The Fort Worth Press - Engine issue threatens delay of NASA Moon rocket

USD -
AED 3.6725
AFN 64.497478
ALL 80.734582
AMD 360.878684
ANG 1.789785
AOA 916.999885
ARS 1524.759297
AUD 1.42365
AWG 1.80125
AZN 1.701071
BAM 1.741872
BBD 2.010322
BDT 123.466466
BGN 1.747831
BHD 0.376821
BIF 2996.486509
BMD 1
BND 1.276346
BOB 11.673339
BRL 5.028102
BSD 0.998116
BTN 94.783201
BWP 13.703949
BYN 2.976965
BYR 19600
BZD 2.007472
CAD 1.40533
CDF 2315.999929
CHF 0.824575
CLF 0.02478
CLP 975.260114
CNY 6.67805
CNH 6.675965
COP 3180.08
CRC 453.324902
CUC 1
CUP 23.955861
CVE 98.204067
CZK 21.6566
DJF 177.749674
DKK 6.66442
DOP 61.408157
DZD 134.67101
EGP 54.378197
ERN 15
ETB 163.042175
EUR 0.89164
FJD 2.253802
FKP 0.747587
GBP 0.746755
GEL 2.589959
GGP 0.747587
GHS 11.633261
GIP 0.747587
GMD 73.497576
GNF 8834.937189
GTQ 7.628149
GYD 208.769922
HKD 7.84713
HNL 26.791591
HRK 6.715797
HTG 130.707196
HUF 325.626502
IDR 18056.25
ILS 3.092745
IMP 0.747587
INR 94.600801
IQD 1513.250179
IRR 1832375.000226
ISK 121.429949
JEP 0.747587
JMD 158.414343
JOD 0.709022
JPY 158.119501
KES 129.92033
KGS 87.449864
KHR 4059.43989
KMF 439.510149
KPW 899.999961
KRW 1325.119986
KWD 0.31001
KYD 0.831838
KZT 449.121182
LAK 22457.930899
LBP 89472.254266
LKR 331.042959
LRD 170.188321
LSL 16.442016
LTL 2.95274
LVL 0.60489
LYD 6.402658
MAD 9.782021
MDL 17.906141
MGA 4542.155208
MKD 54.902188
MMK 2099.21541
MNT 3597.533576
MOP 8.069361
MRU 40.034198
MUR 47.31015
MVR 15.460015
MWK 1730.82832
MXN 18.529275
MYR 4.080203
MZN 63.882634
NAD 16.442602
NGN 1331.392783
NIO 36.729114
NOK 9.381095
NPR 151.652766
NZD 1.758845
OMR 0.384498
PAB 0.998205
PEN 3.441974
PGK 4.465916
PHP 63.471987
PKR 276.265992
PLN 3.89059
PYG 5729.145794
QAR 3.628291
RON 4.751496
RSD 104.700985
RUB 82.098496
RWF 1473.795772
SAR 3.751186
SBD 8.07458
SCR 13.842733
SDG 601.498782
SEK 9.90856
SGD 1.278185
SHP 0.7473
SLE 23.92025
SLL 20969.504398
SOS 570.441257
SRD 37.661498
STD 20697.981008
STN 21.820157
SVC 8.734297
SYP 13001.999685
SZL 16.439039
THB 33.643997
TJS 9.217992
TMT 3.51
TND 2.978051
TOP 2.40776
TRY 49.6029
TTD 6.774936
TWD 32.40703
TZS 2648.673015
UAH 44.986841
UGX 4162.751655
UYU 40.042215
UZS 12022.461403
VES 879.788896
VND 25868.5
VUV 119.136032
WST 2.774679
XAF 584.877602
XAG 0.017471
XAU 0.000242675154
XCD 2.70255
XCG 1.798961
XDR 0.707052
XOF 584.877602
XPF 106.215182
YER 236.089175
ZAR 16.432235
ZMK 9001.199676
ZMW 19.987443
ZWL 321.999592
SSP 5787.554334
MXV 2.091518
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Engine issue threatens delay of NASA Moon rocket
Engine issue threatens delay of NASA Moon rocket / Photo: © AFP

Engine issue threatens delay of NASA Moon rocket

An engine problem threatened to delay the launch on Monday of NASA's most powerful rocket yet on an uncrewed test flight to take humans back to the Moon and eventually to Mars.

Text size:

Blastoff, which had been planned for 8:33 am (1233 GMT), was put on hold because of a temperature issue with one of the four engines on the 322-foot (98-meter) Space Launch System (SLS) rocket, the US space agency said.

Tens of thousands of people -- including US Vice President Kamala Harris -- have gathered along the beach near the Kennedy Space Center in Florida to watch the launch, which comes 50 years after Apollo 17 astronauts last set foot on the Moon.

The goal of the flight, dubbed Artemis 1, is to test the SLS and the Orion crew capsule that sits atop the rocket. Mannequins equipped with sensors are standing in for a crew for the mission.

Overnight operations to fill the rocket with more than three million liters of ultra-cold liquid hydrogen and oxygen were briefly delayed by a high risk of lightning, though it was a "go" after an hour.

Around 3:00 am, another hiccup emerged: a potential leak was detected during the filling of the main stage with hydrogen, causing a pause.

After tests, the flow resumed.

"The leak is at an acceptable level and we have returned to fast fill operations," NASA tweeted.

But NASA engineers later detected a problem with the temperature in one of the four engines and put a hold on the countdown. NASA has a two-hour window Monday in which to carry out the launch.

The massive orange-and-white rocket, which has been sitting on the space center's Launch Complex 39B for more than a week, is not able to take off in case of rains and storms.

If Monday's launch is scrubbed, September 2 and 5 have been penciled in as alternative flight dates.

The rocket's Orion capsule is set to orbit the Moon to see if the vessel is safe for people in the near future. At some point, Artemis aims to put a woman and a person of color on the Moon for the first time.

"This mission goes with a lot of hopes and dreams of a lot of people. And we now are the Artemis generation," NASA Administrator Bill Nelson said.

In another first, a woman -- Charlie Blackwell-Thompson -- will give the final green light for liftoff.

Women now account for 30 percent of the control room staff, compared to one for the Apollo 11 mission -- the first time astronauts landed on the moon in 1969.

- Extreme temperatures -

During the 42-day trip, the Orion capsule will orbit the Moon, coming within 60 miles (100 kilometers) at its closest approach, and then fire its engines to shoot out 40,000 miles -- a record for a spacecraft rated to carry humans.

One of the mission's primary objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth's atmosphere, the heat shield will have to withstand a speed of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- or half as hot as the Sun.

The dummies aboard the spacecraft will record acceleration, vibration and radiation levels.

The craft will deploy small satellites to study the lunar surface.

A complete failure would be devastating for a program costing $4.1 billion per launch that is already years behind schedule.

- Life on the Moon -

Monday's launch is "not a near-term sprint, but a long-term marathon to bring the solar system and beyond into our sphere," said Bhavya Lal, NASA associate administrator for technology, policy and strategy.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface. The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

The Artemis program is to establish a lasting human presence on the Moon with an orbiting space station known as Gateway and a base on the surface.

Gateway would serve as a staging and refueling station for a voyage to Mars that would take a minimum of several months.

F.Carrillo--TFWP