The Fort Worth Press - Kenya, Uganda open rail extension burdened by Chinese debt

USD -
AED 3.672502
AFN 65.497724
ALL 79.240219
AMD 364.559627
ANG 1.789783
AOA 917.9997
ARS 1514.244966
AUD 1.393088
AWG 1.8
AZN 1.701804
BAM 1.676805
BBD 2.013726
BDT 122.784756
BGN 1.696366
BHD 0.376979
BIF 2990
BMD 1
BND 1.269981
BOB 11.543259
BRL 5.148902
BSD 0.999833
BTN 95.347711
BWP 13.36094
BYN 3.015274
BYR 19600
BZD 2.010777
CAD 1.38794
CDF 2274.999564
CHF 0.805135
CLF 0.023369
CLP 919.720083
CNY 6.72275
CNH 6.721061
COP 3129.61
CRC 454.305788
CUC 1
CUP 26.5
CVE 95.050124
CZK 20.703698
DJF 177.72001
DKK 6.41365
DOP 58.274974
DZD 133.067978
EGP 50.220702
ERN 15
ETB 160.590193
EUR 0.8579
FJD 2.19355
FKP 0.733198
GBP 0.735635
GEL 2.596719
GGP 0.733198
GHS 11.194986
GIP 0.733198
GMD 73.498647
GNF 8777.499363
GTQ 7.627842
GYD 209.170835
HKD 7.83915
HNL 26.879741
HRK 6.464105
HTG 130.804745
HUF 310.710307
IDR 17774
ILS 2.97955
IMP 0.733198
INR 95.43055
IQD 1310.5
IRR 1374575.000235
ISK 120.659806
JEP 0.733198
JMD 158.425603
JOD 0.70903
JPY 159.175017
KES 129.419955
KGS 87.449441
KHR 4044.999836
KMF 423.000326
KPW 900.000294
KRW 1384.499549
KWD 0.30871
KYD 0.833173
KZT 459.939215
LAK 22420.000094
LBP 89550.000312
LKR 328.532236
LRD 181.724998
LSL 15.470374
LTL 2.95274
LVL 0.60489
LYD 6.335055
MAD 9.26375
MDL 17.277314
MGA 4335.000252
MKD 52.794391
MMK 2099.669013
MNT 3598.834072
MOP 8.072549
MRU 40.104675
MUR 46.760221
MVR 15.460032
MWK 1736.000113
MXN 16.949075
MYR 4.026404
MZN 63.904964
NAD 15.970368
NGN 1344.760166
NIO 36.720302
NOK 9.349403
NPR 152.560261
NZD 1.68159
OMR 0.384488
PAB 0.999816
PEN 3.350996
PGK 4.429028
PHP 61.665021
PKR 277.550036
PLN 3.69959
PYG 5981.652949
QAR 3.64525
RON 4.510498
RSD 100.640996
RUB 84.399324
RWF 1470
SAR 3.758163
SBD 8.000128
SCR 13.800469
SDG 601.000486
SEK 9.52788
SGD 1.27149
SHP 0.740866
SLE 24.693849
SLL 20969.499227
SOS 571.494587
SRD 37.7595
STD 20697.981008
STN 21.35
SVC 8.748398
SYP 13001.999906
SZL 15.970056
THB 32.811008
TJS 9.228191
TMT 3.51
TND 2.895497
TOP 2.40776
TRY 48.134897
TTD 6.792608
TWD 31.820899
TZS 2639.997976
UAH 44.547641
UGX 3737.187978
UYU 40.183987
UZS 11825.000134
VES 786.285301
VND 26105
VUV 118.051417
WST 2.710032
XAF 562.379811
XAG 0.014523
XAU 0.000216
XCD 2.70255
XCG 1.801962
XDR 0.707052
XOF 562.504454
XPF 102.649735
YER 237.050151
ZAR 15.95856
ZMK 9001.195377
ZMW 18.970949
ZWL 321.999592
  • RBGPF

    1.3300

    69.89

    +1.9%

  • CMSD

    -0.1000

    21.16

    -0.47%

  • CMSC

    -0.0650

    21.275

    -0.31%

  • BCE

    -0.1000

    23.49

    -0.43%

  • BCC

    -1.1000

    79.94

    -1.38%

  • AZN

    -3.3900

    166.27

    -2.04%

  • GSK

    -0.6400

    51.43

    -1.24%

  • RIO

    -2.1100

    104.7

    -2.02%

  • RYCEF

    0.3500

    21.15

    +1.65%

  • JRI

    -0.0400

    12.44

    -0.32%

  • RELX

    -0.5400

    35.34

    -1.53%

  • VOD

    -0.1900

    15.94

    -1.19%

  • BP

    -0.3600

    42.5

    -0.85%

  • BTI

    0.9700

    57.44

    +1.69%

  • NGG

    -0.6400

    80.53

    -0.79%

Kenya, Uganda open rail extension burdened by Chinese debt
Kenya, Uganda open rail extension burdened by Chinese debt / Photo: © AFP/File

Kenya, Uganda open rail extension burdened by Chinese debt

The presidents of Kenya and Uganda met near their shared border Saturday to mark the multi-billion-dollar, long-delayed extension of a Chinese-built railway that has left Kenya heavily in debt.

Text size:

The Standard Gauge Railway, built from 2013 to 2019, connects the Kenyan port of Mombasa to its capital Nairobi, and on to the lake town of Naivasha, but China refused further lending before it could be extended to Uganda as planned.

Kenya now spends roughly $1 billion a year servicing Chinese debt, most of it borrowed to build the railway.

That is far more than the line generates in revenue -- around $165 million last year -- even if passenger and cargo numbers have been growing strongly over the past year.

A report by Kenya's auditor general last year found more than $260 million had been wasted just on penalties and interest from late debt payments.

Yet despite the controversy over the cost, Kenya has been keen to finish the line.

Kenyan President William Ruto said the rail link will "define generations", speaking at a ceremony in grand pomp and circumstance with his Ugandan counterpart Yoweri Museveni in Kisumu, near the Kenya-Uganda border.

Ruto argued the line would slash logistics costs that "undermine competitiveness" in east Africa.

If the ambitious building schedule is to be believed, the line is due to reach Kisumu by June 2027. The next phase will then take the line to Malaba, a town on the border.

"Cargo takes an average of 80 hours to move from Mombasa to Malaba and more than 100 hours to reach Kampala," the Ugandan capital, Ruto said.

"We cannot build prosperity on inefficiency."

- 'Irrational and wasteful' -

Museveni said the line would reduce the inefficiencies in his own country's infrastructure.

"The railway is part of the rationalisation of our transport system, especially on the Uganda side, which is irrational and wasteful," the veteran leader told the ceremony.

Ruto broke ground on the next phase in Narok County on Thursday, arguing that it will create jobs and reduce road congestion.

"We have thought through this project (and)... its finance," he insisted.

Treasury estimates say the overall cost will be more than 500 billion shillings ($3.9 billion), according to Kenya's Business Daily.

Kenya is not taking more cash from Chinese banks this time -- instead borrowing against future cargo taxes -- though it is partnering with Chinese transport firms to build the new phase.

China lent Kenya $9.7 billion between 2000 and 2019, according to the Chinese Loans to Africa Database by Boston University, with around half of that going to the railway.

It stopped lending from 2020 to 2023 as Kenya struggled to make repayments, at a time when China revised its broader lending strategy in Africa.

Kenya considers the railway extension crucial for strengthening trade through east and central Africa, hoping to reach landlocked countries such as Uganda, Rwanda, South Sudan and the mineral-rich Democratic Republic of Congo.

M.McCoy--TFWP