The Fort Worth Press - Work Underway at Pathfinder for First Gas-To-Power Data Centre Operation

USD -
AED 3.672504
AFN 64.000368
ALL 81.218818
AMD 360.140403
ANG 1.789785
AOA 918.000367
ARS 1535.901041
AUD 1.422162
AWG 1.8025
AZN 1.70397
BAM 1.747092
BBD 2.014338
BDT 124.158076
BGN 1.747831
BHD 0.377606
BIF 3001.375712
BMD 1
BND 1.27771
BOB 12.126707
BRL 5.444041
BSD 1.000156
BTN 94.912544
BWP 13.81787
BYN 2.946066
BYR 19600
BZD 2.011399
CAD 1.395705
CDF 2315.000362
CHF 0.82388
CLF 0.025122
CLP 991.960396
CNY 6.661104
CNH 6.65376
COP 3194.61
CRC 454.787056
CUC 1
CUP 24.001751
CVE 98.497943
CZK 21.826604
DJF 177.720393
DKK 6.69771
DOP 60.620679
DZD 135.836762
EGP 55.999304
ERN 15
ETB 161.461739
EUR 0.89621
FJD 2.243704
FKP 0.747647
GBP 0.746735
GEL 2.603861
GGP 0.747647
GHS 11.651465
GIP 0.747647
GMD 74.000355
GNF 8851.589159
GTQ 7.645651
GYD 209.633474
HKD 7.84405
HNL 26.880818
HRK 6.76901
HTG 131.032142
HUF 327.808504
IDR 18157
ILS 3.14456
IMP 0.747647
INR 94.97545
IQD 1516.088114
IRR 1868415.000352
ISK 121.903814
JEP 0.747647
JMD 158.924129
JOD 0.70904
JPY 157.42404
KES 129.870385
KGS 87.448704
KHR 4080.593508
KMF 441.00035
KPW 899.999961
KRW 1334.320383
KWD 0.31115
KYD 0.833434
KZT 453.459704
LAK 22517.911061
LBP 89559.597295
LKR 332.651457
LRD 170.008263
LSL 16.666696
LTL 2.95274
LVL 0.60489
LYD 6.428964
MAD 9.833447
MDL 17.902128
MGA 4523.771239
MKD 55.008665
MMK 2099.909661
MNT 3597.883233
MOP 8.081288
MRU 40.55493
MUR 47.280378
MVR 15.450378
MWK 1733.828824
MXN 18.790835
MYR 4.058204
MZN 63.910377
NAD 16.666696
NGN 1346.210377
NIO 36.803459
NOK 9.198635
NPR 151.859892
NZD 1.77492
OMR 0.384513
PAB 1.00025
PEN 3.46149
PGK 4.551281
PHP 63.685038
PKR 276.672235
PLN 3.946904
PYG 5859.074911
QAR 3.645686
RON 4.783204
RSD 105.270373
RUB 80.670664
RWF 1476.317024
SAR 3.7544
SBD 8.058206
SCR 13.773786
SDG 601.503676
SEK 9.82292
SGD 1.277985
SHP 0.748335
SLE 22.903667
SLL 20969.504398
SOS 571.533215
SRD 37.619504
STD 20697.981008
STN 21.886236
SVC 8.750648
SYP 13001.999685
SZL 16.6622
THB 33.790369
TJS 9.205654
TMT 3.5
TND 2.990728
TOP 2.40776
TRY 49.947704
TTD 6.780948
TWD 32.642038
TZS 2641.198038
UAH 45.361884
UGX 4250.396409
UYU 40.208322
UZS 11995.497668
VES 887.479804
VND 25803.5
VUV 119.217464
WST 2.773901
XAF 587.875497
XAG 0.020402
XAU 0.000257631363
XCD 2.70255
XCG 1.802387
XDR 0.707052
XOF 587.875497
XPF 106.533507
YER 236.203589
ZAR 16.72541
ZMK 9001.203584
ZMW 20.167407
ZWL 321.999592
SSP 5745.199062
MXV 2.11783
  • RIO

    -0.3300

    97.04

    -0.34%

  • CMSC

    -0.0400

    20.67

    -0.19%

  • RELX

    0.0000

    33.41

    0%

  • RBGPF

    0.0000

    67.95

    0%

  • BCE

    -0.0700

    21.99

    -0.32%

  • BCC

    -0.0300

    75.66

    -0.04%

  • GSK

    0.8600

    51.08

    +1.68%

  • JRI

    -0.0300

    11.52

    -0.26%

  • NGG

    -0.1200

    76.68

    -0.16%

  • CMSD

    0.0900

    20.54

    +0.44%

  • BTI

    -0.0800

    55.75

    -0.14%

  • AZN

    2.0200

    168.1

    +1.2%

  • BP

    -1.4200

    43.16

    -3.29%

  • RYCEF

    0.4600

    19.7

    +2.34%

  • VOD

    0.0700

    17.02

    +0.41%

Work Underway at Pathfinder for First Gas-To-Power Data Centre Operation
Work Underway at Pathfinder for First Gas-To-Power Data Centre Operation

Work Underway at Pathfinder for First Gas-To-Power Data Centre Operation

HIGHLIGHTS

Text size:

  • First two modular centres ('MDCs') delivered to AXP's site with interconnection to gas-fired generators scheduled to commence this weekend;

  • The modular data centres operated by Blackhart Technologies will host589 Bitmain S19J Pro (104T) Antminers used for Bitcoin mining (see images below);

  • AXP will focus on its core operations and earn revenue from gas-to-power supply infrastructure maintenance and power uptime bonuses to support Blackhart's Bitcoin mining operations;

  • Additional modular data centres are earmarked for two more sites, JW Powell and Kelce Court, with further expansion anticipated beyond this;

  • The JDA with Blackhart represents the first step in AXP monetizing the large amounts of stranded gas at its Pathfinder Field in Colorado. Pathfinder's Contingent Resources (2C)1 of 744 BCF of gas has the necessary scale to underpin a significant off-grid power generation operation to service data processing activities.

(ASX:AXP)(OTC PINK:AUNXF), ('AXP', 'Company') is pleased to provide this update regarding connection of the first two modular data centres under the Joint Development Agreement ('JDA') recently announced with US-based Blackhart Technologies Ltd, ('Blackhart').

The Company has received the first two modular containers (MDCs) and 589 Bitmain S19J Pro Antminers which Blackhart will use for Bitcoin mining activities and which will be housed within the MDCs. AXP will supply natural gas, power generation equipment and electricity for the site's planned data processing operations, in addition to providing installation, commissioning, maintenance and equipment servicing support.

The first two MDCs are expected to be connected this weekend subject to weather. Wet weather in the past week has caused some minor delays in set up activities. AXP's focus is to ensure it can deliver reliable and consistent gas supply and power generation to this first operation before commencing the setup of two more operations at the JW Powell and Kelce Court sites under the JDA with Blackhart.

The very large 744 BCF Contingent Resources (2C)1 of gas at the Pathfinder Field has the scope to underpin a large off-grid power generation operation here for end users such as Blackhart who see considerable appeal in the asset's scale. The JDA with them represents the first step in AXP unlocking the potential value of the natural gas from this field.

1Refer to ASX announcement dated 20 September 2024 - 'Reserves & Contingent Resources Update'

Comment

CEO Tim Hart commented: "We are encouraged by the speed at which Blackhart has deployed equipment to site and their willingness to establish this first operation at the Pathfinder #2 well. It reflects their commitment to the recently announced Joint Development Agreement. As confirmed today, Blackhart's data processing operations centre on Bitcoin mining with AXP delivering the necessary gas and power generation activities to support these activities. Pathfinder is a very large stranded natural gas resource and this initial site is the first step in establishing a large off-grid power generation operation here. We will provide another update as the first modules are brought online this weekend."

MDCS BEING UNLOADED IN COLORADO
MDCS ON SITE - COLORADO
ANTMINERS IN STORAGE AT AXP'S COLORADO PREMISES READY FOR INSTALLATION

The Company confirms that it is not aware of any new information or data that materially affects the R&R assessment. All material assumptions and technical parameters utilised in carrying out the assessment continue to apply and have not materially changed.

This announcement has been authorised by the Board of AXP Energy Limited.

FURTHER INFORMATION

Sam Jarvis, Non-Executive Chairman: 0418 165 686

For US-based inquiries please contact Tim Hart Chief Executive Officer: +1 (303) 999-5420

Released through: Ben Jarvis, Six Degrees Investor Relations: 0413150 448 [email protected]

ABOUT AXP ENERGY LIMITED

AXP ENERGY Limited (ASX: AXP, OTC: AUNXF) is an oil & gas production and development company with core operations in Colorado. AXP is focused on repurposing stranded gas at its 100%-owned Pathfinder Field for power generation and plans to sell this power to data centre operators and owners focused on High Performance Computing (HPC) including AI, rendering and other high processor intensive operations. It has secured its first customer with Blackhart Technologies LLC. AXP has 24 operating oil & gas wells at its Pathfinder Field.

DISCLAIMER

This announcement contains or may contain "forward looking statements" within the meaning of Section 27A of the Securities Act of1933 and Section 21B of the Securities Exchange Act of 1934. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, goals, assumptions or future events or performance are not statements of historical fact and may be "forward looking statements." Forward looking statements are based on expectations, estimates and projections at the time the statements are made that involve a number of risks and uncertainties which could cause actual results or events to differ materially from those presently anticipated. Forward looking statements in this action may be identified through the use of words such as "expects", "will," "anticipates," "estimates," "believes," or statements indicating certain actions "may," "could," or "might" occur. Hydrocarbon production rates fluctuate over time due to reservoir pressures, depletion, down time for maintenance and other factors. The Company does not represent that quoted hydrocarbon production rates will continue indefinitely.

SOURCE: AXP Energy Limited

W.Matthews--TFWP