The Fort Worth Press - NASA chief rules out March launch of Moon mission over technical issues

USD -
AED 3.672504
AFN 64.000368
ALL 81.450403
AMD 370.780403
ANG 1.789884
AOA 918.000367
ARS 1392.916052
AUD 1.388889
AWG 1.8
AZN 1.70397
BAM 1.669697
BBD 2.01454
BDT 122.725158
BGN 1.668102
BHD 0.37765
BIF 2976
BMD 1
BND 1.275896
BOB 6.911331
BRL 4.953904
BSD 1.000226
BTN 94.881811
BWP 13.592996
BYN 2.822528
BYR 19600
BZD 2.011629
CAD 1.35855
CDF 2320.000362
CHF 0.781253
CLF 0.022842
CLP 899.000361
CNY 6.82825
CNH 6.831005
COP 3657.4
CRC 454.73562
CUC 1
CUP 26.5
CVE 94.450394
CZK 20.780394
DJF 177.720393
DKK 6.369404
DOP 59.503884
DZD 132.503944
EGP 53.639736
ERN 15
ETB 157.000358
EUR 0.85285
FJD 2.192104
FKP 0.736618
GBP 0.735159
GEL 2.680391
GGP 0.736618
GHS 11.203856
GIP 0.736618
GMD 73.000355
GNF 8775.000355
GTQ 7.641507
GYD 209.25239
HKD 7.832904
HNL 26.620388
HRK 6.42804
HTG 131.024649
HUF 311.140388
IDR 17334.35
ILS 2.94383
IMP 0.736618
INR 94.910504
IQD 1310
IRR 1314000.000352
ISK 122.680386
JEP 0.736618
JMD 156.725146
JOD 0.70904
JPY 156.57504
KES 129.150385
KGS 87.420504
KHR 4012.503796
KMF 420.00035
KPW 899.999976
KRW 1473.730383
KWD 0.30729
KYD 0.833543
KZT 463.288124
LAK 21980.000349
LBP 89550.000349
LKR 319.671116
LRD 183.875039
LSL 16.660381
LTL 2.95274
LVL 0.60489
LYD 6.350381
MAD 9.25125
MDL 17.233504
MGA 4150.000347
MKD 52.564485
MMK 2099.490131
MNT 3577.850535
MOP 8.070846
MRU 39.970379
MUR 47.030378
MVR 15.455039
MWK 1741.503736
MXN 17.458039
MYR 3.970377
MZN 63.903729
NAD 16.660377
NGN 1375.980377
NIO 36.710377
NOK 9.270804
NPR 151.803598
NZD 1.694485
OMR 0.384745
PAB 1.000201
PEN 3.507504
PGK 4.33875
PHP 61.275038
PKR 278.775038
PLN 3.627904
PYG 6151.626275
QAR 3.643504
RON 4.438104
RSD 100.106587
RUB 74.972586
RWF 1461.5
SAR 3.74998
SBD 8.04211
SCR 13.746323
SDG 600.503676
SEK 9.250404
SGD 1.274104
SHP 0.746601
SLE 24.603667
SLL 20969.496166
SOS 571.000338
SRD 37.458038
STD 20697.981008
STN 21.21
SVC 8.7523
SYP 110.524981
SZL 16.660369
THB 32.513038
TJS 9.381822
TMT 3.505
TND 2.88175
TOP 2.40776
TRY 45.142504
TTD 6.789386
TWD 31.629504
TZS 2605.000335
UAH 43.949336
UGX 3760.987334
UYU 39.889518
UZS 11950.000334
VES 488.942755
VND 26356
VUV 117.651389
WST 2.715189
XAF 560.041494
XAG 0.01327
XAU 0.000217
XCD 2.70255
XCG 1.80265
XDR 0.69563
XOF 560.000332
XPF 102.150363
YER 238.603589
ZAR 16.711304
ZMK 9001.203584
ZMW 18.67895
ZWL 321.999592
  • RBGPF

    0.5000

    63.1

    +0.79%

  • GSK

    -0.7000

    51.61

    -1.36%

  • AZN

    -2.6300

    184.74

    -1.42%

  • RELX

    -0.2400

    36.35

    -0.66%

  • BCC

    -1.1400

    78.13

    -1.46%

  • CMSC

    0.0600

    22.88

    +0.26%

  • BCE

    0.1800

    23.96

    +0.75%

  • RIO

    0.1000

    100.58

    +0.1%

  • BTI

    -0.0900

    58.71

    -0.15%

  • RYCEF

    0.5500

    16.35

    +3.36%

  • NGG

    -1.0600

    88.48

    -1.2%

  • CMSD

    0.1500

    23.28

    +0.64%

  • VOD

    0.3500

    16.15

    +2.17%

  • JRI

    -0.0100

    12.98

    -0.08%

  • BP

    -0.9700

    46.41

    -2.09%

NASA chief rules out March launch of Moon mission over technical issues
NASA chief rules out March launch of Moon mission over technical issues / Photo: © AFP/File

NASA chief rules out March launch of Moon mission over technical issues

NASA chief Jared Isaacman on Saturday ruled out a March launch for Artemis 2, the first crewed flyby mission to the Moon in more than 50 years, citing technical issues.

Text size:

Workers detected a problem with helium flow to the massive SLS rocket that will "take the March launch window out of consideration," Issacman said in a post on X.

"I understand people are disappointed by this development. That disappointment is felt most by the team at NASA, who have been working tirelessly to prepare for this great endeavor," Isaacman said.

"During the 1960s, when NASA achieved what most thought was impossible, and what has never been repeated since, there were many setbacks."

The towering SLS rocket and Orion spacecraft will be rolled back into the Vehicle Assembly Building at the Kennedy Space Center in Florida to investigate the technical issues and make any necessary repairs, Isaacman said.

A complete briefing will follow in the coming days, he added.

The highly anticipated Artemis 2 mission, lasting about 10 days, will see three Americans and one Canadian fly around Earth's satellite.

It would be a huge step towards Americans once again setting foot on the lunar surface, a goal announced by President Donald Trump in his first term.

On Friday, NASA had set March 6 as the earliest possible launch date.

The US space agency hopes to put humans back on the Moon as China forges ahead with a rival effort that is targeting 2030 at the latest for its first crewed mission.

China's uncrewed Chang'e 7 mission is expected to be launched in 2026 for an exploration of the Moon's south pole, and testing of its crewed spacecraft Mengzhou is also set to go ahead this year.

NASA surprised many late last year when it said Artemis 2 could happen as soon as February -- an acceleration explained by the Trump administration's wish to beat China to the punch.

But the program has been plagued by delays.

The uncrewed Artemis 1 mission took place in November 2022 after multiple postponements and two failed launch attempts.

Then technical problems in early February -- which included a liquid hydrogen leak -- cut short a so-called wet dress rehearsal for the Artemis 2 launch. That was finally completed earlier this week.

The wet dress rehearsal was conducted under real conditions -- with full rocket tanks and technical checks -- at Cape Canaveral in Florida, with engineers practicing the maneuvers needed to carry out an actual launch.

NASA is hoping that the Moon could be used to help prepare future missions to Mars.

P.Navarro--TFWP