The Fort Worth Press - Germany cuts the ribbon on first LNG terminal

USD -
AED 3.672978
AFN 64.999939
ALL 81.873378
AMD 378.439765
ANG 1.79008
AOA 916.999782
ARS 1444.981698
AUD 1.424096
AWG 1.8025
AZN 1.69823
BAM 1.658498
BBD 2.01317
BDT 122.152876
BGN 1.67937
BHD 0.377063
BIF 2962.5
BMD 1
BND 1.270543
BOB 6.906845
BRL 5.240599
BSD 0.999546
BTN 90.307481
BWP 13.806116
BYN 2.86383
BYR 19600
BZD 2.010235
CAD 1.363275
CDF 2199.999474
CHF 0.77521
CLF 0.021782
CLP 860.079752
CNY 6.938202
CNH 6.933695
COP 3656.5
CRC 496.408795
CUC 1
CUP 26.5
CVE 93.749767
CZK 20.583994
DJF 177.719957
DKK 6.316399
DOP 63.000338
DZD 129.868002
EGP 47.0105
ERN 15
ETB 155.042675
EUR 0.84569
FJD 2.197399
FKP 0.732491
GBP 0.73002
GEL 2.695005
GGP 0.732491
GHS 10.94506
GIP 0.732491
GMD 73.000355
GNF 8754.00015
GTQ 7.666672
GYD 209.120397
HKD 7.81311
HNL 26.408086
HRK 6.374601
HTG 131.107644
HUF 322.284047
IDR 16767
ILS 3.082015
IMP 0.732491
INR 90.438197
IQD 1309.380459
IRR 42125.000158
ISK 122.630209
JEP 0.732491
JMD 156.640605
JOD 0.709018
JPY 155.699501
KES 128.999758
KGS 87.449902
KHR 4081.490528
KMF 418.000183
KPW 899.987247
KRW 1451.098441
KWD 0.307102
KYD 0.83298
KZT 501.119346
LAK 21499.832523
LBP 89508.041026
LKR 309.380459
LRD 185.911623
LSL 16.009531
LTL 2.95274
LVL 0.60489
LYD 6.319217
MAD 9.168716
MDL 16.926717
MGA 4429.877932
MKD 52.16762
MMK 2100.119929
MNT 3568.429082
MOP 8.04357
MRU 39.901294
MUR 45.890298
MVR 15.449864
MWK 1733.257012
MXN 17.22288
MYR 3.932497
MZN 63.749837
NAD 16.009531
NGN 1392.10999
NIO 36.785781
NOK 9.61886
NPR 144.492309
NZD 1.65056
OMR 0.384493
PAB 0.999521
PEN 3.364907
PGK 4.282347
PHP 59.100503
PKR 279.545138
PLN 3.57224
PYG 6631.277242
QAR 3.634567
RON 4.309199
RSD 99.316026
RUB 76.997737
RWF 1458.783824
SAR 3.750074
SBD 8.058101
SCR 13.748799
SDG 601.501393
SEK 8.90069
SGD 1.269675
SHP 0.750259
SLE 24.474995
SLL 20969.499267
SOS 570.272883
SRD 38.114501
STD 20697.981008
STN 20.775741
SVC 8.746163
SYP 11059.574895
SZL 16.015332
THB 31.670042
TJS 9.340767
TMT 3.51
TND 2.890372
TOP 2.40776
TRY 43.4808
TTD 6.770319
TWD 31.598026
TZS 2584.039538
UAH 43.256279
UGX 3563.251531
UYU 38.49872
UZS 12236.487289
VES 371.640565
VND 26002
VUV 119.537583
WST 2.726316
XAF 556.244594
XAG 0.011731
XAU 0.000202
XCD 2.70255
XCG 1.801384
XDR 0.691072
XOF 556.244594
XPF 101.131218
YER 238.375022
ZAR 15.955099
ZMK 9001.201405
ZMW 19.615608
ZWL 321.999592
  • SCS

    0.0200

    16.14

    +0.12%

  • RBGPF

    0.1000

    82.5

    +0.12%

  • CMSD

    -0.1400

    23.94

    -0.58%

  • CMSC

    -0.0900

    23.66

    -0.38%

  • GSK

    0.8700

    53.34

    +1.63%

  • NGG

    1.6200

    86.23

    +1.88%

  • JRI

    -0.0300

    13.12

    -0.23%

  • BCC

    3.1800

    84.93

    +3.74%

  • BTI

    0.8800

    61.87

    +1.42%

  • BCE

    0.2700

    26.1

    +1.03%

  • RIO

    3.8500

    96.37

    +4%

  • RYCEF

    0.2800

    16.95

    +1.65%

  • BP

    1.1200

    38.82

    +2.89%

  • RELX

    -5.0200

    30.51

    -16.45%

  • VOD

    0.3400

    15.25

    +2.23%

  • AZN

    -4.0900

    184.32

    -2.22%

Germany cuts the ribbon on first LNG terminal
Germany cuts the ribbon on first LNG terminal / Photo: © AFP

Germany cuts the ribbon on first LNG terminal

Germany on Saturday inaugurated its first liquefied natural gas (LNG) terminal, built in record time, as the country scrambles to adapt to life without Russian energy.

Text size:

The rig in the North Sea port of Wilhelmshaven was opened by Chancellor Olaf Scholz at a ceremony on board a specialist vessel known as an FSRU, named the Hoegh Esperanza.

"It's a good day for our country and a sign to the whole world that the German economy will be able to remain strong," Scholz said from the boat.

The Hoegh Esperanza sounded its horn as the chancellor, dressed in a high visibility jacket, approached.

The ship has already been stocked with gas from Nigeria that could supply 50,000 homes for a year, and the terminal is set to begin deliveries on December 22.

Germany plans to open four more government-funded LNG terminals over the next few months as well as a private terminal in the port of Lubmin.

Together, the terminals could deliver 30 billion cubic metres of gas a year from next year, or a third of Germany's total gas needs -- if Berlin can find enough LNG to service them.

LNG terminals allow for the import by sea of natural gas which has been chilled and turned into a liquid to make it easier to transport.

The FRSU stocks the LNG, then turns it back into a ready-to-use gas.

Until now, Germany had no LNG terminals and relied on cheap gas delivered through pipelines from Russia for 55 percent of its supply.

- Supply worries -

But since Russia's invasion of Ukraine, gas supplies to Germany have been throttled and Berlin has been forced to rely on LNG processed by Belgian, French and Dutch ports, paying a premium for transport costs.

The government decided to invest in building its own LNG terminals as quickly as possible and has spent billions of euros (dollars) on hiring FSRUs to service them.

However, Germany has not yet signed a single major long-term contract to begin filling the terminals from January.

"The import capacity is there. But what worries me are the deliveries," Johan Lilliestam, a researcher at the University of Potsdam, told AFP.

A contract has been signed with Qatar for LNG to supply the Wilhelmshaven terminal but deliveries are not set to begin until 2026.

Suppliers want long-term contracts, while the German government is not keen to be locked into multi-year gas deals as it wants the country to become climate-neutral by 2045.

"Companies need to know that the purchasing side in Germany will eventually diminish if we want to meet climate protection targets," economy minister Robert Habeck has said.

Environmental campaigners have criticised the LNG project, with the DUH association announcing it will take legal action. A handful of protestors turned out in Wilhelmshaven with placards demanding an "End to gas".

- Cold winter -

Germany could initially be forced to buy LNG from the expensive spot markets, which would lead to higher prices for consumers.

The market could also be squeezed next year by renewed demand in China as it emerges from strict Covid-19 curbs, Andreas Schroeder, an expert at the ICIS energy research institute, told AFP.

"If Europe has been able to receive so much LNG in recent months, it is because Chinese demand was low," Schroeder said.

China recently signed a deal to buy gas from Qatar for 27 years -- the longest such deal in history, according to Doha.

Germany has also had a cold winter so far, meaning the gas tanks have been emptying faster than expected.

"Gas consumption is increasing. This is a risk, especially if the cold spell continues," said Klaus Mueller, the head of the country's Federal Network Agency regulatory body, in a recent interview.

As a result, there is a real risk that Germany could experience temporary supply disruptions next winter, according to Schroeder.

Gas usage is currently down 13 percent compared to last year but the government wants that figure to be closer to 20 percent.

In Europe, the gap between supply and demand could reach 27 billion cubic metres (950 billion cubic feet) in 2023, according to an IEA report -- equivalent to 6.5 percent of the European Union's annual consumption.

A.Williams--TFWP