrangement, covering a portion of the fleet, the full output of the relevant machines is credited to the Company's pool accounts and the hosting provider is instead compensated separately through a monthly invoice covering power, a management fee and a profit-share component.

The production and hashrate figures reported above reflect Bitcoin and hashrate credited to the Company's pool accounts. For the portion of the fleet settled by monthly invoice, these figures are stated before deduction of the related hosting costs, which are recognized separately as an operating expense for the period and were not yet finalized as of the date of this release. Power costs are borne by the Company broadly in proportion to the economic output it retains. The Company intends to refine its production reporting methodology as invoicing for the period is finalized and expects to provide additional detail in future updates.

Seasonal Operations and Outlook

July production reflects deliberate, weather-driven curtailment at the Company's Texas hosting site. During periods of high ambient heat, the Company curtails or reduces operations to protect the fleet - a standard practice for Texas-based mining operations during the summer season, and one that also aligns power use with grid and pricing conditions. As a result, realized hashrate during the period was below the fleet's nameplate capacity.

For the summer, the Company has elected to operate the fleet in a low-power mode (LPM) to preserve hardware during the hottest months, reverting to normal operation once the high-heat season ends. Internal testing indicates that LPM maintains miner efficiency - reducing power consumption broadly in proportion to the reduction in hashrate - while meaningfully lowering the risk of heat-related hardware failures. The Company expects this approach to result in temporarily lower hashrate and Bitcoin production during the summer months, in exchange for improved fleet longevity, reduced downtime, and disciplined power consumption. Monthly production is expected to vary with seasonal temperatures, curtailment and network conditions.

Management Commentary

"July is our second month of reporting Bitcoin production as a combined platform," said Mike McLaren, Chairman and Chief Executive Officer of Olenox. "We intend to continue reporting production on a monthly basis as we bring Olenox's energy assets and CS Digital's operating capability together."

About Olenox Industries Inc.

Olenox Industries Inc. (NASDAQ:OLOX) is a vertically integrated U.S. energy company operating across multiple business lines, including oil and gas, energy services and energy technologies, including the proprietary Olenox process. The Company is focused on acquiring, optimizing and scaling energy-related infrastructure and operating assets across key U.S. markets, with a strategic focus on bringing low-cost natural gas to high-value end uses, including digital infrastructure and next-generation compute.

Forward-Looking Statements

This press release contains "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995 and other applicable U.S. federal securities laws. Forward-looking statements include, without limitation, statements regarding monthly Bitcoin production and the expectation of providing future monthly updates; expected benefits of the completed transaction between Olenox Industries Inc. and CS Digital Ventures, LLC; the Series D Preferred Stock, the Seller Note, the Warrants and any additional Series D Preferred Stock issuable upon achievement of post-closing milestones; the receipt of stockholder approval permitting conversion of the Series D Preferred Stock and exercise of the Warrants into common stock; the development and scaling of off-grid, gas-powered digital infrastructure; targeted power costs; and the future business, operations and financial performance of the combined company. These statements are based on current expectations and assumptions and are subject to risks, uncertainties and other factors, many outside the Company's control, that could cause actual results to differ materially, including, among others, volatility in Bitcoin price and network difficulty; the ability to integrate CS Digital's operations; the ability to service the Seller Note; the ability to obtain stockholder approval under applicable Nasdaq listing rules; the ability to achieve the milestones underlying the post-closing earnout; volatility in commodity prices, including natural gas and electricity; the availability and terms of hosting arrangements; regulatory developments; and the other risks described in the Company's filings with the U.S. Securities and Exchange Commission. Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update any forward-looking statement except as required by law.

Investor and Media Contacts

Rona Menashe
Guttman Associates PR
[email protected]

SOURCE: Olenox Industries Inc.



View the original press release on ACCESS Newswire

S.Weaver--TFWP