The Fort Worth Press - Fuel leak delays preparations for NASA rocket launch

USD -
AED 3.672495
AFN 64.491965
ALL 80.819685
AMD 361.12818
ANG 1.789785
AOA 916.999774
ARS 1524.755904
AUD 1.421555
AWG 1.80125
AZN 1.698006
BAM 1.741787
BBD 2.015015
BDT 123.745402
BGN 1.747831
BHD 0.377604
BIF 3000.997453
BMD 1
BND 1.278059
BOB 11.730759
BRL 5.027097
BSD 1.000472
BTN 94.559477
BWP 13.70595
BYN 2.971479
BYR 19600
BZD 2.012094
CAD 1.404485
CDF 2315.999766
CHF 0.823855
CLF 0.024781
CLP 975.290259
CNY 6.67805
CNH 6.67482
COP 3182.19
CRC 455.529135
CUC 1
CUP 24.010794
CVE 98.199695
CZK 21.60605
DJF 178.150632
DKK 6.653225
DOP 61.440772
DZD 134.635978
EGP 54.356702
ERN 15
ETB 163.87083
EUR 0.89012
FJD 2.2538
FKP 0.747587
GBP 0.74605
GEL 2.589936
GGP 0.747587
GHS 11.660299
GIP 0.747587
GMD 73.504156
GNF 8854.987666
GTQ 7.645587
GYD 209.311853
HKD 7.847135
HNL 26.857072
HRK 6.7076
HTG 131.084908
HUF 324.795004
IDR 18048
ILS 3.09091
IMP 0.747587
INR 94.43705
IQD 1516.6493
IRR 1832375.000402
ISK 121.260321
JEP 0.747587
JMD 158.780625
JOD 0.709021
JPY 157.860501
KES 129.849897
KGS 87.450106
KHR 4068.146802
KMF 439.497294
KPW 899.999961
KRW 1325.830107
KWD 0.31006
KYD 0.833753
KZT 446.890557
LAK 22518.390538
LBP 89591.044298
LKR 332.14739
LRD 170.580744
LSL 16.412051
LTL 2.95274
LVL 0.60489
LYD 6.419294
MAD 9.819615
MDL 17.998442
MGA 4521.489767
MKD 54.903951
MMK 2099.21541
MNT 3597.533576
MOP 8.085932
MRU 40.128421
MUR 47.309704
MVR 15.460077
MWK 1734.751129
MXN 18.485085
MYR 4.081297
MZN 63.898647
NAD 16.412051
NGN 1332.179821
NIO 36.816372
NOK 9.35655
NPR 151.295341
NZD 1.75665
OMR 0.384516
PAB 1.000481
PEN 3.438421
PGK 4.479652
PHP 63.302028
PKR 276.89823
PLN 3.883845
PYG 5756.677086
QAR 3.647261
RON 4.7506
RSD 104.566998
RUB 81.872113
RWF 1478.615162
SAR 3.748965
SBD 8.07458
SCR 13.833364
SDG 601.501249
SEK 9.878075
SGD 1.27711
SHP 0.7473
SLE 23.920425
SLL 20969.504398
SOS 571.749178
SRD 37.661494
STD 20697.981008
STN 21.819089
SVC 8.754392
SYP 13001.999685
SZL 16.418788
THB 33.573502
TJS 9.214157
TMT 3.51
TND 2.986543
TOP 2.40776
TRY 49.602435
TTD 6.792416
TWD 32.365497
TZS 2644.999919
UAH 45.047334
UGX 4207.076509
UYU 40.164934
UZS 11975.562621
VES 879.788905
VND 25856.5
VUV 119.136032
WST 2.774679
XAF 583.880316
XAG 0.017358
XAU 0.00024154356
XCD 2.70255
XCG 1.803058
XDR 0.707052
XOF 583.880316
XPF 106.20998
YER 236.095747
ZAR 16.379565
ZMK 9001.201607
ZMW 20.069287
ZWL 321.999592
SSP 5787.554334
MXV 2.08653
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Fuel leak delays preparations for NASA rocket launch
Fuel leak delays preparations for NASA rocket launch / Photo: © AFP

Fuel leak delays preparations for NASA rocket launch

As NASA on Saturday resumed its second effort to get its new 30-story rocket off the ground and send its uncrewed test capsule toward the Moon, engineers detected a fuel leak that potentially could lead to a new delay.

Text size:

With millions around the globe and hundreds of thousands on nearby beaches waiting for the historic launch of the massive Space Launch System (SLS), a leak near the base of the rocket was found as ultra-cold liquid hydrogen was being pumped in.

NASA said engineers would "stop flowing liquid hydrogen to the tank, close the valve used to fill and drain it," then try to reseal it.

The space agency offered no information on the likelihood of a new delay in the Artemis program -- which aims eventually to return a human crew to the Moon -- following Monday's aborted effort.

Saturday's launch is still scheduled for 2:17 pm (1817 GMT) from Kennedy Space Center in Florida. It can be delayed by up to two hours if necessary.

"Our team is ready," Jeremy Parsons, deputy manager of exploration ground systems at Kennedy Space Center, had said Friday.

"They are getting better with every attempt and actually performed superbly during launch countdown number one... I think if the conditions with weather and the hardware align, we'll absolutely go."

Though the area around the launch site will be closed to the public, an estimated 400,000 people were gathering on beaches nearby to see -- and hear -- the most powerful vehicle that NASA has ever launched climb into space.

The initial launch attempt was halted after engineers detected a fuel leak and a sensor showed that one of the rocket's four main engines was too hot.

Both issues have since been resolved, the launch team said.

Shortly before 06:00 am (1000 GMT) Saturday, launch director Charlie Blackwell-Thompson had given the go-ahead to start filling the rocket's tanks with cryogenic fuel.

About three million liters of ultra-cold liquid hydrogen and oxygen was expected to be pumped into the spacecraft.

And the weather appeared to be cooperating: the US Space Force predicts a 60 percent chance of favorable weather at the scheduled liftoff time, growing to 80 percent later in the launch window.

If something requires NASA to stand down again on Saturday, there are backup opportunities on Monday or Tuesday. After that, the next launch window will not be until September 19, due to the Moon's position.

The purpose of the Artemis 1 mission is to verify that the Orion capsule, which sits atop the SLS rocket, is safe to carry astronauts in the future.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

- Apollo's twin sister -

It will take several days for the spacecraft to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach. The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

The trip is expected to last around six weeks and one of its main objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth's atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

Fittingly, NASA's first woman launch director, Blackwell-Thompson, will give the final "go" for liftoff on Saturday.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns.

A government audit estimates the program's cost will grow to $93 billion by 2025, with each of its first four missions clocking in at a whopping $4.1 billion per launch.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with later missions envisaging a lunar space station and a sustainable presence on the lunar surface.

According to NASA chief Bill Nelson, a crewed trip to the red planet aboard Orion, which would last several years, could be attempted by the end of the 2030s.

S.Jordan--TFWP